Planning application number: 16/3240/FUL

Radnor Gardens Cross Deep Twickenham (View on map)

Status: refused permission 02/12/2016. Appeal Application Permitted on Appeal on 03/11/2017

Latest: Decision Issued

Level: Committee Decision

Details

Proposal Temporary structures erected in the grounds at Radnor Gardens as part of the winter festivities for visitors, comprising of: 1. Open-air, temporary ice rink covering a surface area of up to 400m2 2. Marquees with white canvas roofs and white/clear glazed sides to accommodate ticketing, viewing and skate hire and covering a surface area of up to 125m2 3. One area for ice rink machinery (chillers, generator, bunded fuel tank and pumps) housed in two acoustic enclosures and screened by an acoustic wall 5. Licensed beverage & food concession located in skate exchange 6. Decorative & safety lighting to illuminate rink, skate exchange and public areas 7. Small PA system to play background music & announcements on rink The facilities will be open to visitors seven days a week (except Christmas Day) and will operate for seven weeks (plus 10 days each for rig/de-rig) between 01 December 2016 and 28 February 2017 between the hours of 10.00am and 8.00pm OR between 01 December 2017 and 28 February 2018 between the hours of 10.00am and 8.00pm.
Type Full Application
Ward SOUTH TWICKENHAM WARD
Applicant Show applicant details
Agent
Officer Ms Wendy Wong Chang

Progress

A decision has been issued by the authority.

A copy of the decision notice will appear in the case file soon, and within a maximum of two weeks.
Application Received 12/08/2016
Validated 06/09/2016
Neighbour notification started 14/11/2016
Neighbour notification ended 05/12/2016
Decision Issued 02/12/2016

Documents and images

DescriptionReferenceDate Published
Access Plan (Detail) TA-00312 Aug 2016
Access Plan (Large) TA-00912 Aug 2016
Distances for acoustic measurements TA-00512 Aug 2016
Flood Statement  12 Aug 2016
Lighting Layout TA-00612 Aug 2016
Location Plan TA-00212 Aug 2016
Site Layout TA-001 B12 Aug 2016
Site Plan TA-00412 Aug 2016
Tree Plan TA-008 B12 Aug 2016
Enclosure Structure 3D Visuals  24 Aug 2016
MARQUEE STRUCTURE 3D VISUALS & PHOTOS  24 Aug 2016
Enclosure Dimensions  31 Aug 2016
Technical Description  31 Aug 2016
Rink Elevation Dimensions  05 Sep 2016
Rink Plan Dimensions  05 Sep 2016