Planning application number: 19/0510/FUL

Site address

Homebase 84 Manor Road Richmond TW9 1YB (View Site Plan)

View

Status:

Granted Permission 23/05/2024

Latest: Decision Issued

Level: Committee Decision

Details

Proposal

Demolition of existing buildings and structures and comprehensive phased residential-led redevelopment to provide 453 residential units (of which 173 units will be affordable), flexible retail, community and office uses, provision of car and cycle parking, landscaping, public and private open spaces and all other necessary enabling works.

Type

Full Application

Ward

NORTH RICHMOND WARD

Applicant

Show applicant details

Agent

Rebecca Doull, Avison Young 65 Gresham Street London EC2V 7NQ

Officer

Lucy Thatcher

Site plan

View Site Plan

Progress

A decision has been issued by the authority.

A copy of the decision notice will appear in the case file soon, and within a maximum of two weeks.
  • Application Received: 14/02/2019
  • Validated: 01/03/2019
  • Neighbour notification started: 24/06/2019
  • Neighbour notification ended: 15/07/2019
  • Decision Issued: 23/05/2024

Documents and images

DescriptionReferenceDate Published
Accommodation Schedule  15 Feb 2019
Air Quality Assessment  15 Feb 2019
Arboricultural Impact Assessment  15 Feb 2019
Archaeology Report  15 Feb 2019
Construction Environmental Management Plan  15 Feb 2019
Contamination Report Part1  15 Feb 2019
Contamination Report Part10  15 Feb 2019
Contamination Report Part11  15 Feb 2019
Contamination Report Part2  15 Feb 2019
Contamination Report Part3  15 Feb 2019
Contamination Report Part4  15 Feb 2019
Contamination Report Part5  15 Feb 2019
Contamination Report Part6  15 Feb 2019
Contamination Report Part7  15 Feb 2019
Contamination Report Part8  15 Feb 2019
Contamination Report Part9  15 Feb 2019
Daylight Sunlight Assessment Part1  15 Feb 2019
Daylight Sunlight Assessment Part2  15 Feb 2019
Daylight Sunlight Assessment Part3  15 Feb 2019
Daylight Sunlight Assessment Part4  15 Feb 2019
Daylight Sunlight Assessment Part5  15 Feb 2019
Daylight Sunlight Assessment Part6  15 Feb 2019
Delivery Servicing Management Plan  15 Feb 2019
Energy Strategy Part1  15 Feb 2019
Energy Strategy Part2  15 Feb 2019
FINANCIAL VIABILITY ASSESSMENT PART1  15 Feb 2019
FINANCIAL VIABILITY ASSESSMENT PART2  15 Feb 2019
GLA carbon emission reporting spreadsheet  15 Feb 2019
Health Impact Assessment  15 Feb 2019
Heritage Statement  15 Feb 2019
Noise Impact Assessment Part1  15 Feb 2019
Noise Impact Assessment Part2  15 Feb 2019
Planning Statement  15 Feb 2019
Preliminary Ecological Appraisal  15 Feb 2019
Statement of Community Involvement  15 Feb 2019
SUPERSEDED - AFFORDABLE HOUSING STATEMENT  15 Feb 2019
SUPERSEDED - AREA SCHEDULE  15 Feb 2019
SUPERSEDED - DESIGN AND ACCESS STATEMENT  15 Feb 2019
SUPERSEDED - DESIGN AND ACCESS STATEMENT  15 Feb 2019
SUPERSEDED - DESIGN AND ACCESS STATEMENT  15 Feb 2019
SUPERSEDED - DESIGN AND ACCESS STATEMENT  15 Feb 2019
SUPERSEDED - DESIGN AND ACCESS STATEMENT  15 Feb 2019
SUPERSEDED - DESIGN AND ACCESS STATEMENT  15 Feb 2019
SUPERSEDED - DESIGN AND ACCESS STATEMENT  15 Feb 2019
SUPERSEDED - WIND MICROCLIMATE ASSESSMENT  15 Feb 2019
Sustainabiilty Checklist  15 Feb 2019
Sustainability Strategy  15 Feb 2019
Townscape Visual Impact Assessment  15 Feb 2019
Transport Assessment Part 1  15 Feb 2019
Transport Assessment Part 2  15 Feb 2019
Transport Assessment Part 3  15 Feb 2019
Travel Plan  15 Feb 2019
Utilities Statement  15 Feb 2019
Waste Management Strategy  15 Feb 2019
(Revised)Design and Acess Statement Part 7  20 Feb 2019
(Revised)Design and Acess Statement Part1  20 Feb 2019
(Revised)Design and Acess Statement Part2  20 Feb 2019
(Revised)Design and Acess Statement Part3  20 Feb 2019
(Revised)Design and Acess Statement Part4  20 Feb 2019
(Revised)Design and Acess Statement Part5  20 Feb 2019
