Planning application number: 22/0900/OUT

Site address

The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET (View Site Plan)

View

Status:

In Progress. Appeal Lodged on 28/02/2024

Latest: Assessment stage

Decision due: 30/04/2023

Level: Committee Decision

Make a comment Contact us

Details

Proposal

Hybrid application to include: 1. Demolition of existing buildings (except the Maltings and the façade of the Bottling Plant and former Hotel), walls, associated structures, site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site: 2. Detailed application for the works to the east side of Ship Lane which comprise: a. Alterations and extensions to existing buildings and erection of buildings varying in height from 3 to 9 storeys plus a basement of one to two storeys below ground to allow for residential apartments; flexible use floorspace for retail, financial and professional services, café/restaurant and drinking establishment uses, offices, non-residential institutions and community use and boathouse; Hotel / public house with accommodation; Cinema and Offices. b. New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works c. Provision of on-site cycle, vehicle and servicing parking at surface and basement level d. Provision of public open space, amenity and play space and landscaping e. Flood defence and towpath works f. Installation of plant and energy equipment 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise: a. The erection of a single storey basement and buildings varying in height from 3 to 8 storeys b. Residential development c. Provision of on-site cycle, vehicle and servicing parking d. Provision of public open space, amenity and play space and landscaping e. New pedestrian, vehicle and cycle accesses and internal routes, and associated highways works.

Type

Outline Application

Ward

MORTLAKE AND BARNES COMMON WARD

Applicant

Show applicant details

Agent

Anna Gargan 72 Welbeck Street London W1G 0AY

Officer

Lucy Thatcher

Site plan

View Site Plan

Progress

The case officer will be assessing the entire case in detail as well as reviewing comments submitted.

View comments
  • Application Received: 17/03/2022
  • Validated: 11/04/2022
  • Neighbour notification started: 22/01/2024
  • Neighbour notification ended: 14/01/2023

