Planning application number: 22/0900/OUT

Site address

The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET (View Site Plan)

View

Status:

In Progress. Appeal Lodged on 28/02/2024

Latest: Assessment stage

Decision due: 30/04/2023

Level: Committee Decision

Make a comment Contact us

Details

Proposal

Hybrid application to include: 1. Demolition of existing buildings (except the Maltings and the façade of the Bottling Plant and former Hotel), walls, associated structures, site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site: 2. Detailed application for the works to the east side of Ship Lane which comprise: a. Alterations and extensions to existing buildings and erection of buildings varying in height from 3 to 9 storeys plus a basement of one to two storeys below ground to allow for residential apartments; flexible use floorspace for retail, financial and professional services, café/restaurant and drinking establishment uses, offices, non-residential institutions and community use and boathouse; Hotel / public house with accommodation; Cinema and Offices. b. New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works c. Provision of on-site cycle, vehicle and servicing parking at surface and basement level d. Provision of public open space, amenity and play space and landscaping e. Flood defence and towpath works f. Installation of plant and energy equipment 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise: a. The erection of a single storey basement and buildings varying in height from 3 to 8 storeys b. Residential development c. Provision of on-site cycle, vehicle and servicing parking d. Provision of public open space, amenity and play space and landscaping e. New pedestrian, vehicle and cycle accesses and internal routes, and associated highways works.

Type

Outline Application

Ward

MORTLAKE AND BARNES COMMON WARD

Applicant

Show applicant details

Agent

Anna Gargan 72 Welbeck Street London W1G 0AY

Officer

Lucy Thatcher

Site plan

View Site Plan

Progress

The case officer will be assessing the entire case in detail as well as reviewing comments submitted.

View comments
  • Application Received: 17/03/2022
  • Validated: 11/04/2022
  • Neighbour notification started: 22/01/2024
  • Neighbour notification ended: 14/01/2023