(Revised)Design and Acess Statement Part6  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 1  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 11  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 12  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 13  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 2  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 3  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 4  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 5  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 6  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 7  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 8  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part 9  20 Feb 2019
(Revised)Flood Risk Assessment and Drainage Strategy Part10  20 Feb 2019
Affordable Housing Statement and letter  05 Mar 2019
Lighting Strategy Part1  05 Mar 2019
Lighting Strategy Part2  05 Mar 2019
Lighting Strategy Part3  05 Mar 2019
Manor Road OOLTI response  05 Mar 2019
Manor Road OOLTI_R01  05 Mar 2019
Revised Area Schedule  05 Mar 2019
Tree Planting Strategy - DAS extract  05 Mar 2019
Utilities Statement  05 Mar 2019
Wind Microclimate Assessment  05 Mar 2019
Drawing / Document Issue Sheet  15 Mar 2019
Design Rationale_Part1  03 Jun 2019
Design Rationale_Part2  03 Jun 2019
Fire Safety Statement  03 Jun 2019
REVISED Design and Access Statement Part 1  03 Jun 2019
REVISED Design and Access Statement Part 2  03 Jun 2019
REVISED Design and Access Statement Part 3  03 Jun 2019
REVISED Design and Access Statement Part 4  03 Jun 2019
REVISED Flood Risk Assessment & Drainage Strategy  03 Jun 2019
REVISED Health Impact Assessment  03 Jun 2019
SUPERSEDED TREE PIT DETAILS  03 Jun 2019
SUPERSEDED TREE PIT DETAILS  03 Jun 2019
SUPERSEDED TREE PIT DETAILS  03 Jun 2019
Townscape and Visual Impact Assessment Addendum  03 Jun 2019
Transport Assessment Addendum  03 Jun 2019
Wind Microclimate Assessment  03 Jun 2019
Energy Statement Addendum  06 Jun 2019
Flood Risk Assessment Addendum  06 Jun 2019
District Energy Network Report  18 Jun 2019
A3004 Design and Acess Statement_Addendum_2_Part1  20 Jun 2019
Daylight and Sunlight Independent Review  20 Jun 2019
Daylight and Sunlight Independent Review - APPLICANT RESPONSE  20 Jun 2019
Design and Access Statement_Addendum_2_Part2  20 Jun 2019
Design and Acess Statement_Addendum_2_Part3  20 Jun 2019
Design and Acess Statement_Addendum_2_Part4  20 Jun 2019
Soils Target Volume 1  20 Jun 2019
Soils Target Volume 2  20 Jun 2019
Soils Target Volume 3  20 Jun 2019
Tree Pit Details 1 P11559-00-001-400-0120 Jun 2019
Tree Pit Details 2 P11559-00-001-102-0020 Jun 2019
Tree Pit Details 3 P11559-00-001-101-0120 Jun 2019
Applicant response to updated GLA comments  28 Jun 2019
Applicant Viability Response  28 Jun 2019
Applicant response to committee report  03 Jul 2019
arboricultural appraisal and implications assessment  05 Dec 2019
arboricultural appraisal and implications assessment part 1  05 Dec 2019
arboricultural appraisal and implications assessment part 2  05 Dec 2019
area schedule  05 Dec 2019
carbon emmisions spreadsheet  05 Dec 2019
Health Impact assessment addendum  05 Dec 2019
Health Impact assessment original  05 Dec 2019
heritage statement addendum  05 Dec 2019
heritage statement original  05 Dec 2019
landscape addendum  05 Dec 2019
Manor Road wind microclimate assessment  05 Dec 2019
modelling out BRUKL - residential amenity (green)  05 Dec 2019
modelling out BRUKL - residential amenity (lean)  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Green  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output - DER reports Lean  05 Dec 2019
modelling output BRUKL retail A1  05 Dec 2019
modelling output BRUKL retail A1 (lean)  05 Dec 2019
Revised Air Quality Assessment  05 Dec 2019
revised commercial travel plan  05 Dec 2019
revised construction environmental management plan  05 Dec 2019
revised energy strategy  05 Dec 2019
revised energy strategy part 1  05 Dec 2019
revised energy strategy part 2  05 Dec 2019
revised fire safety statement  05 Dec 2019
revised lighting strategy  05 Dec 2019
revised noise and vibration impact assessment  05 Dec 2019
revised noise and vibration impact assessment part 1  05 Dec 2019
revised noise and vibration impact assessment part 2  05 Dec 2019
