Planning application number: 21/3136/FUL

Site address

Richmond Upon Thames College Langhorn Drive Twickenham TW2 7SJ (View Site Plan)

View

Status:

Granted Permission 28/02/2023

Latest: Decision Issued

Level: Committee Decision

Details

Proposal

Demolition of existing college buildings, removal of hard-surfacing, site clearance and groundworks together with the redevelopment of the site to provide new residential units; together with associated parking, cycle parking, open space and landscaping.

Type

Full Application

Ward

ST MARGARETS AND NORTH TWICKENHAM WARD

Applicant

Show applicant details

Agent

Greg Pitt 7 Soho Square London W1D 3QB

Officer

Simon Graham-Smith

Site plan

View Site Plan

Progress

A decision has been issued by the authority.

A copy of the decision notice will appear in the case file soon, and within a maximum of two weeks.
  • Application Received: 03/09/2021
  • Validated: 27/09/2021
  • Neighbour notification started: 08/08/2022
  • Neighbour notification ended: 05/11/2021
  • Decision Issued: 28/02/2023

Documents and images

DescriptionReferenceDate Published
Appendix 1.1 - Location of Info within ES  06 Sep 2021
Appendix 1.2 - Statement of Expertise  06 Sep 2021
Appendix 2.1 - EIA Scoping Report  06 Sep 2021
Appendix 2.2 - Archaeological Desk Based Assessment  06 Sep 2021
Appendix 2.3 - Preliminary Ecological Appraisal  06 Sep 2021
Appendix 2.4 - FRA and Drainage Strategy_Part1  06 Sep 2021
Appendix 2.4 - FRA and Drainage Strategy_Part2  06 Sep 2021
Appendix 2.4 - FRA and Drainage Strategy_Part3  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part1  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part10  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part2  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part3  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part4  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part5  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part6  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part7  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part8  06 Sep 2021
Appendix 3.1 - Detailed Drawings_Part9  06 Sep 2021
Appendix 3.2 - Energy and Sustainability Statement  06 Sep 2021
Appendix 5.1 - CEMP_Part1  06 Sep 2021
Appendix 5.1 - CEMP_Part2  06 Sep 2021
Appendix 5.1 - CEMP_Part3  06 Sep 2021
Appendix 6.1 - Planning Policy  06 Sep 2021
Appendix 6.2 - Baseline Conditions  06 Sep 2021
Appendix 6.3 - Methodology  06 Sep 2021
Appendix 6.4 - Townscape Assessment  06 Sep 2021
Appendix 6.5 - Visual Assessment  06 Sep 2021
Appendix 6.6 - Cumulative Assessment  06 Sep 2021
Appendix 7.1 - Transport Assessment_Part1  06 Sep 2021
Appendix 7.1 - Transport Assessment_Part2  06 Sep 2021
Appendix 7.1 - Transport Assessment_Part3  06 Sep 2021
Appendix 7.2 - Residential Travel Plan  06 Sep 2021
Appendix 7.3 - Framework Delivery and Servicing Management Plan  06 Sep 2021
Appendix 7.4 - Department for Transport Traffic Counts  06 Sep 2021
Appendix 8.1 - Assessment Input Data  06 Sep 2021
Appendix 8.2 - Air Quality - Air Quality Neutral Assessment  06 Sep 2021
Appendix 8.3 - Air Quality - Glossary and Abbreviations  06 Sep 2021
Appendix 9.1 - Noise Modelling Results  06 Sep 2021
Appendix 9.2 - Noise Exposure Contours for Heathrow Airport 2014  06 Sep 2021
Arboricultural Impact Assessment  06 Sep 2021
Arboricultural Method Statement  06 Sep 2021
Arboricultural Survey  06 Sep 2021
Biodiversity Net Gain Assessment  06 Sep 2021
Circular Economy Statement-Rev B  06 Sep 2021
Construction Environmental Management Plan Part1  06 Sep 2021