Documents and images

Public comments

DescriptionReferenceDate Published
BOAT HOUSE ACCESS TO EXISTING PUBLIC DRAW DOCK PLAN P10736-00-004-GIL-031018 Mar 2022
CYCLE CIRCULATION PARAMETER PLAN P10736-00-004-GIL-012518 Mar 2022
ENTRY PLAZA SECTION P10736-00-004-GIL-020118 Mar 2022
EXISTING SITE WIDE HARD LANDSCAPE PLAN P10736-00-004-GIL-014118 Mar 2022
GREEN LINK SECTION P10736-00-004-GIL-020018 Mar 2022
HARD & SOFT LANDSCAPE PARAMETER PLAN P10736-00-004-GIL-012018 Mar 2022
INDICATIVE PROPOSED WATERSPORTS CENTRE P10736-00-004-GIL-015018 Mar 2022
LANDSCAPE PRINCIPLES PLAN P10736-00-004-GIL-012218 Mar 2022
LOWER RICHMOND ROAD SECTION P10736-00-004-GIL-021018 Mar 2022
OPEN AND PLAY SPACE PARAMETER PLAN P10736-00-004-GIL-012318 Mar 2022
OPEN SPACE PARAMETER PLAN P10736-00-004-GIL-012118 Mar 2022
PEDESTRIAN CIRCULATION PARAMETER PLAN P10736-00-004-GIL-012618 Mar 2022
PROPOSED BOTTLEWORKS SQUARE SECTION P10736-00-004-GIL-020418 Mar 2022
PROPOSED DETAILED APPLICATION TYPICAL COURTYARD SECTION P10736-00-004-GIL-021118 Mar 2022
PROPOSED HIGHWAY LAYOUT 38262-5520-02 A18 Mar 2022
PROPOSED HIGHWAY LAYOUT CLIFFORD AVE 38262-5520-0118 Mar 2022
PROPOSED HIGHWAY LAYOUT, POSSIBLE AREAS 38262-5501-100 H18 Mar 2022
PROPOSED MALTINGS PLAZA SECTION P10736-00-004-GIL-020518 Mar 2022
PROPOSED RIVER TERRACE SECTION 1 P10736-00-004-GIL-020618 Mar 2022
PROPOSED RIVER TERRACE SECTION 2 P10736-00-004-GIL-020718 Mar 2022
PROPOSED SHIP LANE SECTION 2 P10736-00-004-GIL-020918 Mar 2022
PROPOSED SITE WIDE CIRCULATION PLAN-CYCLE P10736-00-004-GIL-010818 Mar 2022
PROPOSED SITE WIDE: LANDSCAPE LEVEL PLAN P10736-00-004-GIL-010518 Mar 2022
RAIN GARDEN TYPICAL DETAIL P10736-00-004-GIL-030018 Mar 2022
RAIN GARDEN WITH TREE PIT TYPICAL DETAIL P10736-00-004-GIL-030118 Mar 2022
RESIDENTIAL STREET SECTION P10736-00-004-GIL-020318 Mar 2022
RIVERWALL ELEVATION FROM TOWPATH P10736-00-004-GIL-022018 Mar 2022
SCHOOL ACCESS ROAD, TEMPORARY ACCESS ROAD 38262-5501-108 G18 Mar 2022
THAMES STREET SECTION P10736-00-004-GIL-020218 Mar 2022
TYPICAL RESIDENTIAL STREET TREE PIT OVER BASEMENT CAR PARK DETAIL P10736-00-004-GIL-030218 Mar 2022
TYPICAL TREE AND PLANTING IN GREEN LINK DETAIL P10736-00-004-GIL-030318 Mar 2022
VEHICULAR CIRCULATION PARAMETER PLAN P10736-00-004-GIL-012418 Mar 2022
- FORMER BOTTLING AND HOTEL BUILDINGS - EXISTING SOUTH ELEVATION 16019_JA12_B5_E_S_001_A21 Mar 2022
- FORMER MALTINGS BUILDING - EXISTING SOUTH ELEVATION 16019_JA12_B4_E_S_00121 Mar 2022
APPLICATION A - CONDITIONS PLOT PLAN (BASEMENT WORKS ONLY)_COMPRESSED 18125_C645_MP_P_00_006_A -21 Mar 2022
APPLICATION A - CONDITIONS PLOT PLAN_COMPRESSED 18125_C645_MP_P_00_005_A -21 Mar 2022
