Planning application number: 22/3004/FUL

Site address

Kneller Hall Royal Military School Of Music Kneller Road Twickenham TW2 7DU (View Site Plan)

View

Status:

In Progress

Latest: Assessment stage

Decision due: 20/01/2023

Make a comment Contact us

Details

Proposal

The demolition of existing modern buildings on the site and the conversion of and extensions to Kneller Hall and other ancillary buildings associated with the former royal military music school to a day school (Use Class F1), together with the construction of associated new purpose-built buildings including teaching space, indoor sports facilities, sporting pavilion and forest school building. Alterations to the existing playing fields, to include an all weather pitch with fencing, flood lighting to existing tennis courts, sustainability measures and re-turfing. Provision of a new access from Whitton Dene, and other ancillary works including parking areas, hard and soft landscaping, lighting, access alterations and energy centre. Internal and external alterations to Kneller Hall and the curtilage listed buildings to facilitate the day school use, including demolition and rebuilding of single storey extension to the west wing of Kneller Hall, extension to the Band Practice Hall and re-opening of Whitton Dene site entrance.

Type

Full Application

Ward

WHITTON WARD

Applicant

Show applicant details

Agent

Emma Penson, DWD 6 New Bridge Street London EC4V 6AB

Officer

Emer Costello

Site plan

View Site Plan

Progress

The case officer will be assessing the entire case in detail as well as reviewing comments submitted.

View comments
  • Application Received: 30/09/2022
  • Validated: 21/10/2022
  • Neighbour notification started: 09/11/2022
  • Neighbour notification ended: 09/12/2022

