Planning application number: 18/2977/FUL

Site address

Marble Hill House Marble Hill Park Richmond Road Twickenham TW1 2NL (View Site Plan)

View

Status:

Granted Permission 25/03/2019

Latest: Decision Issued

Level: Committee Decision

Details

Proposal

1. Marble Hill House: External decoration and repair work (if a window is substantially rotten, partial or full replacement of joinery) and replacement rooflight. 2. Stable Block: External alterations, installation of mechanical plant, timber plant enclosure to the rear and front landscaping (creating an outdoor seating area) to facilitate the refurbishment of the existing café. 3. Service Yard: new pedestrian access and associated refuse storage facilities. 4. Landscaping: new soft and hard landscaping including restoration of gardens, upgrade of sports pitches and facilities, replacement of seating and new play areas. 5. Sports Centre: External ramp for improved access.

Type

Full Application

Ward

TWICKENHAM RIVERSIDE WARD - Historic From 06/05/2022

Applicant

Show applicant details

Agent

Mr Nick Bishop 14 Regents Wharf All Saints Street London N1 9RL

Officer

James Garside (Expired)

Site plan

View Site Plan

Progress

A decision has been issued by the authority.

A copy of the decision notice will appear in the case file soon, and within a maximum of two weeks.
  • Application Received: 07/09/2018
  • Validated: 07/09/2018
  • Neighbour notification started: 10/12/2018
  • Neighbour notification ended: 04/12/2018
  • Decision Issued: 25/03/2019

