Planning application number: 22/0900/OUT

Site address

The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET (View Site Plan)

View

Status:

In Progress. Appeal Lodged on 28/02/2024

Latest: Assessment stage

Decision due: 30/04/2023

Level: Committee Decision

Make a comment Contact us

Details

Proposal

Hybrid application to include: 1. Demolition of existing buildings (except the Maltings and the façade of the Bottling Plant and former Hotel), walls, associated structures, site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site: 2. Detailed application for the works to the east side of Ship Lane which comprise: a. Alterations and extensions to existing buildings and erection of buildings varying in height from 3 to 9 storeys plus a basement of one to two storeys below ground to allow for residential apartments; flexible use floorspace for retail, financial and professional services, café/restaurant and drinking establishment uses, offices, non-residential institutions and community use and boathouse; Hotel / public house with accommodation; Cinema and Offices. b. New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works c. Provision of on-site cycle, vehicle and servicing parking at surface and basement level d. Provision of public open space, amenity and play space and landscaping e. Flood defence and towpath works f. Installation of plant and energy equipment 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise: a. The erection of a single storey basement and buildings varying in height from 3 to 8 storeys b. Residential development c. Provision of on-site cycle, vehicle and servicing parking d. Provision of public open space, amenity and play space and landscaping e. New pedestrian, vehicle and cycle accesses and internal routes, and associated highways works.

Type

Outline Application

Ward

MORTLAKE AND BARNES COMMON WARD

Applicant

Show applicant details

Agent

Anna Gargan 72 Welbeck Street London W1G 0AY

Officer

Lucy Thatcher

Site plan

View Site Plan

Progress

The case officer will be assessing the entire case in detail as well as reviewing comments submitted.

View comments
  • Application Received: 17/03/2022
  • Validated: 11/04/2022
  • Neighbour notification started: 22/01/2024
  • Neighbour notification ended: 14/01/2023