APPLICATION A BLOCK PLAN 18125_C645_Z0_P_00_002_A -21 Mar 2022
APPLICATION A RED LINE SITE LOCATION PLAN 16019_JA12_Z0_P_00_005 -21 Mar 2022
APPLICATION B BLOCK PLAN 18125_C645_Z0_P_00_003_A -21 Mar 2022
APPLICATION B RED LINE SITE LOCATION PLAN 16019_JA12_Z0_P_00_006 -21 Mar 2022
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION EIGHT STOREYS 18125_C645_Z2_P_PR_013_E -21 Mar 2022
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION FIVE STOREYS 18125_C645_Z2_P_PR_003_E -21 Mar 2022
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION FOUR STOREYS 18125_C645_Z2_P_PR_002_E -21 Mar 2022
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION ONE TO THREE STOREYS 18125_C645_Z2_P_PR_001_E -21 Mar 2022
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION SEVEN STOREYS 18125_C645_Z2_P_PR_005_E -21 Mar 2022
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION SIX STOREYS 18125_C645_Z2_P_PR_004_E -21 Mar 2022
BLUILDING 09 - PROPOSED ROOF PLAN 18125_C645_B09_P_RF_001_E -21 Mar 2022
BOTTLING AND FORMER HOTEL BUILDING BAY STUDY - EXISTING FACADE 18125_C645_Z1_E_01_007_D -21 Mar 2022
BOTTLING AND HOTEL BUILDING BAY STUDY - EXISTING FACADE OFFICE 18125_C645_Z1_E_01_005_D -21 Mar 2022
BOTTLING BUILDING BAY STUDY - NEW FACADE 18125_C645_Z1_E_01_006_D -21 Mar 2022
BUILDING 02 - PROPOSED ACCESSIBLE UNIT - APARTMENT 2.G.2 18125_C645_B02_P_00_002_D -21 Mar 2022
BUILDING 02 - PROPOSED ACCESSIBLE UNIT - APARTMENT 2.G.3 18125_C645_B02_P_00_003_D -21 Mar 2022
BUILDING 02 - PROPOSED ACCESSIBLE UNIT - APARTMENT 2.G.5 18125_C645_B02_P_00_007_- -21 Mar 2022
BUILDING 02 - PROPOSED ACCESSIBLE UNIT - APARTMENT 2.G.6 18125_C645_B02_P_00_005_D -21 Mar 2022
BUILDING 02 - PROPOSED ACCESSIBLE UNIT - APARTMENT 2.G.7 18125_C645_B02_P_00_006_D -21 Mar 2022
BUILDING 02 - PROPOSED NORTH ELEVATION 1 18125_C645_B02_E_N_001_E -21 Mar 2022
BUILDING 02 - PROPOSED WEST ELEVATION 1 18125_C645_B02_E_W_001_E -21 Mar 2022
BUILDING 02 - PROPOSED WEST ELEVATION 2 18125_C645_B02_E_W_002_E -21 Mar 2022
BUILDING 03 - ACCESSIBLE UNIT - APARTMENT 3.5.4 18125_C645_B03_P_05_002_D -21 Mar 2022
BUILDING 03 - ACCESSIBLE UNIT - APARTMENT 3.G.1 18125_C645_B03_P_00_002_D -21 Mar 2022
BUILDING 03 - ACCESSIBLE UNIT - APARTMENT 3.G.3 18125_C645_B03_P_00_003_D -21 Mar 2022
BUILDING 03 - ACCESSIBLE UNIT - APARTMENT 3.TY.4 18125_C645_B03_P_TY_002_D21 Mar 2022
BUILDING 03 - PROPOSED FIFTH FLOOR PLAN 18125_C645_B03_P_05_001_E -21 Mar 2022
BUILDING 03 - PROPOSED FOURTH FLOOR PLAN 18125_C645_B03_P_04_001_A -21 Mar 2022
BUILDING 03 - PROPOSED ROOF PLAN 18125_C645_B03_P_RF_001_E -21 Mar 2022
BUILDING 03 - PROPOSED SOUTH ELEVATION 18125_C645_B03_E_S_001_E21 Mar 2022