Documents and images

Public comments

DescriptionReferenceDate Published
BLOCK PLAN 001506-ADP-00-00-DR-A-0850-06 Oct 2022
COMMUNITY USE STRATEGY 001506-ADP-00-00-DR-A-1603-06 Oct 2022
EXISTING SITE PLAN 001506-ADP-00-00-DR-A-0900-06 Oct 2022
EXISTING SITE SECTIONS 1 OF 2 001506-ADP-00-XX-DR-A-1300-06 Oct 2022
EXISTING SITE SECTIONS 2 OF 2 001506-ADP-00-XX-DR-A-1301-06 Oct 2022
EXISTING SITE SURVEY PLAN 1 OF 2 001506-ADP-00-00-DR-A-0910-MASTERPLAN -06 Oct 2022
FOREST SCHOOL PROPOSED PLANS ELEVATIONS AND PHOTOS 001506-ADP-08-XX-DR-A-1000 -06 Oct 2022
GIS LANDSCAPE PLAN ADP-001506-00-XX-DR-L-190506 Oct 2022
HARDSCAPE MATERIALS S0P4 ADP-001506-00-XX-DR-L-1904_06 Oct 2022
LANDSCAPE Master Plan ADP-001506-00-XX-DR-L-1900_06 Oct 2022
LEVELS SETTING OUT ADP-001506-00-XX-DR-L-1908_06 Oct 2022
LOCATION PLAN 001506-ADP-00-00-DR-A-0800-06 Oct 2022
MASTERPLAN - EXISTING SITE SURVEY PLAN 2 OF 2 001506-ADP-00-00-DR-A-0911-06 Oct 2022
MASTERPLAN - SITE SURVEY PLAN 1 OF 2 001506-ADP-00-00-DR-A-1010-06 Oct 2022
MASTERPLAN - SITE SURVEY PLAN 2 OF 2 001506-ADP-00-00-DR-A-1011-06 Oct 2022
MELON YARD SOFTSCAPE ADP-001506-00-XX-DR-L-1903_06 Oct 2022
MOVEMENT STRATEGY 001506-ADP-00-00-DR-A-1600-06 Oct 2022
PARKING STRATEGY 001506-ADP-00-00-DR-A-1601-06 Oct 2022
PHASING PLAN 001506-ADP-00-00-DR-A-1050-06 Oct 2022
PROPOSED BANDSTAND ALTERATIONS 001506-ADP-09-00-DR-A-1000 -06 Oct 2022
PROPOSED MASTERPLAN 001506-ADP-00-00-DR-A-1000-06 Oct 2022
PROPOSED SITE SECTIONS 1 OF 2 001506-ADP-00-XX-DR-A-1350-06 Oct 2022
PROPOSED SITE SECTIONS 2 OF 2 001506-ADP-00-XX-DR-A-135106 Oct 2022
SOFTSCAPE LANDSCAPE PLAN ADP-001506-00-XX-DR-L-1902_06 Oct 2022
TREE PLANTING STRATEGY ADP-001506-00-XX-DR-L-1907_06 Oct 2022
URBAN GREENING FACTOR ADP-001506-00-XX-DR-L-1909_06 Oct 2022
WASTE STRATEGY 001506-ADP-00-00-DR-A-1602-06 Oct 2022
BIA Swimming Pool Sections L221004-AKSW-05-B1-DR-S-700107 Oct 2022
BIA Swimming Pool Site Location L221004-AKSW-ZZ-XX-DR-S-0011 - P0107 Oct 2022
Combined Services Site Wide Dist. P2389_00_X_1.07 Oct 2022
Combined Services Sports Centre and Pool Hall Roof Layout P2389_00_LR_50.07 Oct 2022
Combined Services Teaching Block Layout P2389_00_LR_40.07 Oct 2022
Demolition Plan ADP-07-00-DR-A-095007 Oct 2022
Energy Centre Combined Services Layout P2389_00_X_407 Oct 2022
Energy Centre Existing and Proposed Sections ADP-07-XX-DR-A-135007 Oct 2022
Energy Centre Existing Elevation ADP-07-XX-DR-A-120107 Oct 2022
Energy Centre Existing Elevations ADP-07-XX-DR-A-120007 Oct 2022
Energy Centre Existing Plan ADP-07-00-DR-A-090007 Oct 2022
Energy Centre Proposed Elevation ADP-07-XX-DR-A-125007 Oct 2022
Energy Centre Proposed Elevations ADP-07-XX-DR-A-125107 Oct 2022
Energy Centre Proposed Ground Floor ADP-07-00-DR-A-100007 Oct 2022
Energy Centre Roof Plan ADP-07-R1-DR-A-100507 Oct 2022
Foundation strategy L221004-AKS-ZZ-XX-DR-S-00010_P01_07 Oct 2022
Guard House Electircal Containment Layout-First floor P2389_62.5_L1_3007 Oct 2022
Guard House Electircal Containment Layout-Ground floor P2389_62.5_L0_3007 Oct 2022
Guard House Electircal Containment Layout-Ground Floor P2389_62.5_L0_3007 Oct 2022
Guard House Electircal Containment Layout-Ground Floor P2389_62.5_L0_3007 Oct 2022
Guard House Electircal Lighting Layout-First Layout P2389_63_L1_3007 Oct 2022