Documents and images

Public comments

DescriptionReferenceDate Published
BUILDING 12- PROPOSED TYPICAL FLOOR PLANS C645_B12_P_TY_00118 Mar 2022
DEVELOPMENT AREA 1 FLOOD DEFENCE PLAN P10736-00-004-GIL-011618 Mar 2022
DEVELOPMENT AREA 1 LANDSCAPE GA PLAN P10736-00-004-GIL-010318 Mar 2022
DEVELOPMENT AREA 1 LANDSCAPE RENDERED MASTERPLAN P10736-00-004-GIL-010218 Mar 2022
PROPOSED DEVELOPMENT AREA 1: SEATING PLAN P10736-00-004-GIL-010418 Mar 2022
PROPOSED RIVER TERRACE BOUNDARY WALL TREATMENT PLAN P10736-00-004-GIL-010618 Mar 2022
PROPOSED SITE WIDE CIRCULATION PLAN-PEDESTRIAN P10736-00-004-GIL-010918 Mar 2022
PROPOSED SITE WIDE HARD LANDSCAPE PLAN P10736-00-004-GIL-014018 Mar 2022
PROPOSED SITE WIDE LANDSCAPE GA PLAN P10736-00-004-GIL-010118 Mar 2022
PROPOSED SITE WIDE LANDSCAPE RENDERED MASTERPLAN P10736-00-004-GIL-010018 Mar 2022
- BUILDING 01 - PROPOSED SOUTH ELEVATION 18125_C645_B01_E_S_001_F21 Mar 2022
BUILDING 01 - PROPOSED EAST ELEVATION 18125_C645_B01_E_E_001_F -21 Mar 2022
BUILDING 01 - PROPOSED FIRST FLOOR PLAN 18125_C645_B01_P_01_001_E -21 Mar 2022
BUILDING 01 - PROPOSED GROUND FLOOR PLAN 18125_C645_B01_P_00_001_E -21 Mar 2022
BUILDING 01 - PROPOSED LEVEL BASEMENT 1 PLAN 18125_C645_B01_P_B1_001_E -21 Mar 2022
BUILDING 01 - PROPOSED LEVEL BASEMENT 2 PLAN 18125_C645_B01_P_B2_001_E -21 Mar 2022
BUILDING 01 - PROPOSED NORTH ELEVATION 18125_C645_B01_E_N_001_F -21 Mar 2022
BUILDING 01 - PROPOSED ROOF PLAN 18125_C645_B01_P_RF_001_F -21 Mar 2022
BUILDING 01 - PROPOSED SECOND FLOOR PLAN 18125_C645_B01_P_02_001_E -21 Mar 2022
BUILDING 01 - PROPOSED THIRD FLOOR PLAN 18125_C645_B01_P_03_001_F -21 Mar 2022
BUILDING 01 - PROPOSED WEST ELEVATION 18125_C645_B01_E_W_001_F -21 Mar 2022
BUILDING 02 - PROPOSED ACCESSIBLE UNIT - APARTMENT 2.TY1.17 18125_C645_B02_P_TY1_003_D -21 Mar 2022
BUILDING 02 - PROPOSED ACCESSIBLE UNIT - APARTMENT 2.TY1.3 18125_C645_B02_P_TY1_002_D -21 Mar 2022
BUILDING 02 - PROPOSED EAST ELEVATION 18125_C645_B02_E_E_001_E -21 Mar 2022
BUILDING 02 - PROPOSED EIGHTH FLOOR PLAN 18125_C645_B02_P_08_001_E -21 Mar 2022
BUILDING 02 - PROPOSED GROUND FLOOR PLAN 18125_C645_B02_P_00_001_E -21 Mar 2022
BUILDING 02 - PROPOSED NORTH ELEVATION 2 18125_C645_B02_E_N_002_E -21 Mar 2022
BUILDING 02 - PROPOSED ROOF PLAN 18125_C645_B02_P_RF_001_E -21 Mar 2022
BUILDING 02 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B02_P_07_001_E -21 Mar 2022
BUILDING 02 - PROPOSED SOUTH ELEVATION 18125_C645_B02_E_S_001_E -21 Mar 2022
BUILDING 02 - PROPOSED TYPICAL FLOOR 1 (SECOND TO FIFTH LEVELS) 18125_C645_B02_P_TY1_001_E -21 Mar 2022
BUILDING 02 - PROPOSED TYPICAL FLOOR 2 (FIRST AND SIXTH LEVELS) 18125_C645_B02_P_TY2_001_E -21 Mar 2022
BUILDING 03 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B03_P_00_004_D -21 Mar 2022
BUILDING 03 - PROPOSED EAST ELEVATION 18125_C645_B03_E_E_001_E -21 Mar 2022
BUILDING 03 - PROPOSED GROUND FLOOR PLAN 18125_C645_B03_P_00_001_E -21 Mar 2022