Documents and images

Public comments

DescriptionReferenceDate Published
ARBORICULTURAL IMPACT ASSESSMENT -PART-2 SUPERSEDED18 Mar 2022
ARBORICULTURAL IMPACT ASSESSMENT-PART-1 SUPERSEDED18 Mar 2022
B1-CINEMA-GREEN_BRUKL SUPERSEDED18 Mar 2022
B1-CINEMA-LEAN_BRUKL SUPERSEDED18 Mar 2022
B1-OFFICE-GREEN_BRUKL SUPERSEDED18 Mar 2022
B1-OFFICE-LEAN_BRUKL SUPERSEDED18 Mar 2022
B5-HOTEL-GREEN_BRUKL SUPERSEDED18 Mar 2022
C1 HOTEL_BRUKL SUPERSEDED18 Mar 2022
CIL ADDITIONAL INFORMATION FORM_APPENDIX 2 SUPERSEDED18 Mar 2022
CIRCULAR ECONOMY STATEMENT SUPERSEDED18 Mar 2022
Community and Cultural Assessment  18 Mar 2022
DESIGN CODE (PART 1) SUPERSEDED18 Mar 2022
DESIGN CODE (PART 2) SUPERSEDED18 Mar 2022
DESIGN CODE (PART 3) SUPERSEDED18 Mar 2022
DESIGN CODE (PART 4) SUPERSEDED18 Mar 2022
DESIGN CODE (PART 5) SUPERSEDED18 Mar 2022
DESIGN CODE (PART 6) SUPERSEDED18 Mar 2022
Employment Assessment  18 Mar 2022
Energy Strategy  18 Mar 2022
Environmental Statement Volume 2 Figures Part-5  18 Mar 2022
Environmental Statement Appendix 11.2 -Part-1  18 Mar 2022
Environmental Statement Appendix 11.2 -Part-2  18 Mar 2022
ENVIRONMENTAL STATEMENT APPENDIX 12.2 -PART-2 SUPERSEDED18 Mar 2022
ENVIRONMENTAL STATEMENT APPENDIX 12.2 -PART-3 SUPERSEDED18 Mar 2022
ENVIRONMENTAL STATEMENT APPENDIX 12.2 PART-1 SUPERSEDED18 Mar 2022
Environmental Statement Appendix 12.5-Part-1  18 Mar 2022
Environmental Statement Appendix 12.5-Part-2  18 Mar 2022
Environmental Statement Appendix 13.4 BNG  18 Mar 2022
Environmental Statement Chapter 1  18 Mar 2022
Environmental Statement Chapter 10  18 Mar 2022
Environmental Statement Chapter 11  18 Mar 2022
Environmental Statement Chapter 12  18 Mar 2022
Environmental Statement Chapter 14  18 Mar 2022
Environmental Statement Chapter 16  18 Mar 2022
Environmental Statement Chapter 17  18 Mar 2022
Environmental Statement Chapter 18  18 Mar 2022
Environmental Statement Chapter 19  18 Mar 2022
Environmental Statement Chapter 2  18 Mar 2022
Environmental Statement Chapter 21  18 Mar 2022
Environmental Statement Chapter 3  18 Mar 2022
Environmental Statement Chapter 4  18 Mar 2022
Environmental Statement Chapter 5  18 Mar 2022
Environmental Statement Chapter 6  18 Mar 2022
Environmental Statement Chapter 7  18 Mar 2022
Environmental Statement Chapter 8  18 Mar 2022
Environmental Statement Chapter 9  18 Mar 2022
Environmental Statement Chapter Chapter 15  18 Mar 2022
ENVIRONMENTAL STATEMENT CHAPTER13 SUPERSEDED18 Mar 2022
Environmental Statement Chapter20  18 Mar 2022
Environmental Statement Non technical Summary  18 Mar 2022
Environmental Statement Vol 3: Appenix 1.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 10.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 10.2  18 Mar 2022
Environmental Statement Vol 3: Appenix 10.3  18 Mar 2022
Environmental Statement Vol 3: Appenix 10.4  18 Mar 2022
Environmental Statement Vol 3: Appenix 12.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 12.3  18 Mar 2022
Environmental Statement Vol 3: Appenix 12.4  18 Mar 2022
ENVIRONMENTAL STATEMENT VOL 3: APPENIX 13.1 SUPERSEDED18 Mar 2022
ENVIRONMENTAL STATEMENT VOL 3: APPENIX 13.2 SUPERSEDED18 Mar 2022
ENVIRONMENTAL STATEMENT VOL 3: APPENIX 13.3 SUPERSEDED18 Mar 2022
Environmental Statement Vol 3: Appenix 14.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 14.2  18 Mar 2022
Environmental Statement Vol 3: Appenix 15.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 16.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 16.2  18 Mar 2022
Environmental Statement Vol 3: Appenix 17.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 18.1 end to 18.4  18 Mar 2022