Documents and images

Public comments

DescriptionReferenceDate Published
Marble Hill House Lift Appraisal Rev C 21/08/18  07 Sep 2018
Demolitions Stable Block West & South Elevations 533-L-105511 Sep 2018
Estate fence & gates 581_PL_L_22 A11 Sep 2018
Existing Sports Provision Arrangement 581_PL_L_24 A11 Sep 2018
Existing Stable Block East & North Elevations 533-L-103011 Sep 2018
Existing Stable Block Section AA & BB 533-L-102011 Sep 2018
Existing Stable Block West & South Elevations 533-L-103111 Sep 2018
Furniture Plan 581_PL_L_04 G11 Sep 2018
Illustrative Landscape Plan 581_PL_L_01 K11 Sep 2018
Interperative Play Element Beehives 581_PL_L_20 A11 Sep 2018
Interperative PLay Element Ninepin Alley 581_PL_L_19 A11 Sep 2018
Landscape Section E-W Pleasure Grounds 581_PL_L_06 B11 Sep 2018
Landscape Section MHH to Stable Cafe 581_PL_L_07 B11 Sep 2018
Landscape Section N-S Pleasure Grounds 581_PL_L_05 B11 Sep 2018
Lift Area: as Existing 300 A11 Sep 2018
Lift Area: as Proposed 301 E11 Sep 2018
Lift Area: Lift Details 302 B11 Sep 2018
MAIN HOUSE - GARRETT FIRE PROOFING 312 B11 Sep 2018
MAIN HOUSE - WINDOW REPAIRS SCHEDULE: INCLUDING DOOR DG15 315 A11 Sep 2018
Main House: Basement Floor Plan; as existing (showing demolition & stripout) 109 C11 Sep 2018
Main House: Basement Floor Plan; Builders Work In Connection With M&E 259 B11 Sep 2018
Main House: Basement Plan; as proposed 209 B11 Sep 2018
Main House: Door Schedule 330 C11 Sep 2018
Main House: East Elevation; as existing 12211 Sep 2018
Main House: East Elevation; repairs 222 B11 Sep 2018
Main House: Elevation of Wing Walls; as Existing 12511 Sep 2018
Main House: Elevation of Wing Walls; repairs 225 C11 Sep 2018
Main House: Fire Resistant Partition to Sensitive Historic Panelled Opening 311 A11 Sep 2018
Main House: First Floor Plan; as existing (showing demolition & stripout) 111 B11 Sep 2018
Main House: First Floor Plan; as Proposed 211 C11 Sep 2018
Main House: First Floor Plan; Builders Work In Connection With M&E 261 B11 Sep 2018
Main House: First Floor Plan; Fire Strategy & Fabric Improvements 241 B11 Sep 2018
Main House: First Floor Plan; repairs to shutters 281 B11 Sep 2018
Main House: Garrett (Third) Floor Plan; as proposed 213 C11 Sep 2018
Main House: Garrett (Third) Floor Plan; Builders Work In Connection With M&E 263 B11 Sep 2018
Main House: Garrett (Third) Floor Plan; Fire Strategy & Fabric Improvements 243 C11 Sep 2018
Main House: Ground Floor Plan; as existing (showing demolition & stripout) 110 C11 Sep 2018
Main House: Ground Floor Plan; as proposed 210 E11 Sep 2018
Main House: Ground Floor Plan; Builders Work In Connection With M&E 260 B11 Sep 2018
Main House: Ground Floor Plan; Fire Strategy & Fabric Improvements 240 D11 Sep 2018
Main House: Ground Floor Plan; repairs to shutters 280 B11 Sep 2018
Main House: Ground Floor Plan; Showing Proposed External Drainage 270 C11 Sep 2018
Main House: North Elevation; as existing 12111 Sep 2018
Main House: North Elevation; repairs 221 B11 Sep 2018
Main House: Proposed Below Ground External Drainage 27111 Sep 2018
Main House: Roof Plan; as existing 11411 Sep 2018
Main House: Roof Plan; Proposed Repairs 214 B11 Sep 2018
Main House: Second Floor Plan; as existing 11211 Sep 2018
Main House: Second Floor Plan; as Proposed 212 B11 Sep 2018
Main House: Second Floor Plan; Builders Work In Connection With M&E 262 B11 Sep 2018
Main House: Second Floor Plan; Fire Strategy & Fabric Improvements 242 B11 Sep 2018
Main House: Second Floor Plan; repairs to shutters 282 B11 Sep 2018
Main House: Shutter Ironmongery Types & Terminology 283 B11 Sep 2018
Main House: South Elevation; as existing 12311 Sep 2018
Main House: South Elevation; repairs 223 B11 Sep 2018
Main House: Third Floor Plan; as existing 113 A11 Sep 2018
Main House: West Elevation; as existing 12411 Sep 2018
Main House: West Elevation; repairs 224 B11 Sep 2018
Play Area Play Equipment 1 581_PL_L_15 A11 Sep 2018
Pleasure Grounds Fence & Gates Plan 581_PL_L_34 A11 Sep 2018
Pleasure Grounds Gravel path section 581_PL_L_33 A11 Sep 2018
Pleasure Grounds Ninepin Alley Section 581_PL_L_32 A11 Sep 2018
Pleasure Grounds Planomertic 581_PL_L_03 E11 Sep 2018
Proposed Landscape Plan NE Woodland Quarter 581_PL_L_27 E11 Sep 2018
Proposed Landscape Plan NW Woodland Quarter 581_PL_L_26 E11 Sep 2018
Proposed Landscape Plan SE Woodland Quarter 581_PL_L_29 E11 Sep 2018
Proposed Landscape Plan SW Woodland Quarter 581_PL_L_28 E11 Sep 2018
Proposed Sports Provision Arrangement 581_PL_L_25 E11 Sep 2018
Proposed Stable Block North & East Elevations 533-L-203011 Sep 2018
Site Plan 00111 Sep 2018
Site Plan (detailed): Main House 00211 Sep 2018
Site Plan: 00611 Sep 2018
Sitewide Demolition Plan 581_PL_L_11 C11 Sep 2018
Sitewide Tree Removal Plan 581_PL_L_10 E11 Sep 2018
SPORTS BLOCK - GROUND FLOOR PLAN EXISTING 11011 Sep 2018
SPORTS BLOCK - NW AND NE ELEVATIONS PROPOSED 12111 Sep 2018
SPORTS BLOCK - ROOF PLAN EXISTING 11111 Sep 2018
SPORTS BLOCK - SE & SW ELEVATIONS EXISTING 12211 Sep 2018
STABLE BLOCK - DEMOLITIONS GROUND FLOOR PLAN 533-L-105011 Sep 2018
STABLE BLOCK - DEMOLITIONS ROOF PLAN 533-L-105111 Sep 2018
STABLE BLOCK - DEMOLITIONS SECTIONS AA 533-L-105211 Sep 2018
STABLE BLOCK - DEMOLITIONS SECTIONS CC, DD 533-L-105311 Sep 2018
STABLE BLOCK - DEMOLITIONS STABLE BLOCK EAST 533-L-105411 Sep 2018
STABLE BLOCK - DETAILS EXISTING HATCH TO SOUTH ELEVATION 533-D-202411 Sep 2018
STABLE BLOCK - DETAILS HATCH TO SOUTH ELEVATION 533-D-202111 Sep 2018
STABLE BLOCK - DETAILS KITCHEN DUCT EXTRACT VENT TO ROOF 533-D-202811 Sep 2018
STABLE BLOCK - DETAILS NEW DOOR ON EXISTING OPENING TO WC 533-D-202511 Sep 2018
STABLE BLOCK - DETAILS NEW KITCHEN DOOR TO WEST ELEVATION 533-D-202011 Sep 2018
STABLE BLOCK - DETAILS NEW LOUVRE FOR PLANT ROOM 533-D-202711 Sep 2018
STABLE BLOCK - DETAILS NEW OPENING TO STAFF WC 533-D-202611 Sep 2018
STABLE BLOCK - EXISTING GROUND FLOOR PLAN 533-L-101011 Sep 2018
STABLE BLOCK - EXISTING ROOF PLAN 533-L-101111 Sep 2018
STABLE BLOCK - EXISTING SITE PLAN 1,1250 533-L-100111 Sep 2018
STABLE BLOCK - PROPOSED ELEVATION 01 533-L-203111 Sep 2018
STABLE BLOCK - PROPOSED GROUND FLOOR PLAN 533-L-2010 B11 Sep 2018
STABLE BLOCK - PROPOSED ROOF PLAN 533-L-2011 A11 Sep 2018
STABLE BLOCK - PROPOSED SECTION AA 533-L-202011 Sep 2018
STABLE BLOCK - PROPOSED SECTION BB 533-L-202111 Sep 2018
STABLE BLOCK - PROPOSED SITE PLAN 1,1250 533-L-2001 B11 Sep 2018
STABLE BLOCK - SITE PLAN - EXISTING 533-L-100811 Sep 2018
SPORTS BLOCK - NE AND NW ELEVATIONS PROPOSED 221 A14 Sep 2018
STABLE BLOCK - PROPOSED HIGH LEVEL GROUND FLOOR PLAN B.W.I.C. 99480/8-SK-BW-152 A14 Sep 2018
STABLE BLOCK - PROPOSED LOW LEVEL GROUND FLOOR PLAN B.W.I.C. 99480/8-SK-BW 151 A14 Sep 2018
STABLE BLOCK - PROPOSED PLANT ROOM HIGH LEVEL B.W.I.C. 99480/8/-SK-BW-154 A14 Sep 2018
STABLE BLOCK- PROPOSED PLANT ROOM LOW LEVEL B.W.I.C. 99480/8-SK-BW-153 A14 Sep 2018