Guard House Electircal Lighting Layout-Ground Floor P2389_63_L0_3007 Oct 2022
Guard House Floor Finishes First floor LXA-1629-GH-12107 Oct 2022
Guard House Floor Finishes-Ground Floor LXA-1629-GH-12007 Oct 2022
Guards House Elevations Demolition ADP-03-XX-DR-A-122007 Oct 2022
Guards House Existing Elevation ADP-03-XX-DR-A-120007 Oct 2022
Guards House Existing First Floor ADP-03-01-DR-A-090107 Oct 2022
Guards House Existing Ground Floor ADP-03-00-DR-A-090007 Oct 2022
Guards House Existing Roof Plan ADP-03-R1-DR-A-090507 Oct 2022
Guards House Existing Sections ADP-03-XX-DR-A-130007 Oct 2022
Guards House First Floor Alterations ADP-03-01-DR-A-102107 Oct 2022
Guards House First Floor Demolition ADP-03-01-DR-A-095107 Oct 2022
Guards House Ground Floor Alterations ADP-03-00-DR-A-102007 Oct 2022
Guards House Ground Floor Demolition ADP-03-00-DR-A-095007 Oct 2022
Guards House Mechanical Services Distribution-FF P2389_50_L1_3007 Oct 2022
Guards House Mechanical Services Distribution-GF P2389_50_L0_3007 Oct 2022
Guards House Proposed Elevations ADP-03-XX-DR-A-125007 Oct 2022
Guards House Proposed First Floor ADP-03-01-DR-A-100107 Oct 2022
Guards House Proposed Ground Floor ADP-03-00-DR-A-100007 Oct 2022
Guards House Proposed Sections ADP-03-XX-DR-A-135007 Oct 2022
Guards House Propsoed Roof Plan ADP-03-R1-DR-A-100507 Oct 2022
Guards House Sections Demolition ADP-03-XX-DR-A-132007 Oct 2022
Knellar Hall Level M1 Proposed ADP-01-M1-DR-A-100307 Oct 2022
Kneller Hall Entrance ADP-01-XX-DR--A-125607 Oct 2022
Kneller Hall Existing Level 00 ADP-01-00-DR-A-090107 Oct 2022
Kneller Hall Existing Level 02 ADP-01-02-DR-A-090407 Oct 2022
Kneller Hall Existing North and West Elevations ADP-01-XX-DR-A-120107 Oct 2022
Kneller Hall Existing South and East Elevations ADP-01-XX-DR-A-120007 Oct 2022
Kneller Hall Floor Finishes Ground Floor LXA-1629-KH-12007 Oct 2022
Kneller Hall Floor Finishes-First Floor LXA-1629-KH-12107 Oct 2022
Kneller Hall Floor Finishes-Mezzanine LXA-1629-KH-12207 Oct 2022
Kneller Hall Floor Finishes-Second Floor LXA-1629-KH-12307 Oct 2022
Kneller Hall Lecture Theatre Elevations ADP-01-XX-DR-A-200907 Oct 2022
Kneller Hall Lecuture Theartre Elevations ADP-01-XX-DR--A2009.207 Oct 2022
Kneller Hall Level 00 Alterations ADP-01-00-DR-A-102107 Oct 2022
Kneller Hall Level 00 Demolished ADP-01-00-DR-A-095107 Oct 2022
Kneller Hall Level 00 Proposed ADP-01-00-DR-A-100107 Oct 2022
Kneller Hall Level 00 Skirting Plans ADP-01-00-DR-A-140107 Oct 2022
Kneller Hall Level 01 Alterations ADP-01-01-DR-A-102207 Oct 2022
Kneller Hall Level 01 Demolished ADP-01-01-DR-A-095207 Oct 2022
Kneller Hall Level 01 Existing ADP-01-01-DR-A-90207 Oct 2022
Kneller Hall Level 01 Proposed ADP-01-01-DR-A-100207 Oct 2022
Kneller Hall Level 01 Skirting Plans ADP-01-01-DR-A-140207 Oct 2022
Kneller Hall Level 02 Alterations ADP-01-02-DR-A-102407 Oct 2022
Kneller Hall Level 02 Demolished ADP-01-02-DR-A-095407 Oct 2022
Kneller Hall Level 02 Proposed ADP-01-02-DR-A-100407 Oct 2022
Kneller Hall Level 02 Skirting Plans ADP-01-02-DR-A-140407 Oct 2022
Kneller Hall Level B1 Demolished ADP-01-B1-DR-A-095007 Oct 2022
Kneller Hall Level B1 Existing ADP-01-B1-DR-A-090007 Oct 2022
Kneller Hall Level M1 Alterations ADP-01-M1-DR-A-102307 Oct 2022