Environmental Statement Vol 3: Appenix 18.1 Part 1  18 Mar 2022
Environmental Statement Vol 3: Appenix 18.1 Part 2  18 Mar 2022
Environmental Statement Vol 3: Appenix 18.1 Part 3  18 Mar 2022
Environmental Statement Vol 3: Appenix 18.1 Part 5  18 Mar 2022
Environmental Statement Vol 3: Appenix 18.1 Part 6  18 Mar 2022
Environmental Statement Vol 3: Appenix 18.4-18.5  18 Mar 2022
Environmental Statement Vol 3: Appenix 19.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 2.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 2.2  18 Mar 2022
Environmental Statement Vol 3: Appenix 2.3  18 Mar 2022
Environmental Statement Vol 3: Appenix 2.4  18 Mar 2022
Environmental Statement Vol 3: Appenix 2.5  18 Mar 2022
Environmental Statement Vol 3: Appenix 2.6  18 Mar 2022
Environmental Statement Vol 3: Appenix 2.7  18 Mar 2022
Environmental Statement Vol 3: Appenix 7.1-7.3  18 Mar 2022
Environmental Statement Vol 3: Appenix 8.1 Part 1  18 Mar 2022
Environmental Statement Vol 3: Appenix 8.1 Part 2  18 Mar 2022
Environmental Statement Vol 3: Appenix 8.1 Part 3  18 Mar 2022
Environmental Statement Vol 3: Appenix 8.1 Part 4  18 Mar 2022
Environmental Statement Vol 3: Appenix 8.1 Part 5  18 Mar 2022
Environmental Statement Vol 3: Appenix 8.1 Part 6  18 Mar 2022
Environmental Statement Vol 3: Appenix 8.1 Part 7  18 Mar 2022
Environmental Statement Vol 3: Appenix 9.1  18 Mar 2022
Environmental Statement Vol 3: Appenix 9.2  18 Mar 2022
Environmental Statement Vol 3: Appenix 9.3  18 Mar 2022
Environmental Statement Vol 3: Appenix 9.4  18 Mar 2022
Environmental Statement Volume 1 Contents  18 Mar 2022
Environmental Statement Volume 2 Figures Part-1  18 Mar 2022
Environmental Statement Volume 2 Figures Part-2  18 Mar 2022
Environmental Statement Volume 2 Figures Part-3  18 Mar 2022
Environmental Statement Volume 2 Figures Part-4  18 Mar 2022
Environmental Statement Volume 2 Figures Part-6  18 Mar 2022
Environmental Statement Volume 2 Figures Part-7  18 Mar 2022
Environmental Statement Volume 2 Figures Part-8  18 Mar 2022
ES CHAPTER 11 APPENDIX 11.1 PART 2  18 Mar 2022
ES CHAPTER 11 APPENDIX 11.1 PART 3  18 Mar 2022
ES CHAPTER 11 APPENDIX 11.1 PART 4  18 Mar 2022
ES CHAPTER 11 APPENDIX 11.1 PART 6  18 Mar 2022
ES CHAPTER 11 APPENDIX 11.1PART 5  18 Mar 2022
Estate Management Strategy  18 Mar 2022
Existing Areas  18 Mar 2022
FINANCIAL VIABILITY ASSESSMENT  18 Mar 2022
Foul Sewage and Utilities  18 Mar 2022
Framwork Construction Management Statement  18 Mar 2022
GREEN CALCULATIONS PART 1 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 10 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 11 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 12 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 13 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 14 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 15 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 16 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 2 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 3 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 4 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 5 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 6 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 7 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 8 SUPERSEDED18 Mar 2022
GREEN CALCULATIONS PART 9 SUPERSEDED18 Mar 2022
Health Impact Assessment  18 Mar 2022
Internal Daylight & Sunlight Report- Part 1  18 Mar 2022
Internal Daylight & Sunlight Report- Part 2  18 Mar 2022
Internal Daylight & Sunlight Report- Part 3  18 Mar 2022