BUILDING 03 - PROPOSED NORTH ELEVATION 18125_C645_B03_E_N_001_E -21 Mar 2022
BUILDING 03 - PROPOSED WEST ELEVATION 18125_C645_B03_E_W_001_E -21 Mar 2022
BUILDING 04 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B04_P_00_002_D -21 Mar 2022
BUILDING 04 - PROPOSED EAST ELEVATION 18125_C645_B04_E_E_001_E -21 Mar 2022
BUILDING 04 - PROPOSED FIFTH FLOOR PLAN 18125_C645_B04_P_05_001_E -21 Mar 2022
BUILDING 04 - PROPOSED FIRST FLOOR PLAN 18125_C645_B04_P_01_001_E -21 Mar 2022
BUILDING 04 - PROPOSED GROUND FLOOR PLAN 18125_C645_B04_P_00_001_E -21 Mar 2022
BUILDING 04 - PROPOSED NORTH ELEVATION 18125_C645_B04_E_N_001_E -21 Mar 2022
BUILDING 04 - PROPOSED SOUTH ELEVATION 18125_C645_B04_E_S_001_E -21 Mar 2022
BUILDING 04 - PROPOSED THIRD FLOOR PLAN 18125_C645_B04_P_03_001_E -21 Mar 2022
BUILDING 04 - PROPOSED WEST ELEVATION 18125_C645_B04_E_W_002_E -21 Mar 2022
BUILDING 07 - ACCESSIBLE UNIT- APARTMENT 7.G.4 18125_C645_B07_P_00_004_D -21 Mar 2022
BUILDING 07 - PROPOSED EAST ELEVATION 18125_C645_B07_E_E_001_E -21 Mar 2022
BUILDING 07 - PROPOSED EIGHTH FLOOR PLAN 18125_C645_B07_P_08_001_E -21 Mar 2022
BUILDING 07 - PROPOSED GROUND FLOOR PLAN 18125_C645_B07_P_00_001_E -21 Mar 2022
BUILDING 07 - PROPOSED ROOF PLAN C645_B07_P_RF_001 REV E21 Mar 2022
BUILDING 07 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B07_P_07_001_E -21 Mar 2022
BUILDING 07 - PROPOSED TYPICAL FLOOR 1 (SECOND TO FIFTH LEVELS) 18125_C645_B07_P_TY1_001_E -21 Mar 2022
BUILDING 07 - PROPOSED TYPICAL FLOOR 2 (FIRST AND SIXTH LEVELS) 18125_C645_B07_P_TY2_001_E -21 Mar 2022
BUILDING 07 - PROPOSED WEST ELEVATION 18125_C645_B07_E_W_001_E -21 Mar 2022
BUILDING 08 - ACCESSIBLE UNIT - APARTMENT 8.G.5 18125_C645_B08_P_00_002_D -21 Mar 2022
BUILDING 08 - ACCESSIBLE UNIT APARTMENT 8.TY1.2 18125_C645_B08_P_TY1_004_- -21 Mar 2022
BUILDING 08 - ACCESSIBLE UNIT APARTMENT 8.TY1.4 18125_C645_B08_P_TY1_002_D -21 Mar 2022
BUILDING 08 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B08_P_00_005_D -21 Mar 2022
BUILDING 08 - PROPOSED EAST ELEVATION 18125_C645_B08_E_E_001_E -21 Mar 2022
BUILDING 08 - PROPOSED EIGHTH FLOOR PLAN 18125_C645_B08_P_08_001_E -21 Mar 2022
BUILDING 08 - PROPOSED FIRST FLOOR 18125_C645_B08_P_01_001_A -21 Mar 2022
BUILDING 08 - PROPOSED ROOF PLAN 18125_C645_B08_P_RF_001_E -21 Mar 2022
BUILDING 08 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B08_P_07_001_E -21 Mar 2022
BUILDING 08 - PROPOSED SIXTH FLOOR PLAN 18125_C645_B08_P_06_001_A -21 Mar 2022
BUILDING 08 - PROPOSED SOUTH ELEVATION 18125_C645_B08_E_S_001_E -21 Mar 2022
BUILDING 08 - PROPOSED TYPICAL FLOOR 1 (SECOND TO FIFTH LEVELS) 18125_C645_B08_P_TY1_001_E -21 Mar 2022
BUILDING 08 - PROPOSED WEST ELEVATION 1 18125_C645_B08_E_W_001_E -21 Mar 2022
BUILDING 08 - PROPOSED WEST ELEVATION 2 18125_C645_B08_E_W_002_E -21 Mar 2022
BUILDING 10 - PROPOSED EAST ELEVATION 18125_C645_B10_E_E_001_E -21 Mar 2022