Kneller Hall Level M1 Demolished ADP-01-M1-DR-A-095307 Oct 2022
Kneller Hall Level M1 Existing ADP-01-M1-DR-A-090307 Oct 2022
Kneller Hall Level M1 Skirting Plans ADP-01-M1-DR-A-140307 Oct 2022
Kneller Hall Level R1 Alterations ADP-01-R1-DR-A-102507 Oct 2022
Kneller Hall Level R1 Demolished ADP-01-R1-DR-A-095507 Oct 2022
Kneller Hall Level R1 Existing ADP-01-R1-DR-A-090507 Oct 2022
Kneller Hall Level R1 Proposed ADP-01-R1-DR-A-100507 Oct 2022
Kneller Hall Long Sections Existing ADP-01-XX-DR-A-132007 Oct 2022
Kneller Hall Long Sections Exsiting ADP-01-XX-DR-A-130007 Oct 2022
Kneller Hall Long Sections Proposed ADP-01-XX-DR-A-135007 Oct 2022
Kneller Hall Main Staircase Demolition Plans ADP-01-XX-DR-A-300207 Oct 2022
Kneller Hall Main Staircase Demolition Sections ADP-01-XX-DR-A-301207 Oct 2022
Kneller Hall Main Staircase Demolition Sections ADP-01-XX-DR-A-301307 Oct 2022
Kneller Hall Main Staircase Existing Sections ADP-01-XX-DR-A-301007 Oct 2022
Kneller Hall Main Staircase Existing Sections ADP-01-XX-DR-A-301107 Oct 2022
Kneller Hall Main Staircase Proposed Plans ADP-01-XX-DR-A-300507 Oct 2022
Kneller Hall Main Staircase Proposed Sections ADP-01-XX-DR--A301607 Oct 2022
Kneller Hall Main Staircase Proposed Sections ADP-01-XX-DR-A-301507 Oct 2022
Kneller Hall Main Staircase-Exisiting Plans ADP-01-XX-DR-A-300007 Oct 2022
Kneller Hall North and East Elevations Extension ADP-01-XX-DR-A-122507 Oct 2022
Kneller Hall North and West Elevations Demolished ADP-01-XX-DR-A-122107 Oct 2022
Kneller Hall Proposed North and West Elevations ADP-01-XX-DR-A-125107 Oct 2022
Kneller Hall Proposed South and East Elevations ADP-01-XX-DR-A-125007 Oct 2022
Kneller Hall Short Sections Demolished ADP-01-XX-DR-A-133207 Oct 2022
Kneller Hall Short Sections Demolished ADP-01-XX-DR-A132107 Oct 2022
Kneller Hall Short Sections Existing ADP-01-XX-DR--A-130207 Oct 2022
Kneller Hall Short Sections Existing ADP-01-XX-DR-A-130107 Oct 2022
Kneller Hall Short Sections Proposed ADP-01-XX-DR--A135107 Oct 2022
Kneller Hall Short Sections Proposed ADP-01-XX-DR-A-135207 Oct 2022
Kneller Hall South and East Elevations Demolished ADP-01-XX-DR-A-122007 Oct 2022
Main Building Electrical Containment Layout-Basement P2389_62.5_L-1_1007 Oct 2022
Main Building Electrical Containment Layout-First Floor and Mezzanine P2389_62.5_L1_1007 Oct 2022
Main Building Electrical Containment Layout-Ground Floor P2389_62.5_L0_1007 Oct 2022
Main Building Electrical Containment Layout-Second Floor P2389_62.5_L2_1007 Oct 2022
Main Building Electrical Lighting Layout-First Floor & Mezzanine P2389_63_L1_1007 Oct 2022
Main Building Electrical Lighting Layout-Ground Floor P2389_63_L0_1007 Oct 2022
Main Building Electrical Lighting Layout-Second Floor P2389_63_L2_1007 Oct 2022
Main Building Electrical Small Power and Data Layout P2389_62_L2_1007 Oct 2022
Main Building Electrical Small Power and Data Layout-Basement P2389_62_L-1_1007 Oct 2022
Main Building Electrical Small Power and Data Layout-First Floor and Mezzanine P2389_62_L1_1007 Oct 2022
Main Building Electrical Small Power and Data Layout-Ground Floor P2389_62_L0_1007 Oct 2022
Main Building Mechanical Services Distribution-Basement L2389_50_L-1_1007 Oct 2022
Main Building Mechanical Services Distribution-FF P2389_50_L1_1007 Oct 2022