LEAN CALCULATIONS PART 1 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 10 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 11 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 12 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 13 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 14 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 15 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 16 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 2 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 3 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 4 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 5 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 6 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 7 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 8 SUPERSEDED18 Mar 2022
LEAN CALCULATIONS PART 9 SUPERSEDED18 Mar 2022
Lighting Masterplan  18 Mar 2022
Noise impact assessment  18 Mar 2022
Odour Assessment Report  18 Mar 2022
Open Space and Playing Pitches Assessment Part 1  18 Mar 2022
Open Space and Playing Pitches Assessment Part 2  18 Mar 2022
Open Space and Playing Pitches Assessment Part 3  18 Mar 2022
Open Space and Playing Pitches Assessment Part 4  18 Mar 2022
OPERATIONAL WASTE MANAGEMENT PLAN SUPERSEDED18 Mar 2022
OUTLINE CAR PARK MANAGEMENT PLAN SUPERSEDED18 Mar 2022
PROPOSED ACCOMODATION SCHEDULE SUPERSEDED18 Mar 2022
PROPOSED GEA SUPERSEDED18 Mar 2022
PROPOSED GIA SUPERSEDED18 Mar 2022
PROPOSED UNIT MIX SUPERSEDED18 Mar 2022
Residential Travel Plan  18 Mar 2022
Retail and Leisure Statement  18 Mar 2022
School BRUKL  18 Mar 2022
School_brukl  18 Mar 2022
Site location plan  18 Mar 2022
SITE WASTE MANAGEMENT PLAN SUPERSEDED18 Mar 2022
Sports Pitch Lighting Assessment  18 Mar 2022
Stag Brewery - Validation Checklist  18 Mar 2022
Statement of Community Involvement Part 1  18 Mar 2022
Statement of Community Involvement Part 2  18 Mar 2022
Sustainability Statement.  18 Mar 2022
Town Planning Statement_Part 1  18 Mar 2022
Town Planning Statement_Part 2  18 Mar 2022
Transport Assessment Part 1  18 Mar 2022
Transport Assessment Part 2  18 Mar 2022
Transport Assessment Part 3  18 Mar 2022
Transport Assessment Part 4  18 Mar 2022
Transport Assessment Part 5  18 Mar 2022
Transport Assessment Part 6  18 Mar 2022
Transport Assessment Part 7  18 Mar 2022
tructural Impact Assessment  18 Mar 2022
CARBON PROFESSION STATEMENT SUPERSEDED21 Mar 2022
GLA CARBON EMISSION REPORT SUPERSEDED21 Mar 2022
WHOLE LIFE CARBON REPORT SUPERSEDED21 Mar 2022
Affordable Housing Statement  08 Apr 2022
CAR PARK MANAGEMENT PLAN SUPERSEDED08 Apr 2022
Delivery and service plan - part 1  08 Apr 2022
Delivery and service plan - part 2  08 Apr 2022
Delivery and service plan - part 3  08 Apr 2022
Drawing issue sheet  08 Apr 2022
DRAWING LIST SUPERSEDED08 Apr 2022
FIRE STATEMENT SUPERSEDED08 Apr 2022
FIRE STRATEGY STATEMENT SUPERSEDED08 Apr 2022
Landscape Design & Access Statement - part 1  08 Apr 2022
Landscape Design & Access Statement - part 2  08 Apr 2022
Landscape Design & Access Statement - part 3  08 Apr 2022
Landscape Design & Access Statement - part 4  08 Apr 2022
Landscape Design & Access Statement - part 5  08 Apr 2022
Landscape Design & Access Statement - part 6  08 Apr 2022
Landscape Design & Access Statement - part 7  08 Apr 2022
Landscape Design & Access Statement - part 8  08 Apr 2022
Landscape Design & Access Statement - part 9  08 Apr 2022
LIGHTING REPORT - PART 1 SUPERSEDED08 Apr 2022
LIGHTING REPORT - PART 2 SUPERSEDED08 Apr 2022
LIGHTING REPORT - PART 3 SUPERSEDED08 Apr 2022
LIGHTING REPORT - PART 4 SUPERSEDED08 Apr 2022
LIGHTING REPORT - PART 5 SUPERSEDED08 Apr 2022