BUILDING 10 - PROPOSED GROUND FLOOR PLAN 18125_C645_B10_P_00_001_E -21 Mar 2022
BUILDING 10 - PROPOSED NORTH ELEVATION 18125_C645_B10_E_N_001_E -21 Mar 2022
BUILDING 10 - PROPOSED SOUTH ELEVATION 18125_C645_B10_E_S_001_E -21 Mar 2022
BUILDING 10 - PROPOSED WEST ELEVATION 18125_C645_B10_E_W_001_E -21 Mar 2022
BUILDING 11 - ACCESSIBLE UNIT - APARTMENT 11.G.1 18125_C645_B11_P_00_002_D -21 Mar 2022
BUILDING 11 - ACCESSIBLE UNIT APARTMENT 11.G.2 18125_C645_B11_P_00_003_D -21 Mar 2022
BUILDING 11 - PROPOSED EAST ELEVATION 18125_C645_B11_E_E_001_E -21 Mar 2022
BUILDING 11 - PROPOSED GROUND FLOOR PLAN 18125_C645_B11_P_00_001_E -21 Mar 2022
BUILDING 11 - PROPOSED ROOF PLAN 18125_C645_B11_P_RF_001_E -21 Mar 2022
BUILDING 11 - PROPOSED TYPICAL FLOOR 1 (SECOND TO FIFTH LEVELS) 18125_C645_B11_P_TY1_001_E -21 Mar 2022
BUILDING 11 - PROPOSED TYPICAL FLOOR 2 (FIRST AND SIXTH LEVELS) 18125_C645_B11_P_TY2_001_E -21 Mar 2022
BUILDING 11 - PROPOSED WEST ELEVATION 18125_C645_B11_E_W_001_E -21 Mar 2022
BUILDING 12 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B12_P_00_004_D -21 Mar 2022
BUILDING 12 - PROPOSED EAST ELEVATION 18125_C645_B12_E_E_001_E -21 Mar 2022
BUILDING 12 - PROPOSED GROUND FLOOR PLAN 18125_C645_B12_P_00_001_E -21 Mar 2022
BUILDING 12 - PROPOSED NORTH ELEVATION 2 18125_C645_B12_E_N_002_E -21 Mar 2022
BUILDING 12 - PROPOSED ROOF PLAN 18125_C645_B12_P_RF_001_E -21 Mar 2022
BUILDING 12 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B12_P_07_001_E -21 Mar 2022
BUILDING 12 - PROPOSED SIXTH FLOOR PLAN 18125_C645_B12_P_06_001_E -21 Mar 2022
BUILDING 12 - PROPOSED WEST ELEVATION 18125_C645_B12_E_W_001_E -21 Mar 2022
CINEMA BAY STUDY ELEVATION 18125_C645_Z1_E_01_008_E -21 Mar 2022
PROPOSED DEVELOPMENT AREA 01 GROUND LEVEL PLAN 18125_C645_Z1_P_00_001_D -21 Mar 2022
PROPOSED DEVELOPMENT AREA 01 BASEMENT PLAN 18125_C645_Z1_P_B1_001_E -21 Mar 2022
PROPOSED DEVELOPMENT AREA 01 TYPICAL LEVEL PLAN 18125_C645_Z1_P_TY_001_D -21 Mar 2022
PROPOSED DEVELOPMENT AREA 02 GROUND LEVEL PLAN 18125_C645_Z2_P_00_001_D -21 Mar 2022
PROPOSED DEVELOPMENT AREA 02 GROUND LEVEL PLAN 18125_C645_Z2_P_00_002_D -21 Mar 2022
PROPOSED DEVELOPMENT AREA 02 BASEMENT PLAN 18125_C645_Z2_P_B1_001_E -21 Mar 2022
PROPOSED DEVELOPMENT AREA 2 TYPICAL LEVEL PLAN 18125_C645_Z2_P_TY_001_D -21 Mar 2022
PROPOSED DEVELOPMENT AREA 2 TYPICAL LEVEL PLAN 18125_C645_Z2_P_TY_002_D -21 Mar 2022
PROPOSED LAND USE DISTRIBUTION - BASEMENT 18125_C645_Z2_P_PR_009_F -21 Mar 2022
PROPOSED MASTERPLAN FIFTH FLOOR LEVEL - OBSCURE GLAZING EXERCISE_COMPRESSED 18125_SQP-ZZ-SK-028_A -21 Mar 2022
PROPOSED MASTERPLAN FIRST FLOOR LEVEL - OBSCURE GLAZING EXERCISE_COMPRESSED 18125_SQP-ZZ-SK-020_A -21 Mar 2022
PROPOSED MASTERPLAN FOURTH FLOOR LEVEL - OBSCURE GLAZING EXERCISE_COMPRESSED 18125_SQP-ZZ-SK-026_A -21 Mar 2022
PROPOSED MASTERPLAN GROUND FLOOR LEVEL 18125_C645_MP_P_00_001_E -21 Mar 2022