revised residentail travel plan  05 Dec 2019
revised servicing and delivery management plan  05 Dec 2019
revised waste management strategy  05 Dec 2019
revsied sustainability strategy  05 Dec 2019
Townscape and Visual Impact appraisal Addendum V2  05 Dec 2019
Townscape and Visula Impact appraisal  05 Dec 2019
Townscape and Visula Impact appraisal addendum  05 Dec 2019
utilities statement  05 Dec 2019
Daylighrt and Sunlight Report V2 part 2  09 Dec 2019
Daylight and Sunlight Report V2 part 1  09 Dec 2019
Daylight and Sunlight Report V2 part 3  09 Dec 2019
Daylight and Sunlight Report V2 part 4  09 Dec 2019
Daylight and Sunlight Report V2 part 5  09 Dec 2019
Daylight and Sunlight Report V2 part 6  09 Dec 2019
Daylight and Sunlight Report V2 part 7  09 Dec 2019
Design and Access Statement R2 Part 1  09 Dec 2019
Design and Access Statement R2 Part 2  09 Dec 2019
Design and Access Statement R2 Part 3  09 Dec 2019
Design and Access Statement R2 Part 4  09 Dec 2019
Design and Access Statement R2 Part 5  09 Dec 2019
Design and Access Statement R2 Part 6  09 Dec 2019
Design and Access Statement R2 Part 7  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 2  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 3  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 4  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 5  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 1  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 10  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 11  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 12  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 6  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 7  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 8  09 Dec 2019
Geo-Environmental and Geotechnical Preliminary Risk Assessment part 9  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 1  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 10  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 11  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 12  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 13  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 14  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 15  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 16  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 2  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 3  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 4  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 5  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 6  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 7  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 8  09 Dec 2019
Revised Flood Risk Assessment and Drainage strategy part 9  09 Dec 2019
Revised Travel Assessment part 1  09 Dec 2019
Revised Travel Assessment part 2  09 Dec 2019
Revised Travel Assessment part 3  09 Dec 2019
Design Statement - Planning Addendum part 1  11 Dec 2019
Design Statement - Planning Addendum part 2  11 Dec 2019
Design Statement - Planning Addendum part 3  11 Dec 2019
Design Statement - Planning Addendum part 4  11 Dec 2019
Design Statement - Planning Addendum part 5  11 Dec 2019
Design Statement - Planning Addendum part 6  11 Dec 2019
aboricultural assessment addendum  05 Aug 2020
area schedule  05 Aug 2020
circular economy statement  05 Aug 2020
construction environmental management plan  05 Aug 2020
desian and access statement landscape addendum  05 Aug 2020
Design and Access Statement architectural addendum part 1  05 Aug 2020
Design and Access Statement architectural addendum part 10  05 Aug 2020
Design and Access Statement architectural addendum part 11  05 Aug 2020
Design and Access Statement architectural addendum part 2  05 Aug 2020
Design and Access Statement architectural addendum part 3  05 Aug 2020
Design and Access Statement architectural addendum part 4  05 Aug 2020
Design and Access Statement architectural addendum part 5  05 Aug 2020
Design and Access Statement architectural addendum part 6  05 Aug 2020
Design and Access Statement architectural addendum part 7  05 Aug 2020