LIGHTING REPORT - PART 6 SUPERSEDED08 Apr 2022
LIGHTING REPORT - PART 7 SUPERSEDED08 Apr 2022
Masterplan Design & Access Statement - part 1  08 Apr 2022
Masterplan Design & Access Statement - part 2  08 Apr 2022
Masterplan Design & Access Statement - part 3  08 Apr 2022
Masterplan Design & Access Statement - part 4  08 Apr 2022
Masterplan Design & Access Statement - part 5  08 Apr 2022
Masterplan Design & Access Statement - part 6  08 Apr 2022
PLANNING AREAS - COMPLIANCE SUPERSEDED08 Apr 2022
WASTE MANAGEMENT PLAN - REV D SUPERSEDED08 Apr 2022
ES Volume 2 Figures Part-3  22 Apr 2022
Town Planning Statement_Part1  22 Apr 2022
Town Planning Statement_Part2  22 Apr 2022
ES Volume 3 Appendices Contents  29 Apr 2022
site wide travel plan  29 Apr 2022
ES Appendix 11.1 Preliminary Risk Assessment-Part-1  06 May 2022
correspondence  11 May 2022
correspondence  11 May 2022
SUBMISSION TO THE LONDON BOROUGH OF RICHMOND UPON THAMES  27 May 2022
220727-HSE Responses-Rev03  05 Dec 2022
220729 LBRuT Design Code Comments - S&P Response  05 Dec 2022
220809 Townscape Briefing Note  05 Dec 2022
220818 Applicant Responses Tracker_Final  05 Dec 2022
220818 GLA Stage 1 Responses_Final  05 Dec 2022
220914 Cover Letter_Updated  05 Dec 2022
220916 Responses to Consultee Comments - Merged  05 Dec 2022
221017-SQP-Building 18 Layout Note  05 Dec 2022
221018 - School Land - Briefing Note  05 Dec 2022
Accelar comments-20220809 Response  05 Dec 2022
Accelar comments-20220818 Response  05 Dec 2022
Addendum FVA Report  05 Dec 2022
AIA - part 1  05 Dec 2022
AIA - part 2  05 Dec 2022
Appendix 12.5 WIE18671-104-BN-3-1-3-RiverWall team re-issue-Part-1  05 Dec 2022
Appendix 12.5 WIE18671-104-BN-3-1-3-RiverWall team re-issue-Part-2  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010576_B06-TY-03_3_2022-02-10_12-15-48  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010577_B09-TY-01_3_2022-02-10_12-15-50  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010578_B09-TY-02_2_2022-02-10_12-15-53  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010579_B09-TY-03_3_2022-02-10_12-15-55  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010580_B09-TY-04_2_2022-02-10_12-15-57  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010581_B10-TY-03_3_2022-02-10_12-16-00  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010582_B08-TR-02_2022-02-10_12-16-03  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010583_B08-TY-04_2022-02-10_12-16-05  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010584_B08-TY-03_2022-02-10_12-16-08  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010585_B08-TY-05_2022-02-10_12-16-11  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010586_B08-TY-06_2022-02-10_12-16-14  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010587_B08-TY-07_2022-02-10_12-16-16  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010588_B08-TY-10_2022-02-10_12-16-19  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010589_B08-TY-11_2022-02-10_12-16-22  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010590_B08-TY-12_2022-02-10_12-16-25  05 Dec 2022