Construction Environmental Management Plan Part2  06 Sep 2021
Construction Environmental Management Plan Part3  06 Sep 2021
Daylight & Sunlight Report  06 Sep 2021
DELIVERY & SERVICING MANAGEMENT PLAN  06 Sep 2021
DESIGN ACCESS STATEMENT Part 1  06 Sep 2021
DESIGN ACCESS STATEMENT Part 2  06 Sep 2021
DESIGN ACCESS STATEMENT Part 3  06 Sep 2021
DESIGN ACCESS STATEMENT Part 4  06 Sep 2021
DESIGN ACCESS STATEMENT Part 5  06 Sep 2021
DESIGN ACCESS STATEMENT Part 6  06 Sep 2021
DESIGN ACCESS STATEMENT Part 7  06 Sep 2021
Desk Based Assessment  06 Sep 2021
Energy and Sustainability Statement-Rev E Part 1  06 Sep 2021
Energy and Sustainability Statement-Rev E Part 2  06 Sep 2021
Environmental Statement Chapter 1 Introduction  06 Sep 2021
Environmental Statement Chapter 10 Summary  06 Sep 2021
Environmental Statement Chapter 2 EIA Methodology  06 Sep 2021
Environmental Statement Chapter 3 Site and Development  06 Sep 2021
Environmental Statement Chapter 4 Alternatives  06 Sep 2021
Environmental Statement Chapter 5 Construction  06 Sep 2021
Environmental Statement Chapter 6 Townscape and Visual Effects  06 Sep 2021
Environmental Statement Chapter 7 Transport and Access  06 Sep 2021
Environmental Statement Chapter 8 Air Quality  06 Sep 2021
Environmental Statement Chapter 9 Noise  06 Sep 2021
Environmental Statement Vol 1 - Main Text and Figures_Contents  06 Sep 2021
Environmental Statement Vol 2 - Appendices_Contents  06 Sep 2021
Equalities Impact Assessment  06 Sep 2021
ES Non-technical Summary_Final Part 1  06 Sep 2021
ES Non-technical Summary_Final Part 2  06 Sep 2021
Figure 1.1 - Site Location Plan  06 Sep 2021
Figure 2.1 - Cumulative Schemes Plan  06 Sep 2021
Figure 3.1 - Landscape GA Plan  06 Sep 2021
Figure 8.1 - Monitoring Locations  06 Sep 2021
Figure 8.10 - ADMS Roads Inputs  06 Sep 2021
Figure 8.2 - Wind Rose Data  06 Sep 2021
Figure 8.3 - Sensitive receptors locations  06 Sep 2021
Figure 8.4 - Predicted annual mean NO2 Do-Min  06 Sep 2021
Figure 8.5 - Predicted annual mean NO2 Do-Something  06 Sep 2021
Figure 8.6 - Predicted annual mean PM10 Do-Min  06 Sep 2021
Figure 8.7 - Predicted annual mean PM10 Do-Something  06 Sep 2021
Figure 8.8 - Predicted days PM10 concs Do-Min  06 Sep 2021
Figure 8.9 - Predicted days PM10 concs Do-Something  06 Sep 2021
Figure 9.1 - Noise Monitoring Locations  06 Sep 2021
Fire Strategy Report  06 Sep 2021
FLOOD RISK ASSESSMENT & Drainage Strategy Part 1  06 Sep 2021
FLOOD RISK ASSESSMENT & Drainage Strategy Part 2  06 Sep 2021
FLOOD RISK ASSESSMENT & Drainage Strategy Part 3  06 Sep 2021
Health Impact Assessment  06 Sep 2021
Landscape Management and Maintenance Plan  06 Sep 2021
Landscape Planting Plan 3775-LB-ZZ-ZZ-DR-L-21000006 Sep 2021
Planning Statement  06 Sep 2021
Preliminary Ecological Appraisal  06 Sep 2021
Statement of Community Involvement  06 Sep 2021
Transport Assessment Part1  06 Sep 2021
Transport Assessment Part2  06 Sep 2021
Transport Assessment Part3  06 Sep 2021
Travel Plan  06 Sep 2021
Residential Standards Statemen  27 Sep 2021
Appendix 1.1 Location of Information within ES  21 Apr 2022
Appendix 1.2 Statement of Expertise  21 Apr 2022
Appendix 10.1 GLA Population Yield Calculator Outputs  21 Apr 2022
Appendix 10.2 PHE LBRuT  21 Apr 2022
Appendix 2.1 Scoping Report  21 Apr 2022
Appendix 2.2 Scoping Correspondence with LBRuT  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part1  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part10  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part2  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part3  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part4  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part5  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part6  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part7  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part8  21 Apr 2022