BUILDING 03 - PROPOSED TYPICAL FLOOR (FIRST TO THIRD LEVELS) 18125_C645_B03_P_TY_001_E -21 Mar 2022
BUILDING 04 - ACCESSIBLE UNIT APARTMENT 4.5.3 18125_C645_B04_P_05_003_D -21 Mar 2022
BUILDING 04 - ACCESSIBLE UNIT APARTMENT 4.5.2 18125_C645_B04_P_05_002_D -21 Mar 2022
BUILDING 04 - ACCESSIBLE UNIT - APARTMENT 4.1.2 18125_C645_B04_P_01_002_D -21 Mar 2022
BUILDING 04 - ACCESSIBLE UNIT - APARTMENT 4.1.3 18125_C645_B04_P_01_003_D -21 Mar 2022
BUILDING 04 - ACCESSIBLE UNIT - APARTMENT 4.2.2 18125_C645_B04_P_02_002_D -21 Mar 2022
BUILDING 04 - ACCESSIBLE UNIT - APARTMENT 4.2.3 18125_C645_B04_P_02_003_D -21 Mar 2022
BUILDING 04 - PROPOSED FOURTH FLOOR PLAN 18125_C645_B04_P_04_001_E -21 Mar 2022
BUILDING 04 - PROPOSED ROOF LEVEL 18125_C645_B04_P_RF_001_E -21 Mar 2022
BUILDING 04 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B04_P_07_001_E -21 Mar 2022
BUILDING 04 - PROPOSED SIXTH FLOOR PLAN 18125_C645_B04_P_06_001_E -21 Mar 2022
BUILDING 05 - PROPOSED BOTTLEWORKS ELEVATIONS - NORTH, EAST & WEST 18125_C645_B05_E_H_001_F -21 Mar 2022
BUILDING 05 - PROPOSED EAST & NORTH ELEVATIONS 18125_C645_B05_E_Z_001_F -21 Mar 2022
BUILDING 05 - PROPOSED FIRST FLOOR PLAN 18125_C645_B05_P_01_001_E -21 Mar 2022
BUILDING 05 - PROPOSED GROUND FLOOR PLAN 18125_C645_B05_P_00_001_F -21 Mar 2022
BUILDING 05 - PROPOSED LOWER GROUND FLOOR PLAN 18125_C645_B05_P_LG_001_F -21 Mar 2022
BUILDING 05 - PROPOSED NORTH & WEST ELEVATIONS 18125_C645_B05_E_Z_002_F -21 Mar 2022
BUILDING 05 - PROPOSED ROOF PLAN 18125_C645_B05_P_RF_001_E -21 Mar 2022
BUILDING 05 - PROPOSED SECOND FLOOR PLAN 18125_C645_B05_P_02_001_E -21 Mar 2022
BUILDING 05 - PROPOSED SOUTH ELEVATION 18125_C645_B05_E_S_001_F -21 Mar 2022
BUILDING 06 - ACCESSIBLE UNIT - APARTMENT 6.TY.5 18125_C645_B06_P_TY_002_D -21 Mar 2022
BUILDING 06 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B06_P_00_002_D -21 Mar 2022
BUILDING 06 - PROPOSED EAST ELEVATION 18125_C645_B06_E_E_001_E -21 Mar 2022
BUILDING 06 - PROPOSED FOURTH FLOOR PLAN 18125_C645_B06_P_04_001_E -21 Mar 2022
BUILDING 06 - PROPOSED GROUND FLOOR PLAN 18125_C645_B06_P_00_001_E -21 Mar 2022
BUILDING 06 - PROPOSED NORTH ELEVATION 18125_C645_B06_E_N_001_E -21 Mar 2022
BUILDING 06 - PROPOSED ROOF PLAN 18125_C645_B06_P_RF_001_E -21 Mar 2022
BUILDING 06 - PROPOSED SOUTH ELEVATION 01 18125_C645_B06_E_S_001_E -21 Mar 2022
BUILDING 06 - PROPOSED SOUTH ELEVATION 02 18125_C645_B06_E_S_002_E -21 Mar 2022
BUILDING 06 - PROPOSED TYPICAL FLOOR (FIRST TO THIRD LEVELS) 18125_C645_B06_P_TY_001_E21 Mar 2022
BUILDING 06 - PROPOSED WEST ELEVATION 18125_C645_B06_E_W_001_E -21 Mar 2022
BUILDING 07 - ACCESSIBLE UNIT - APARTMENT 7.G.1 18125_C645_B07_P_00_002_D -21 Mar 2022