appendix F - SAP Be Green -DER_TER_Calculations_010591_B08-TY-13_2022-02-10_12-16-27  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010560_B06-TY-03_3_2022-02-10_12-13-55  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010561_B09-TY-01_3_2022-02-10_12-13-57  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010562_B09-TY-02_2_2022-02-10_12-13-59  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010563_B09-TY-03_3_2022-02-10_12-14-01  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010564_B09-TY-04_2_2022-02-10_12-14-04  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010565_B10-TY-03_3_2022-02-10_12-14-06  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010566_B08-TR-02_2022-02-10_12-14-09  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010567_B08-TY-04_2022-02-10_12-14-12  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010568_B08-TY-03_2022-02-10_12-14-14  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010569_B08-TY-05_2022-02-10_12-14-17  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010570_B08-TY-06_2022-02-10_12-14-20  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010571_B08-TY-07_2022-02-10_12-14-22  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010572_B08-TY-10_2022-02-10_12-14-25  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010573_B08-TY-11_2022-02-10_12-14-28  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010574_B08-TY-12_2022-02-10_12-14-30  05 Dec 2022
appendix F - SAP Be Lean -DER_TER_Calculations_010575_B08-TY-13_2022-02-10_12-14-33  05 Dec 2022
Assessment of Bus Stops  05 Dec 2022
Basement note  05 Dec 2022
Basement Screening Assessment - part 1  05 Dec 2022
Basement Screening Assessment - part 2  05 Dec 2022
Basement Screening Assessment - part 3  05 Dec 2022
Basement Screening Assessment - part 4  05 Dec 2022
Basement Screening Assessment - part 5  05 Dec 2022
BRUKL - Be Green - Cinema  05 Dec 2022
BRUKL - Be Green - Hotel  05 Dec 2022
BRUKL - Be Green - Office  05 Dec 2022
BRUKL - Be Lean - Cinema  05 Dec 2022
BRUKL - Be Lean - Hotel  05 Dec 2022
BRUKL - Be Lean - Office  05 Dec 2022
CAVAT Value note  05 Dec 2022
Circular Economy Statement  05 Dec 2022
Community and Cultural Facilities Assessment Addendum  05 Dec 2022
DAS Addendum_Part 1  05 Dec 2022
DAS Addendum_Part 2  05 Dec 2022
DAS Addendum_Part 3  05 Dec 2022
DAS Addendum_Part 4  05 Dec 2022
DAS Addendum_Part 5  05 Dec 2022
Drainage Strategy_Appendix A  05 Dec 2022
Drainage Strategy_Appendix B  05 Dec 2022
Drainage Strategy_Appendix C  05 Dec 2022
Drainage Strategy_Appendix D  05 Dec 2022
Drainage Strategy_Appendix E  05 Dec 2022
Drainage Strategy_Appendix F  05 Dec 2022
Drainage Strategy_Appendix G  05 Dec 2022
Drainage Strategy_Appendix H  05 Dec 2022
Drainage Strategy_Appendix I  05 Dec 2022
Drainage Strategy_Appendix J  05 Dec 2022
Drainage Strategy_Appendix K  05 Dec 2022
Drainage Strategy_Part 1  05 Dec 2022
Drainage Strategy_Part 21  05 Dec 2022
Drainage Strategy_Part 31  05 Dec 2022
Employment Assessment Addendum  05 Dec 2022
ES Appendix 13.1 Preliminary Ecological Appraisal.  05 Dec 2022
ES Appendix 13.2 Protected Species Report  05 Dec 2022
ES Appendix 13.3 Supplementary Protected Species Report-Part-1  05 Dec 2022
ES Appendix 13.3 Supplementary Protected Species Report-Part-2  05 Dec 2022
ES Appendix 13.4 WFD Screening  05 Dec 2022
ES Appendix 13.5 BNG  05 Dec 2022
FACTS AND FIGURES SUPERSEDED05 Dec 2022
FIRE STATEMENT FORM SUPERSEDED05 Dec 2022
FIRE STRATEGY STATEMENT SUPERSEDED05 Dec 2022
GEA AREA SCHEDULE SUPERSEDED05 Dec 2022
GIA AREA SCHEDULE SUPERSEDED05 Dec 2022
GLA WLC assessment template_May 2020 v.1.2_0  05 Dec 2022
GLA_CARBON_EMISSION_REPORTING_SPREADSHEET SUPERSEDED05 Dec 2022
HIA Statement of Conformity  05 Dec 2022
Landscape design - planning addendum  05 Dec 2022
MEM-2310513-5A-GJ-20181108-Responses to GLA-RevC  05 Dec 2022
NOTE-1920618-5A-ES-20220817-Stag Brewery Prelim QDR-Rev01  05 Dec 2022
NSA SCHEDULE SUPERSEDED05 Dec 2022
PLANNING AREAS-COMPLIANCE SUPERSEDED05 Dec 2022
PTAL Technical Note - Rev A  05 Dec 2022
Rail Impact Assessment  05 Dec 2022