Appendix 3.1 - Detailed Drawings_Part9  21 Apr 2022
Appendix 3.2 Detailed Drawings  21 Apr 2022
Appendix 3.2 Drawings RuTC Planning App  21 Apr 2022
Appendix 3.3 - Detailed Drawings_Part 3  21 Apr 2022
Appendix 3.3 - Detailed Drawings_Part1  21 Apr 2022
Appendix 3.3 - Detailed Drawings_Part2  21 Apr 2022
Appendix 5.1 CEMP_Part1  21 Apr 2022
Appendix 5.1 CEMP_Part2  21 Apr 2022
Appendix 5.1 CEMP_Part3  21 Apr 2022
Appendix 5.2 RTS CELMP  21 Apr 2022
Appendix 5.3 RuTC CELMP  21 Apr 2022
Appendix 6.1 Policy  21 Apr 2022
Appendix 6.2 Baseline_1  21 Apr 2022
Appendix 6.2 Baseline_2  21 Apr 2022
Appendix 6.2 Baseline_3  21 Apr 2022
Appendix 6.2 Baseline_4  21 Apr 2022
Appendix 6.3 Methodology  21 Apr 2022
Appendix 6.4 Townscape Assessment  21 Apr 2022
Appendix 6.5 Visual Assessment_1  21 Apr 2022
Appendix 6.5 Visual Assessment_2  21 Apr 2022
Appendix 6.5 Visual Assessment_3  21 Apr 2022
Appendix 6.6 Cumulative Assessment  21 Apr 2022
Appendix 6.7 Verified View Methodology  21 Apr 2022
Appendix 7.1 Transport Assessment Part1  21 Apr 2022
Appendix 7.1 Transport Assessment Part2  21 Apr 2022
Appendix 7.10 Mini-bus & Coach Management Plan  21 Apr 2022
Appendix 7.11 College TP  21 Apr 2022
Appendix 7.12 TP07 Travel Plan Statement 5453  21 Apr 2022
Appendix 7.1l Transport Assessment Part3  21 Apr 2022
Appendix 7.2 Transport Statement Part1  21 Apr 2022
Appendix 7.2 Transport Statement Part2  21 Apr 2022
Appendix 7.2 Transport Statement Part3  21 Apr 2022
Appendix 7.3 Travel Plan  21 Apr 2022
Appendix 7.4 DSMP  21 Apr 2022
Appendix 7.5 DfT Traffic Counts  21 Apr 2022
Appendix 7.6 Car Park Management Plan  21 Apr 2022
Appendix 7.7 DSMP  21 Apr 2022
Appendix 7.8 Car & Cycle Management Plan  21 Apr 2022
Appendix 7.9 Servicing & Delivery Plan (School)  21 Apr 2022
Appendix 8.1 Assessment Input Data  21 Apr 2022
Appendix 8.2 Air Quality Neutral Assessment  21 Apr 2022
Appendix 8.3 Figures  21 Apr 2022
Appendix 8.4 Glossary and Abbreviations  21 Apr 2022
Appendix 9.1 Noise Monitoring Locations  21 Apr 2022
Appendix 9.2 - Noise Exposure Contours for Heathrow Airport 2014  21 Apr 2022
Chapter 1 Introduction  21 Apr 2022
ES Chapter 1 Introduction  21 Apr 2022
ES Chapter 10 Population and Human Health  21 Apr 2022
ES Chapter 11 Summary  21 Apr 2022
ES Chapter 2 EIA Methodology  21 Apr 2022
ES Chapter 3 Site and Development  21 Apr 2022
ES Chapter 4 Alternatives  21 Apr 2022
ES Chapter 5 Construction  21 Apr 2022
ES Chapter 6 Townscape and Visual Effects  21 Apr 2022
ES Chapter 7 Transport & Access  21 Apr 2022
ES Chapter 8 Air Quality  21 Apr 2022
ES Chapter 9 Noise  21 Apr 2022
ES Volume 2 Cover and Contents  21 Apr 2022
Figure 1.1 Site Location Plan  21 Apr 2022
Figure 10.1 Study Area  21 Apr 2022
Figure 10.2 Primary Schools  21 Apr 2022
Figure 10.3 Secondary Schools  21 Apr 2022
Figure 10.4 GP Provision  21 Apr 2022
Figure 10.5 Open Space  21 Apr 2022
Figure 2.1 Cumulative Schemes Plan  21 Apr 2022
Figure 3.1 Landscape GA Plan  21 Apr 2022
Figure 9.1 Noise Monitoring Locations  21 Apr 2022
Non-Technical Summary  21 Apr 2022
Volume 1 Cover and Contents  21 Apr 2022
Planning Fire Strategy Report  31 May 2022
Appendix 6.7 Verified View Methodology  07 Jun 2022
Richmond College Amendments  07 Jun 2022
UPDATED DAYLIGHTING AND SUNLIGHTING REPORT  08 Jul 2022