BUILDING 07 - ACCESSIBLE UNIT - APARTMENT 7.G.2 18125_C645_B07_P_00_003_D -21 Mar 2022
BUILDING 07 - PROPOSED NORTH ELEVATION 18125_C645_B07_E_N_001_E -21 Mar 2022
BUILDING 07 - PROPOSED SOUTH ELEVATION 18125_C645_B07_E_S_001_E -21 Mar 2022
BUILDING 08 - ACCESSIBLE UNIT - APARTMENT 8.TY1.5 18125_C645_B08_P_TY1_003_D -21 Mar 2022
BUILDING 08 - ACCESSIBLE UNIT APARTMENT 8.G.3 18125_C645_B08_P_00_003_D -21 Mar 2022
BUILDING 08 - PROPOSED GROUND FLOOR PLAN 18125_C645_B08_P_00_001_E -21 Mar 2022
BUILDING 08 - PROPOSED NORTH ELEVATION 18125_C645_B08_E_N_001_E -21 Mar 2022
BUILDING 09 - ACCESSIBLE UNIT APARTMENT 9.TY.1 18125_C645_B09_P_TY_002_D -21 Mar 2022
BUILDING 09 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B09_P_00_002_D -21 Mar 2022
BUILDING 09 - PROPOSED TYPICAL FLOOR PLAN (FIRST TO THIRD LEVELS) 18125_C645_B09_P_TY_001_E -21 Mar 2022
BUILDING 09 - PROPOSED EAST ELEVATION 18125_C645_B09_E_E_001_E -21 Mar 2022
BUILDING 09 - PROPOSED FOURTH FLOOR PLAN 18125_C645_B09_P_04_001_E -21 Mar 2022
BUILDING 09 - PROPOSED GROUND FLOOR PLAN 18125_C645_B09_P_00_001_E -21 Mar 2022
BUILDING 09 - PROPOSED NORTH ELEVATION 18125_C645_B09_E_N_001_E -21 Mar 2022
BUILDING 09 - PROPOSED SOUTH ELEVATION 18125_C645_B09_E_S_001_E -21 Mar 2022
BUILDING 09 - PROPOSED WEST ELEVATION 18125_C645_B09_E_W_001_E -21 Mar 2022
BUILDING 10 - GROUND FLOOR LEVEL REFUSE STORE PLAN 18125_C645_B10_P_00_003_D -21 Mar 2022
BUILDING 10 - PROPOSED ROOF PLAN 18125_C645_B10_P_RF_001_E -21 Mar 2022
BUILDING 10 - PROPOSED SIXTH FLOOR PLAN 18125_C645_B10_P_06_001_A -21 Mar 2022
BUILDING 10 - PROPOSED TYPICAL FLOOR PLAN (FIRST TO FIFTH LEVELS) 18125_C645_B10_P_TY_001_E -21 Mar 2022
BUILDING 11 - PROPOSED NORTH ELEVATION 18125_C645_B11_E_N_001_E -21 Mar 2022
BUILDING 11 - PROPOSED SEVENTH FLOOR PLAN 18125_C645_B11_P_07_001_E -21 Mar 2022
BUILDING 11 - PROPOSED SOUTH ELEVATION 18125_C645_B11_E_S_001_E -21 Mar 2022
BUILDING 12 - ACCESSIBLE UNIT APARTMENT 12.G.2 18125_C645_B12_P_00_003_D -21 Mar 2022
BUILDING 12 - ACCESSIBLE UNIT APARTMENT 12.G.1 18125_C645_B12_P_00_002_D -21 Mar 2022
BUILDING 12 - PROPOSED NORTH ELEVATION 1 18125_C645_B12_E_N_001_E -21 Mar 2022
BUILDING 12 - PROPOSED SOUTH ELEVATION 18125_C645_B12_E_S_002_E -21 Mar 2022
DEMOLITION AND RETENTION PLAN 18125_C645_Z2_P_PR_011_E -21 Mar 2022
DEMOLITION PLAN - DEVELOPMENT AREA 1 16019_JA12_Z1_P_00_001_B -21 Mar 2022
DEMOLITION PLAN - DEVELOPMENT AREA 2 16019_JA12_Z2_P_00_001 -21 Mar 2022
DEMOLITION PLAN - ENTIRE SITE 16019_JA12_Z0_P_00_002 -21 Mar 2022
DEVELOPMENT AREA 1 AND DEVELOPMENT AREA 2 BOUNDARIES 16019_JA12_Z0_P_00_008 -21 Mar 2022