Main Building Mechanical Services Distribution-Ground Floor P2389_50_L0_1007 Oct 2022
Main Building Mechanical Services Distribution-Level 2 P2389_50_L2_1007 Oct 2022
Main Building Mechanical Services Distribution-Mezzanine P2389_50_LM_1007 Oct 2022
Mechanical Services Site Wide Dist P2389_00_X_207 Oct 2022
Proposed Skirting Profiles ADP-01-XX-DR-A-450007 Oct 2022
School Hall Demolished Sections ADP-02-XX-DR-A132007 Oct 2022
School Hall Electrical Containment Layout-First Floor P2389_62.5_L1_2007 Oct 2022
School Hall Electrical Containment Layout-Ground Floor P2389_62.5_L0_2007 Oct 2022
School Hall Electrical Lighting Layout-First Floor P2389_63_L1_207 Oct 2022
School Hall Electrical Lighting Layout-Ground floor P2389_63_L0_2007 Oct 2022
School Hall Electrical Small Power and Data Layout-First Floor P2389_62_L1_2007 Oct 2022
School Hall Electrical Small Power and Data Layout-Ground Floor P2389_62_L0_2007 Oct 2022
School Hall Elevations Demolished ADP-02-XX-DR-A-122007 Oct 2022
School Hall Elevations Proposed ADP-02-XX-DR-A-125007 Oct 2022
School Hall Existing Elevations ADP-02-XX-DR-A-120007 Oct 2022
School Hall Existing Roof Plan ADP-02-R1-DR-A-090507 Oct 2022
School Hall Existing Sections ADP-02-XX-DR-A-130007 Oct 2022
School Hall First/Mezzanine Floor Aterations ADP-02-01-DR-A-102107 Oct 2022
School Hall First/Mezzanine Floor Demolished ADP-02-01-DR-A-095107 Oct 2022
School Hall First/Mezzanine Floor Proposed ADP-02-01-DR-A-100107 Oct 2022
School Hall Floor Finishes Ground Floor LXA-1629-SH-12007 Oct 2022
School Hall Floor Finishes Mezzanine LXA-1629-SH-12107 Oct 2022
School Hall Ground Floor Alterations ADP-02-00-DR-A-102007 Oct 2022
School Hall Ground Floor Existing ADP-02-00-DR-A-090007 Oct 2022
School Hall Ground Floor Propoesed ADP-02-00-DR-A-100007 Oct 2022
School Hall Mechanical Distribution-FF P2389_50_L1_2007 Oct 2022
School Hall Mechanical Distribution-GF P2389_50_L0_2007 Oct 2022
School Hall Mechanical Distribution-Section AA P2389_50_SE_2007 Oct 2022
School Hall Mechanical Distribution-Section BB and CC P2389_50_SE_2107 Oct 2022
School Hall Proposed roof Plan ADP-02-R1-DR-A-100507 Oct 2022
School Hall Proposed Sections ADP-02-XX-DR-A1-35007 Oct 2022
Schoold Hall Ground Floor Demolished ADP-02-00-DR-A-095007 Oct 2022
Sports Centre GA 1st Floor ADP-05-00-DR-A-100107 Oct 2022
Sports Centre GA Ground Floor ADP-05-00-DR-A-100007 Oct 2022
Sports Centre GA Roof Plan ADP-05-R1-DR-A-100507 Oct 2022
Sports Centre Proposed East and South Elevation ADP-05-XX-DR-A-125007 Oct 2022
Sports Centre Proposed North and West Elevation ADP-05-XX-DR-A-125107 Oct 2022
Sports Centre Proposed Sections ADP-05-XX-DR-A-135007 Oct 2022
Sports Pavilion Demolition Plan ADP-05-00-DR-A-095007 Oct 2022
Sports Pavilion Existing Elevations ADP-06-XX-DR-A-120007 Oct 2022
Sports Pavilion Existing Plan ADP-06-00-DR-A-090007 Oct 2022
Sports Pavilion Proposed Elevations ADP-06-XX-DR-A-125007 Oct 2022
Sports Pavilion Proposed Ground Floor ADP-06-00-DR-A-100007 Oct 2022
Sports Pavilion Proposed roof ADP-06-R1-DR-A-100507 Oct 2022
Sports Pavilion Proposed Sections ADP-06-XX-DR-A-135007 Oct 2022
Teaching Block 1st Floor ADP-04-01-DR-A-100107 Oct 2022
Teaching Block 2nd Floor ADP-04-02-DR-A-100207 Oct 2022