Replacement ES Figures 13.1-13.10-Part-1  05 Dec 2022
Replacement ES Figures 13.1-13.10-Part-2  05 Dec 2022
Retail and Leisure Statement Addendum  05 Dec 2022
REVISED DESIGN CODE_PART 1 SUPERSEDED05 Dec 2022
REVISED DESIGN CODE_PART 2 SUPERSEDED05 Dec 2022
REVISED DESIGN CODE_PART 3 SUPERSEDED05 Dec 2022
REVISED DESIGN CODE_PART 4 SUPERSEDED05 Dec 2022
REVISED DESIGN CODE_PART 5 SUPERSEDED05 Dec 2022
RHP letter (1) (Appendix C)  05 Dec 2022
Stag - impact of basement reduction final 2 290722  05 Dec 2022
Stag - response to LBR Housing Team comments final 280722 (Appendix D)  05 Dec 2022
Stag Brewery - First Homes impact 300522  05 Dec 2022
Supplementary Daylight and Sunlight Report  05 Dec 2022
SUSTAINABLE_CONSTRUCTION_CHECKLIST_2020 SUPERSEDED05 Dec 2022
TN048 - Traffic Data Comparison_Rev A  05 Dec 2022
TN049 - Transport Assessment Addendum  05 Dec 2022
UNIT MIX SCHEDULE SUPERSEDED05 Dec 2022
WASTE MANAGEMENT PLAN_REV E. SUPERSEDED05 Dec 2022
WATERFRONT LIGHTING ASSESSMENT_PART1. SUPERSEDED05 Dec 2022
WATERFRONT LIGHTING ASSESSMENT_PART2. SUPERSEDED05 Dec 2022
WIE18671-100_Chapter 13_Ecology-3.2.1-Update  05 Dec 2022
WIE18671-114-BN-1.2.5-AQ Response  05 Dec 2022
WIE18671-114-BN-1.3.4-FR&D Response-final  05 Dec 2022
WIE18671-114-BN-2.1.2-Noise Conditions  05 Dec 2022
WIE18671-114-BN-3.4.1-Arboriculture Response  05 Dec 2022
WIE18671-114-R.220804.ES SoC-final  05 Dec 2022
WIE18671-114-R.220916.ES SoC  05 Dec 2022
HSE response  13 Dec 2022
GLA Stage 1 letter  05 Jun 2023
GLA Stage 1 report  05 Jun 2023
 05 Jul 2023
Addendum Play Calculation  05 Jul 2023
AFFORDABLE HOUSING OFFER SUPERSEDED05 Jul 2023
Air Quality Positive Statement  05 Jul 2023
Applicant Consultation Response Tracker  05 Jul 2023
arboricultural impact assessment  05 Jul 2023
Basement Impact Assessment - Part 1  05 Jul 2023
Basement Impact Assessment - Part 2  05 Jul 2023
Basement Impact Assessment - Part 3  05 Jul 2023
Basement Impact Assessment - Part 4  05 Jul 2023
Basement Impact Assessment - Part 5  05 Jul 2023
Basement Impact Assessment - Part 6  05 Jul 2023
Basement Impact Assessment - Part 7  05 Jul 2023
Basement Impact Assessment - Part 8  05 Jul 2023
Basement Impact Assessment - Part 9  05 Jul 2023
Be Seen section-Rev 01  05 Jul 2023
BIA clarification  05 Jul 2023
biodiversity net gain design stage assessment  05 Jul 2023
Chiswick Bridge View Comparison  05 Jul 2023
Circular Economy Statement -Rev 07  05 Jul 2023
Daylight Sunlight Letter  05 Jul 2023
Daylight Sunlight Overshadowing  05 Jul 2023
DESIGN CODE 1  05 Jul 2023
DESIGN CODE 2  05 Jul 2023
DESIGN CODE 3  05 Jul 2023
DESIGN CODE 4  05 Jul 2023
DESIGN CODE 5  05 Jul 2023
DESIGN CODE 6  05 Jul 2023
Design Code Aspect File Note  05 Jul 2023
Drainage Strategy Part-1  05 Jul 2023
Drainage Strategy Part-2  05 Jul 2023
Drainage Strategy Part-3  05 Jul 2023
Drainage Strategy Part-4  05 Jul 2023
energy Strategy addendum 02  05 Jul 2023
FINANCIAL VIABILITY APPRAISAL ADDENDUM OUTCOMES  05 Jul 2023
FRA_Addendum  05 Jul 2023
gla_circular_economy_statements_template  05 Jul 2023
HYBRID SCHEME_80-20 SPLIT_GEA SUPERSEDED05 Jul 2023
HYBRID SCHEME_80-20 SPLIT_GIA SUPERSEDED05 Jul 2023
HYBRID SCHEME_80-20 SPLIT_NSA SUPERSEDED05 Jul 2023
HYBRID SCHEME_80-20 SPLIT_UNIT MIX SUPERSEDED05 Jul 2023
HYBRID SCHEME_80-20 SPLIT_WAU SUPERSEDED05 Jul 2023
Letter to the PLA  05 Jul 2023
Light Pollution  05 Jul 2023
NOTE ON FINAL AH OFFER VIABILITY  05 Jul 2023
Parking Survey Data Review  05 Jul 2023
play area noise assessment  05 Jul 2023
RHP Letter  05 Jul 2023
Separate response document to LBRUT - FRA Addendum  05 Jul 2023