PROPOSED MASTERPLAN GROUND FLOOR LEVEL - OBSCURE GLAZING EXERCISE 18125_SQP-ZZ-SK-018_A -21 Mar 2022
PROPOSED MASTERPLAN SECOND FLOOR LEVEL - OBSCURE GLAZING EXERCISE_COMPRESSED 18125_SQP-ZZ-SK-022_A -21 Mar 2022
PROPOSED MASTERPLAN SEVENTH FLOOR LEVEL - OBSCURE GLAZING EXERCISE_COMPRESSED 18125_SQP-ZZ-SK-032_A -21 Mar 2022
PROPOSED MASTERPLAN SIXTH FLOOR LEVEL - OBSCURE GLAZING EXERCISE_COMPRESSED 18125_SQP-ZZ-SK-030_A -21 Mar 2022
PROPOSED MASTERPLAN THIRD FLOOR LEVEL - OBSCURE GLAZING EXERCISE_COMPRESSED 18125_SQP-ZZ-SK-024_A -21 Mar 2022
PROPOSED MASTERPLAN TYPICAL FLOOR LEVEL 18125_C645_MP_P_TY_001_E -21 Mar 2022
PROPOSED SITE ELEVATION AA 18125_C645_Z1_E_AA_001_E -21 Mar 2022
PROPOSED SITE ELEVATION BB 18125_C645_Z1_E_BB_001_E -21 Mar 2022
PROPOSED SITE ELEVATION DD 18125_C645_Z1_E_DD_001_D -21 Mar 2022
PROPOSED SITE ELEVATION EE 18125_C645_Z1_E_EE_001_D -21 Mar 2022
PROPOSED SITE ELEVATION FF 18125_C645_Z1_E_FF_001_E -21 Mar 2022
PROPOSED SITE ELEVATION GG 18125_C645_Z1_E_GG_001_D -21 Mar 2022
PROPOSED SITE ELEVATION HH 18125_C645_Z1_E_HH_001_E -21 Mar 2022
PROPOSED SITE ELEVATION II 18125_C645_Z1_E_II_001_E -21 Mar 2022
PROPOSED SITE ELEVATION RR 18125_C645_Z2_E_RR_001_E -21 Mar 2022
PROPOSED SITE SECTION AA 18125_C645_Z1_S_AA_001_E -21 Mar 2022
PROPOSED SITE SECTION BB 18125_C645_Z1_S_BB_001_D -21 Mar 2022
PROPOSED SITE SECTION EE 18125_C645_Z2_S_EE_001_E -21 Mar 2022
PROPOSED SITE WIDE CIRCULATION PLAN - VEHICULAR P10736-00-004-GIL-0107-0108 Apr 2022
AREA 01 - PLANNING LIGHTING ARRANGEMENT SUPERSEDED05 Dec 2022
AREA 02 - PLANNING LIGHTING ARRANGEMENT SUPERSEDED05 Dec 2022
BUILDING 01 - PROPOSED EAST ELEVATION 18125_C645_B01_E_E_001_G05 Dec 2022
BUILDING 01 - PROPOSED FIRST FLOOR PLAN 18125_C645_B01_P_01_001_F05 Dec 2022
BUILDING 01 - PROPOSED GROUND FLOOR PLAN 18125_C645_B01_P_00_001_F05 Dec 2022
BUILDING 01 - PROPOSED LEVEL BASEMENT 1 PLAN 18125_C645_B01_P_B1_001_F05 Dec 2022
BUILDING 01 - PROPOSED LEVEL BASEMENT 2 PLAN 18125_C645_B01_P_B2_001_F05 Dec 2022
BUILDING 01 - PROPOSED NORTH ELEVATION 18125_C645_B01_E_N_001_G05 Dec 2022
BUILDING 01 - PROPOSED ROOF PLAN 18125_C645_B01_P_RF_001_G05 Dec 2022
BUILDING 01 - PROPOSED SECOND FLOOR PLAN 18125_C645_B01_P_02_001_F05 Dec 2022
BUILDING 01 - PROPOSED SOUTH ELEVATION 18125_C645_B01_E_S_001_G05 Dec 2022
BUILDING 01 - PROPOSED THIRD FLOOR PLAN 18125_C645_B01_P_03_001_G05 Dec 2022
BUILDING 01 - PROPOSED WEST ELEVATION 18125_C645_B01_E_W_001_G05 Dec 2022
BUILDING 02 - GROUND FLOOR LEVEL REFUSE STORE PLANS 18125_C645_B02_P_00_009_05 Dec 2022
BUILDING 02 - PROPOSED ACCESSIBLE UNIT APARTMENT 2.TY1.16 18125_C645_B02_P_TY1_003_E05 Dec 2022
BUILDING 02 - PROPOSED ACCESSIBLE UNIT APARTMENT 2.TY1.3 18125_C645_B02_P_TY1_002_E05 Dec 2022
BUILDING 02 - PROPOSED EIGHTH FLOOR PLAN 18125_C645_B02_P_08_001_F05 Dec 2022
BUILDING 02 - PROPOSED GROUND FLOOR PLAN 18125_C645_B02_P_00_001_F05 Dec 2022