Design and Access Statement architectural addendum part 8  05 Aug 2020
Design and Access Statement architectural addendum part 9  05 Aug 2020
GLA carbon emissions reporting spreadsheet  05 Aug 2020
health impact assessment addendum  05 Aug 2020
heritage statement addendum  05 Aug 2020
planing statement addendum  05 Aug 2020
revised air quality assessment  05 Aug 2020
revised commercial travel plan  05 Aug 2020
revised daylight and sunlight report part 10  05 Aug 2020
revised daylight and sunlight report part 2  05 Aug 2020
revised daylight and sunlight report part 3  05 Aug 2020
revised daylight and sunlight report part 4  05 Aug 2020
revised daylight and sunlight report part 5  05 Aug 2020
revised daylight and sunlight report part 6  05 Aug 2020
revised daylight and sunlight report part 7  05 Aug 2020
revised daylight and sunlight report part 8  05 Aug 2020
revised daylight and sunlight report part 9  05 Aug 2020
revised daylihgt and sunlight report part 1  05 Aug 2020
revised energy strategy  05 Aug 2020
revised fire safety statement  05 Aug 2020
revised FRA and drainage strategy part 1  05 Aug 2020
revised FRA and drainage strategy part 10  05 Aug 2020
revised FRA and drainage strategy part 2  05 Aug 2020
revised FRA and drainage strategy part 3  05 Aug 2020
revised FRA and drainage strategy part 4  05 Aug 2020
revised FRA and drainage strategy part 5  05 Aug 2020
revised FRA and drainage strategy part 6  05 Aug 2020
revised FRA and drainage strategy part 7  05 Aug 2020
revised FRA and drainage strategy part 8  05 Aug 2020
revised FRA and drainage strategy part 9  05 Aug 2020
revised lighting design strategy  05 Aug 2020
revised noise virbation impact assessment  05 Aug 2020
revised preliminary risk assessment part 1  05 Aug 2020
revised preliminary risk assessment part 2  05 Aug 2020
revised preliminary risk assessment part 3  05 Aug 2020
revised preliminary risk assessment part 4  05 Aug 2020
revised preliminary risk assessment part 5  05 Aug 2020
revised preliminary risk assessment part 6  05 Aug 2020
revised preliminary risk assessment part 7  05 Aug 2020
revised preliminary risk assessment part 8  05 Aug 2020
revised residentail travel plan  05 Aug 2020
revised residential travel plan part 1  05 Aug 2020
revised residential travel plan part 2  05 Aug 2020
revised serviceing and delevery management plan  05 Aug 2020
revised sustainability strategy  05 Aug 2020
revised transport assessment part 1  05 Aug 2020
revised transport assessment part 2  05 Aug 2020
revised transport assessment part 3  05 Aug 2020
revised transport assessment part 4  05 Aug 2020
revised transport assessment part 5  05 Aug 2020
revised utilities statement  05 Aug 2020
revised waste management strategy addendum  05 Aug 2020
revised wind microclimate assessment  05 Aug 2020
townscape and visual impact assessment addendum part 1  05 Aug 2020
townscape and visual impact assessment addendum part 2  05 Aug 2020
townscape and visula impact appraisal addendum  05 Aug 2020
Whole Life Carbon assessment  05 Aug 2020
Whole Life Carbon Calculations - GLA  05 Aug 2020
London Design Review Panel Letter  18 Aug 2020
Commercial Travel Plan (November 2021  25 Nov 2021
Construction Environmental Management Plan (November 2021).  25 Nov 2021
Design and Access Statement Addendum (November 2021)  25 Nov 2021
Design and Access Statement Landscape Addendum (November 2021).  25 Nov 2021
Digital Connectivity Note  25 Nov 2021
Planning Statement Addendum (November 2021).  25 Nov 2021
Residential Travel Plan (November 2021)  25 Nov 2021
Transport Assessment Addendum (Part 1of 3).  25 Nov 2021
Transport Assessment Addendum (Part 2 of 3).  25 Nov 2021
Transport Assessment Addendum (Part 3 of 3).  25 Nov 2021
Waste Management Strategy Addendum (November 2021)  25 Nov 2021
Aboricultural Report Addendum Supplemental - September 2023  09 Oct 2023
Air Quality Assessment Addendum Supplemental - September 2023  09 Oct 2023
Air Quality Positive Email Supplemental - September 2023  09 Oct 2023
Arboricultural Appraisal & Implications Assessment Supplemental - September 2023  09 Oct 2023