sheen lane level crossing assessment  05 Jul 2023
stag brewery bus stop review (rev_C)  05 Jul 2023
Stag_Brewery_FRA_Addendum  05 Jul 2023
Stantec TfL Response (3 Feb 2022)  05 Jul 2023
Statement of conformity  05 Jul 2023
Statement of conformity Note_Light Pollution  05 Jul 2023
TA Addendum - 80-20 Split Proposal v1.4  05 Jul 2023
thames Water Clean Water Capacity Report  05 Jul 2023
WASTE MANAGEMENT PLAN_REV H SUPERSEDED05 Jul 2023
Whole Life Cycle Assessment 25_march_2022  05 Jul 2023
Appendix 1 - Latest s106 Contributions  11 Jul 2023
S106 contributions and CIL  11 Jul 2023
WATERFRONT LIGHTING ASSESSMENT SUPERSEDED11 Jul 2023
ADDENDUM TO FINAL DRAWING AND DOCUMENT LIST  18 Jul 2023
FINAL DRAWING AND DOCUMENT LIST SUPERSEDED18 Jul 2023
Financial Viability Assessment  19 Jul 2023
ADDENDUM FVA REPORT SUP15 Nov 2023
Affordable Housing 80/20 split - masterplan)  15 Nov 2023
Affordable Housing Offer Note (Nov 2023)  15 Nov 2023
ARBORICULTURAL IMPACT ASSESSMENT LOC  15 Nov 2023
Area Schedule_Fire Led Design Amendments_GEA  15 Nov 2023
Area Schedule_Fire Led Design Amendments_GIA  15 Nov 2023
Area Schedule_Fire Led Design Amendments_NSA  15 Nov 2023
Area Schedule_Fire Led Design Amendments_TOTALS  15 Nov 2023
Area Schedule_Fire Led Design Amendments_Wheelchair Units  15 Nov 2023
BASEMENT IMPACT ASSESSMENT LOC  15 Nov 2023
BASEMENT NOTE LETTER  15 Nov 2023
BIODIVERSITY NET GAIN LOC  15 Nov 2023
Car Park Management Plan - Rev D  15 Nov 2023
CAVAT NOTE LOC  15 Nov 2023
Community and Cultural Facilities Addendum  15 Nov 2023
DAS_Addendum_Part-1  15 Nov 2023
DAS_Addendum_Part-2  15 Nov 2023
DAS_Addendum_Part-3  15 Nov 2023
DAS_Addendum_Part-4  15 Nov 2023
DELIVERY AND SERVICING PLAN LOC  15 Nov 2023
Design Code_Addendum  15 Nov 2023
DRAINAGE STRATEGY LOC  15 Nov 2023
Employment Assessment Addendum  15 Nov 2023
Energy Strategy Addendum  15 Nov 2023
ES Addendum-Part-1  15 Nov 2023
ES Addendum-Part-2  15 Nov 2023
FACTS AND FIGURES SUP15 Nov 2023
Fire Design Amendments  15 Nov 2023
Fire Statement-Rev10  15 Nov 2023
FOUL SEWAGE AND UTILITIES LOC  15 Nov 2023
Gateway 1 statement-Rev10  15 Nov 2023
GLA Carbon Emissions Reporting Sheet  15 Nov 2023
HEALTH IMPACT ASSESSMENT ADDENDUM SUPERSEDED15 Nov 2023
Internal Daylight and Sunlight Addendum  15 Nov 2023
Landscape DAS Addendum  15 Nov 2023
LIGHTING MASTERPLAN LOC  15 Nov 2023
NOISE IMPACT ASSESSMENT_LOC  15 Nov 2023
ODOUR IMPACT ASSESSMENT LOC  15 Nov 2023
OSPPA LETTER OF CONFORMITY  15 Nov 2023
Planning Areas-Compliance  15 Nov 2023
Prelim QDR-Rev02  15 Nov 2023
PRELIMINARY RISK ASSESSMENT LOC  15 Nov 2023
PROTECTED SPECIES REPORT LOC  15 Nov 2023
RAIL IMPACT ASSESSMENT - LOC  15 Nov 2023
Retail and Leisure Statement Addendum  15 Nov 2023
SHEEN LANE LEVEL CROSSING LOC  15 Nov 2023
Site Waste Management Plan  15 Nov 2023
STRUCTURAL IMPACT ASSESSMENT LOC  15 Nov 2023
tag Brewery-sustainable_construction_checklist_2020  15 Nov 2023
Transport Assessment Addendum  15 Nov 2023
TRAVEL PLANS - LOC  15 Nov 2023
VP012 PANORAMA  15 Nov 2023
VP01B PANORAMA  15 Nov 2023
VP02 PANORAMA  15 Nov 2023
VP04 PANORAMA  15 Nov 2023
VP05 PANORAMA  15 Nov 2023
VP06 PANORAMA  15 Nov 2023
VP07 PANORAMA  15 Nov 2023
VP08 PANORAMA  15 Nov 2023
VP09 PANORAMA  15 Nov 2023
VP10 PANORAMA  15 Nov 2023
Waste Management Plan - Rev I  15 Nov 2023
Waterfront Lighting Assessment  15 Nov 2023
drawing register  20 Nov 2023
Health Impact Assessment Addendum  22 Nov 2023
FACTS AND FIGURES  05 Dec 2023
FINANCIAL VIABILITY APPRASIAL.  05 Dec 2023
Drawing list  10 Jan 2024
FVA additional justification  11 Jan 2024
FCMS letter of conformity  12 Jan 2024
Review of FVA  25 Jan 2024