BUILDING 02 - PROPOSED ROOF PLAN. 18125_C645_B02_P_RF_001_F05 Dec 2022
BUILDING 02 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B02_P_07_001_F05 Dec 2022
BUILDING 02 - PROPOSED SOUTH ELEVATION 18125_C645_B02_E_S_001_F05 Dec 2022
BUILDING 02 - PROPOSED TYPICAL FLOOR 1 (SECOND TO FIFTH LEVELS). 18125_C645_B02_P_TY1_001_F05 Dec 2022
BUILDING 02 - PROPOSED TYPICAL FLOOR 2 (FIRST AND SIXTH LEVELS) 18125_C645_B02_P_TY2_001_F05 Dec 2022
BUILDING 03 - ACCESSIBLE UNIT APARTMENT 3.G.2. 18125_C645_B03_P_00_005_05 Dec 2022
BUILDING 03 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B03_P_00_004_E05 Dec 2022
BUILDING 03 - PROPOSED EAST ELEVATION 18125_C645_B03_E_E_001_F05 Dec 2022
BUILDING 03 - PROPOSED GROUND FLOOR PLAN 18125_C645_B03_P_00_001_F05 Dec 2022
BUILDING 03 - PROPOSED NORTH ELEVATION 18125_C645_B03_E_N_001_F05 Dec 2022
BUILDING 03 - PROPOSED WEST ELEVATION 18125_C645_B03_E_W_001_F05 Dec 2022
BUILDING 04 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B04_P_00_002_E05 Dec 2022
BUILDING 04 - PROPOSED EAST ELEVATION 18125_C645_B04_E_E_001_F05 Dec 2022
BUILDING 04 - PROPOSED FIFTH FLOOR PLAN 18125_C645_B04_P_05_001_F05 Dec 2022
BUILDING 04 - PROPOSED FIRST FLOOR PLAN 18125_C645_B04_P_01_001_F05 Dec 2022
BUILDING 04 - PROPOSED FOURTH FLOOR PLAN 18125_C645_B04_P_04_001_F05 Dec 2022
BUILDING 04 - PROPOSED GROUND FLOOR PLAN 18125_C645_B04_P_00_001_F05 Dec 2022
BUILDING 04 - PROPOSED SECOND FLOOR PLAN. 18125_C645_B04_P_02_001_F05 Dec 2022
BUILDING 04 - PROPOSED SOUTH ELEVATION 18125_C645_B04_E_S_001_F05 Dec 2022
BUILDING 04 - PROPOSED THIRD FLOOR PLAN 18125_C645_B04_P_03_001_F05 Dec 2022
BUILDING 07 - ACCESSIBLE UNIT APARTMENT 7.G.4. 18125_C645_B07_P_00_004_E05 Dec 2022
BUILDING 07 - GROUND FLOOR LEVEL REFUSE STORE PLANS 18125_C645_B07_P_00_005_-05 Dec 2022
BUILDING 07 - PROPOSED EAST ELEVATION 18125_C645_B07_E_E_001_F05 Dec 2022
BUILDING 07 - PROPOSED GROUND FLOOR PLAN. 18125_C645_B07_P_00_001_F05 Dec 2022
BUILDING 07 - PROPOSED SEVENTH FLOOR PLAN. 18125_C645_B07_P_07_001_F05 Dec 2022
BUILDING 07 - PROPOSED TYPICAL FLOOR 1 (SECOND TO FIFTH LEVELS) 18125_C645_B07_P_TY1_001_F05 Dec 2022
BUILDING 07 - PROPOSED TYPICAL FLOOR 2 (FIRST AND SIXTH LEVELS) 18125_C645_B07_P_TY2_001_F05 Dec 2022
BUILDING 07 - PROPOSED WEST ELEVATION 18125_C645_B07_E_W_001_F05 Dec 2022
BUILDING 08 - ACCESSIBLE UNIT APARTMENT 8.G.5 18125_C645_B08_P_00_002_E05 Dec 2022
BUILDING 08 - ACCESSIBLE UNIT APARTMENT 8.TY1.2 18125_C645_B08_P_TY1_004_A05 Dec 2022
BUILDING 08 - GROUND FLOOR LEVEL REFUSE STORE PLAN. 18125_C645_B08_P_00_005_E05 Dec 2022
BUILDING 08 - PROPOSED EAST ELEVATION 18125_C645_B08_E_E_001_F05 Dec 2022
BUILDING 08 - PROPOSED EIGHTH FLOOR PLAN 18125_C645_B08_P_08_001_F05 Dec 2022
BUILDING 08 - PROPOSED FIRST FLOOR 18125_C645_B08_P_01_001_B05 Dec 2022
BUILDING 08 - PROPOSED GROUND FLOOR PLAN 18125_C645_B08_P_00_001_F05 Dec 2022