Teaching Block East and West elevations ADP-04-XX-DR-A-125007 Oct 2022
Teaching Block Ground floor ADP-04-00-DR-A-100007 Oct 2022
Teaching Block Long Sections ADP-04-XX-DR-A-135007 Oct 2022
Teaching Block North and South elevations ADP-04-XX-DR-A-125107 Oct 2022
Teaching Block Roof ADP-04-R1-DR-A-100507 Oct 2022
Teaching Block Short Sections ADP-04-XX-DR-A135107 Oct 2022
Building 10 Elevations 1-4 existing LT/121/0535/P/000507 Nov 2022
Building 12 Elevations 1-4 existing LT/121/0535/P/000607 Nov 2022
Building 13 Elevations 1-4 existing LT/121/0535/P/000707 Nov 2022
Building 13 Elevations 1-4 existing LT/121/0535/P/001107 Nov 2022
Building 14 Elevations 1-4 existing LT/121/0535/P/000807 Nov 2022
Building 15 Elevations 1-4 existing. LT/121/0535/P/000907 Nov 2022
Building 16 Elevations 1-4 existing LT/121/0535/P/001007 Nov 2022
Building 17 Elevations 1-4 existing LT/121/0535/P/001307 Nov 2022
Building 18 Elevations 1-4 existing LT/121/0535/P/001207 Nov 2022
Building 20 Elevations 1-4 existing LT/121/0535/P/001407 Nov 2022
Building 21 Elevations 1-4 existing LT/121/0535/P/001507 Nov 2022
Building 22 elevations 1-4 existing LT/121/0535/P/001607 Nov 2022
Building 23 Elevations 1-4 existing LT/121/0535/P/001707 Nov 2022
Building 24 Elevations 1-4 existing LT/121/0535/P/001807 Nov 2022
Building 25 Elevations 1-4 existing LT/121/0535/P/001907 Nov 2022
Building 26 Elevations 1-4 existing LT/121/0535/P/002007 Nov 2022
Building 3 Elevations 1-4 existing LT/121/0535/P/000107 Nov 2022
building 5 Elevations 1-4 existing LT/121/0535/P/000207 Nov 2022
Building 7 Elevations 1-4 existing LT/121/0535/P/000307 Nov 2022
Building 8 Elevations 1-4 existing LT/121/0535/P/000407 Nov 2022
DEMOLITION SITE PLAN 001506-ADP-00-00-DR-A-095007 Nov 2022
GREEN ROOF DETAIL-S0P1 ADP-001506-00-XX-DR-L-191107 Nov 2022
LEVEL 01 - PROPOSED KH Green Roof 001506-ADP-01-01-DR-A-100207 Nov 2022
MASTERPLAN WITH DEMO 001506-ADP-00-00-DR-A-100507 Nov 2022
Mess Hall GROUND FLOOR - EXISTING ADP-10-00-DR--A-090007 Nov 2022
MOL BUILDINGS 001506-ADP-00-00-DR-A-100607 Nov 2022
Sports Centre Green Roof 001506-ADP-05-R1-DR-A-100507 Nov 2022
Sports Pavilion Green Roof 001506-ADP-06-00-DR-A-101507 Nov 2022
streetscene elevation a LT/121/0535/P/002107 Nov 2022
Teaching Block Green Roof 001506-ADP-04-R1-DR-A-1005-ROOF07 Nov 2022
Temporary accommodation (2) FIRST FLOOR EXISTING ADP-12-01-DR-A-090107 Nov 2022
Temporary accommodation (2) GROUND FLOOR - EXISTING ADP-12-00-DR--A-090007 Nov 2022
Temporary accommodation (2) SOUTH & WEST ELEVATIONS - EXISTING ADP-12-XX-DR-A-120107 Nov 2022
Temporary accommodation (2)-NORTH & EAST ELEVATIONS - EXISTING ADP-12-XX-DR-A-120007 Nov 2022
Temporary accommodation (2)-SECOND FLOOR - EXISTING ADP-12-02-DR-A-090207 Nov 2022
Temporary accommodation SECOND FLOOR - EXISTING ADP-11-02-DR-A-090207 Nov 2022
Temporary Accommodation-FIRST FLOOR - EXISTING ADP-11-01-DR-A-090107 Nov 2022
temporary accommodation-GROUND FLOOR - EXISTING ADP-11-00-DR-A-090007 Nov 2022
Temporary accommodation-NORTH & EAST ELEVATIONS - EXISTING ADP-11-XX-DR-A-120007 Nov 2022
Temporary accommodation-SOUTH & WEST ELEVATIONS - EXISTING ADP-11-XX-DR-A-120107 Nov 2022
Level B1 - Proposed ADP-01-00-DR-A-1000 S2P228 Nov 2022
Light Impact Assessment KNH CDL ZZ XX DR LG 63802 OPTION 203 Sep 2024