Area Schedule - September 2023  09 Oct 2023
Basement Impact Assessment (Part 1) - September 2023  09 Oct 2023
Basement Impact Assessment (Part 2) - September 2023  09 Oct 2023
Basement Impact Assessment (Part 3) - September 2023  09 Oct 2023
Basement Impact Assessment (Part 4) - September 2023  09 Oct 2023
Basement Impact Assessment (Part 5) - September 2023  09 Oct 2023
Carbon Emissions Reporting Spreadsheet - September 2023  09 Oct 2023
Circular Economy Spreadsheet - September 2023  09 Oct 2023
Circular Economy Statement - September 2023  09 Oct 2023
Construction Environmental Management Plan - September 2023  09 Oct 2023
Design and Access Statement Addendum Supplemental (PART 1) - September 2023  09 Oct 2023
Design and Access Statement Addendum Supplemental (PART 2) - September 2023  09 Oct 2023
Design and Access Statement Addendum Supplemental (PART 3) - September 2023  09 Oct 2023
Design and Access Statement Addendum Supplemental (PART 4) - September 2023  09 Oct 2023
Design and Access Statement Addendum Supplemental (PART 5) - September 2023  09 Oct 2023
Design and Access Statement Addendum Supplemental (PART 6) - September 2023  09 Oct 2023
Design and Access Statement Addendum Supplemental (PART 7) - September 2023  09 Oct 2023
DLSL Addendum Letter Supplemental - September 2023  09 Oct 2023
Drainage Strategy (Part 1) - September 2023  09 Oct 2023
Drainage Strategy (Part 2) - September 2023  09 Oct 2023
Drainage Strategy (Part 3) - September 2023  09 Oct 2023
Drainage Strategy (Part 4) - September 2023  09 Oct 2023
Drainage Strategy (Part 5) - September 2023  09 Oct 2023
Drainage Strategy (Part 6) - September 2023  09 Oct 2023
Ecology & BNG Report - September 2023  09 Oct 2023
Energy Statement - September 2023  09 Oct 2023
Flood Modelling Report (Part 1) - September 2023  09 Oct 2023
Flood Modelling Report (Part 2) - September 2023  09 Oct 2023
Flood Policy Changes Supplemental - September 2023  09 Oct 2023
Flood Risk Assessment - September 2023  09 Oct 2023
Flood Risk Assessment Addendum - September 2023  09 Oct 2023
Flood Technical Note - September 2023  09 Oct 2023
Flood Warning and Evacuation Plan - September 2023  09 Oct 2023
Flooding Sequential Test - September 2023  09 Oct 2023
Gateway One Fire Form - September 2023  09 Oct 2023
Health Impact Assessment Addendum Supplemental - September 2023  09 Oct 2023
Internal Daylight Sunlight Assessment Supplemental (Part 1) - September 2023  09 Oct 2023
Internal Daylight Sunlight Assessment Supplemental (Part 2)  09 Oct 2023
Landscape Design and Access Statement Addendum Supplemental (Part 1) - September 2023  09 Oct 2023
Landscape Design and Access Statement Addendum Supplemental (Part 2)  09 Oct 2023
Landscape Design and Access Statement Addendum Supplemental (Part 3) - September 2023  09 Oct 2023
Landscape Design and Access Statement Addendum Supplemental (Part 4) - September 2023  09 Oct 2023
Landscape Design and Access Statement Addendum Supplemental (Part 5)  09 Oct 2023
London Plan Fire Statement - September 2023  09 Oct 2023
Noise and Vibration Assessment (Part 1) - September 2023  09 Oct 2023
Noise and Vibration Assessment (Part 2) - September 2023  09 Oct 2023
Noise and Vibration Note Supplemental - September 2023  09 Oct 2023
Planning Statement Addendum Supplemental - September 2023  09 Oct 2023
Summary Flood Note - September 2023  09 Oct 2023
Sustainability Statement - September 2023  09 Oct 2023
Transport Assessment Addendum Supplemental (Part 1) - September 2023  09 Oct 2023
Transport Assessment Addendum Supplemental (Part 2) - September 2023  09 Oct 2023
Transport Assessment Addendum Supplemental (Part 3) - September 2023  09 Oct 2023
Transport Assessment Addendum Supplemental (Part 4)  09 Oct 2023
Transport Assessment Addendum Supplemental (Part 5) - September 2023  09 Oct 2023
Transport Assessment Addendum Supplemental (Part 6) - September 2023  09 Oct 2023
TVIA Addendum Supplemental - September 2023  09 Oct 2023
Waste Management Strategy Addendum Supplemental - September 2023  09 Oct 2023
WLCC Assessment - September 2023  09 Oct 2023