BUILDING 08 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B08_P_07_001_F05 Dec 2022
BUILDING 08 - PROPOSED SIXTH FLOOR PLAN. 18125_C645_B08_P_06_001_B05 Dec 2022
BUILDING 08 - PROPOSED SOUTH ELEVATION 18125_C645_B08_E_S_001_F05 Dec 2022
BUILDING 08 - PROPOSED TYPICAL FLOOR 1 (SECOND TO FIFTH LEVELS) 18125_C645_B08_P_TY1_001_F05 Dec 2022
BUILDING 08 - PROPOSED WEST ELEVATION 1 18125_C645_B08_E_W_001_F05 Dec 2022
BUILDING 10 - PROPOSED EAST ELEVATION 18125_C645_B10_E_E_001_F05 Dec 2022
BUILDING 10 - PROPOSED GROUND FLOOR PLAN 18125_C645_B10_P_00_001_F05 Dec 2022
BUILDING 10 - PROPOSED NORTH ELEVATION 18125_C645_B10_E_N_001_F05 Dec 2022
BUILDING 10 - PROPOSED SOUTH ELEVATION 18125_C645_B10_E_S_001_F05 Dec 2022
BUILDING 10 - PROPOSED WEST ELEVATION 18125_C645_B10_E_W_001_F05 Dec 2022
BUILDING 11 - ACCESSIBLE UNIT APARTMENT 11.G.1 18125_C645_B11_P_00_002_E05 Dec 2022
BUILDING 11 - ACCESSIBLE UNIT APARTMENT 11.G.2 18125_C645_B11_P_00_003_E05 Dec 2022
BUILDING 11 - PROPOSED EAST ELEVATION 18125_C645_B11_E_E_001_F05 Dec 2022
BUILDING 11 - PROPOSED GROUND FLOOR PLAN 18125_C645_B11_P_00_001_F05 Dec 2022
BUILDING 11 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B11_P_07_001_F05 Dec 2022
BUILDING 11 - PROPOSED TYPICAL FLOOR 1 (SECOND TO FIFTH LEVELS) 18125_C645_B11_P_TY1_001_F05 Dec 2022
BUILDING 11 - PROPOSED TYPICAL FLOOR 2 (FIRST AND SIXTH LEVELS) 18125_C645_B11_P_TY2_001_F05 Dec 2022
BUILDING 11 - PROPOSED WEST ELEVATION 18125_C645_B11_E_W_001_F05 Dec 2022
BUILDING 12 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B12_P_00_004_E05 Dec 2022
BUILDING 12 - PROPOSED EAST ELEVATION 18125_C645_B12_E_E_001_F05 Dec 2022
BUILDING 12 - PROPOSED GROUND FLOOR PLAN. 18125_C645_B12_P_00_001_F05 Dec 2022
BUILDING 12 - PROPOSED NORTH ELEVATION 2 18125_C645_B12_E_N_002_F05 Dec 2022
BUILDING 12 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B12_P_07_001_F05 Dec 2022
BUILDING 12 - PROPOSED SIXTH FLOOR PLAN 18125_C645_B12_P_06_001_F05 Dec 2022
BUILDING 12 - PROPOSED TYPICAL FLOOR PLAN (FIRST TO FIFTH LEVELS) 18125_C645_B12_P_TY_001_F05 Dec 2022
CINEMA BAY STUDY ELEVATION 18125_C645_Z1_E_01_008_F05 Dec 2022
DEVELOPMENT AREA 1 FLOOD DEFENCE PLAN P10736-00-004-GIL-0116 P0105 Dec 2022
DEVELOPMENT AREA 1 LANDSCAPE GA PLAN P10736-00-004-GIL-0103 P0105 Dec 2022
DEVELOPMENT AREA 1 LANDSCAPE RENDERED MASTERPLAN P10736-00-004-GIL-0102 P0105 Dec 2022
FULL SITE - PLANNING LIGHTING ARRANGEMENT SUPERSEDED05 Dec 2022
HIGH STREET ZONE SKETCH  05 Dec 2022
HIGH STREET ZONE SKETCH-BUBBLE.  05 Dec 2022
P10736-00-004-GIL ISSUE-SHEET PLANNING ADDENDUM  05 Dec 2022
PHOTOMETRIC LUX CONTOUR PLAN SUPERSEDED05 Dec 2022
PROPOSED DEVELOPMENT AREA 01 BASEMENT PLAN 18125_C645_Z1_P_B1_001_F05 Dec 2022
PROPOSED DEVELOPMENT AREA 01 GROUND LEVEL PLAN 18125_C645_Z1_P_00_001_E05 Dec 2022
PROPOSED DEVELOPMENT AREA 01 TYPICAL LEVEL PLAN 18125_C645_Z1_P_TY_001_E05 Dec 2022
PROPOSED DEVELOPMENT AREA 02 BASEMENT PLAN 18125_C645_Z2_P_B1_001_F05 Dec 2022
PROPOSED DEVELOPMENT AREA 02 GROUND LEVEL PLAN 18125_C645_Z2_P_00_001_E05 Dec 2022
PROPOSED DEVELOPMENT AREA 02 GROUND LEVEL PLAN 18125_C645_Z2_P_00_002_E05 Dec 2022
PROPOSED DEVELOPMENT AREA 2 TYPICAL LEVEL PLAN 18125_C645_Z2_P_TY_001_E05 Dec 2022
PROPOSED MASTERPLAN FIFTH FLOOR LEVEL - OBSCURE GLAZING EXERCISE 18125_SQP-ZZ-SK-028_B05 Dec 2022
PROPOSED MASTERPLAN GROUND FLOOR LEVEL 18125_C645_MP_P_00_001_F05 Dec 2022
PROPOSED MASTERPLAN SIXTH FLOOR LEVEL - OBSCURE GLAZING EXERCISE. 18125_SQP-ZZ-SK-030_B05 Dec 2022
PROPOSED MASTERPLAN TYPICAL FLOOR LEVEL 18125_C645_MP_P_TY_001_F05 Dec 2022
PROPOSED RIVER TERRACE BOUNDARY WALL TREATMENT PLAN P10736-00-004-GIL-0106 P0105 Dec 2022
PROPOSED SITE ELEVATION AA 18125_C645_Z1_E_AA_001_F05 Dec 2022
PROPOSED SITE ELEVATION BB 18125_C645_Z1_E_BB_001_F05 Dec 2022
PROPOSED SITE ELEVATION FF 18125_C645_Z1_E_FF_001_F05 Dec 2022
PROPOSED SITE ELEVATION HH 18125_C645_Z1_E_HH_001_F05 Dec 2022
PROPOSED SITE ELEVATION II. 18125_C645_Z1_E_II_001_F05 Dec 2022
PROPOSED SITE ELEVATION RR 18125_C645_Z2_E_RR_001_F05 Dec 2022
PROPOSED SITE SECTION AA 18125_C645_Z1_S_AA_001_F05 Dec 2022
PROPOSED SITE SECTION EE 18125_C645_Z2_S_EE_001_F05 Dec 2022
PROPOSED SITE WIDE HARD LANDSCAPE PLAN P10736-00-004-GIL-0140 P0105 Dec 2022
PROPOSED SITE WIDE LANDSCAPE GA PLAN P10736-00-004-GIL-0101 P0105 Dec 2022
PROPOSED SITE WIDE LANDSCAPE RENDERED MASTERPLAN P10736-00-004-GIL-0100 P0105 Dec 2022
PROPOSED DEVELOPMENT AREA 2 TYPICAL LEVEL PLAN C645_Z2_P_TY_002-E13 Dec 2022
FIFTH FLOOR LEVEL - ASPECT EXERCISE 18125-SQP-ZZ-SK-05905 Jul 2023
FIRST FLOOR LEVEL - ASPECT EXERCISE 18125-SQP-ZZ-SK-05505 Jul 2023
FOURTH FLOOR LEVEL - ASPECT EXERCISE 18125-SQP-ZZ-SK-05805 Jul 2023
GIL ISSUE-SHEET PLANNING.  05 Jul 2023
GROUND FLOOR LEVEL - ASPECT EXERCISE 18125-SQP-ZZ-SK-05405 Jul 2023
LIGHTING PLAN SUPERSEDED05 Jul 2023
LIGHTING PLAN SUPERSEDED05 Jul 2023
LIGHTING PLAN SUPERSEDED05 Jul 2023
LIGHTING PLAN SUPERSEDED05 Jul 2023
PROPOSED DEVELOPMENT AREA 01 TYPICAL LEVEL PLAN C645_Z1_P_TY_001-F05 Jul 2023
PROPOSED DEVELOPMENT AREA 02 GROUND LEVEL PLAN C645_Z2_P_00_001-G05 Jul 2023
PROPOSED DEVELOPMENT AREA 02 GROUND LEVEL PLAN C645_Z2_P_00_002-G05 Jul 2023
PROPOSED DEVELOPMENT AREA 2 TYPICAL LEVEL PLAN C645_Z2_P_TY_001-G05 Jul 2023
PROPOSED DEVELOPMENT AREA 2 TYPICAL LEVEL PLAN C645_Z2_P_TY_002-G05 Jul 2023
PROPOSED MASTERPLAN GROUND FLOOR LEVEL C645_MP_P_00_001-H05 Jul 2023
PROPOSED MASTERPLAN TYPICAL FLOOR LEVE C645_MP_P_TY_001-H05 Jul 2023
SECOND FLOOR LEVEL - ASPECT EXERCISE 18125-SQP-ZZ-SK-05605 Jul 2023
SEVENTH FLOOR LEVEL - ASPECT EXERCISE 18125-SQP-ZZ-SK-06105 Jul 2023
THIRD FLOOR LEVEL - ASPECT EXERCISE 18125-SQP-ZZ-SK-05705 Jul 2023
PROPOSED SITE WIDE LANDSCAPE RENDERED MASTERPLAN P10736-00-004-GIL-0100 P0211 Jul 2023
SUPERSEDED  15 Nov 2023
SUPERSEDED P10736-00-004-GIL-0100 - P0315 Nov 2023