EXISTING SITE ELEVATION AA 16019_JA12_Z1_E_AA_001 -21 Mar 2022
EXISTING SITE ELEVATION FF 16019_JA12_Z1_E_FF_001 -21 Mar 2022
EXISTING SITE ELEVATION NN 16019_JA12_Z2_E_NN_001 -21 Mar 2022
EXISTING SITE PLAN 16019_JA12_Z0_P_00_001 -21 Mar 2022
EXISTING SITE SURVEY 18125_JA12_Z0_P_00_009 -21 Mar 2022
FORMER BOTTLING & HOTEL BUILDINGS EXISTING SOUTH ELEVATION DEMOLITION 16019_JA12_B5_E_S_002_A -21 Mar 2022
FORMER BOTTLING AND HOTEL BUILDING - EXISTING WEST ELEVATION 16019_JA12_B5_E_W_001_A -21 Mar 2022
FORMER BOTTLING AND HOTEL BUILDINGS - EXISTING NORTH & EAST ELEVATION (2) DEMOLITION 16019_JA12_B5_E_ZZ_004_A -21 Mar 2022
FORMER BOTTLING AND HOTEL BUILDINGS - EXISTING NORTH & EAST ELEVATION 1 16019_JA12_B5_E_ZZ_001 -21 Mar 2022
FORMER BOTTLING AND HOTEL BUILDINGS - EXISTING NORTH & EAST ELEVATION 2 16019_JA12_B5_E_ZZ_002 -21 Mar 2022
FORMER BOTTLING AND HOTEL BUILDINGS - EXISTING NORTH & EAST ELEVATION DEMOLITION 1 16019_JA12_B5_E_ZZ_003 -21 Mar 2022
FORMER BOTTLING AND HOTEL BUILDINGS - EXISTING WEST ELEVATION DEMOLITION 16019_JA12_B5_E_W_002 -21 Mar 2022
FORMER MALTINGS BUILDING - EXISTING EAST ELEVATION 16019_JA12_B4_E_E_001 -21 Mar 2022
FORMER MALTINGS BUILDING - EXISTING EAST ELEVATION DEMOLITION 16019_JA12_B4_E_E_002_A21 Mar 2022
FORMER MALTINGS BUILDING - EXISTING NORTH ELEVATION 16019_JA12_B4_E_N_001 -21 Mar 2022
FORMER MALTINGS BUILDING - EXISTING NORTH ELEVATION DEMOLITION 16019_JA12_B4_E_N_002_A -21 Mar 2022
FORMER MALTINGS BUILDING - EXISTING SOUTH ELEVATION DEMOLITION 16019_JA12_B4_E_S_002_B -21 Mar 2022
FORMER MALTINGS BUILDING - EXISTING WEST ELEVATION 16019_JA12_B4_E_W_001 -21 Mar 2022
FORMER MALTINGS BUILDING - EXISTING WEST ELEVATION DEMOLITION 16019_JA12_B4_E_W_002_A -21 Mar 2022
MANSION TYPOLOGY BAY STUDY ELEVATION - DOUBLE GABLE 18125_C645_Z1_E_01_001_D -21 Mar 2022
MANSION TYPOLOGY BAY STUDY ELEVATION - SINGLE GABLE 18125_C645_Z1_E_01_003_D -21 Mar 2022
PROPOSED ACTIVE FRONTAGES - GROUND FLOOR 18125_C645_Z2_P_PR_012_E -21 Mar 2022
PROPOSED BASEMENT MAXIMUM DEPTH AND EXTENT 18125_C645_Z2_P_PR_010_E -21 Mar 2022
PROPOSED BLOCK HEIGHTS AND VERTICAL LINES OF DEVIATION 18125_C645_Z2_P_PR_006_E -21 Mar 2022
PROPOSED BUILDING LEVELS - GROUND FLOOR 18125_C645_Z2_P_PR_007_E -21 Mar 2022
PROPOSED DEVELOPMENT AREA 01 BASEMENT SECTION AA 18125_C645_Z1_S_B1_001_C -21 Mar 2022
PROPOSED DEVELOPMENT AREA 01 BASEMENT SECTION BB 18125_C645_Z1_S_B1_002_C -21 Mar 2022
PROPOSED DEVELOPMENT AREA 02 BASEMENT SECTION CC 18125_C645_Z2_S_B1_001_C -21 Mar 2022
PROPOSED LAND USE DISTRIBUTION - GROUND AND UPPER FLOORS 18125_C645_Z2_P_PR_008_E -21 Mar 2022
PROPOSED MANSION TYPOLOGY BAY STUDY ELEVATION - SINGLE BAY 18125_C645_Z1_E_01_002_D21 Mar 2022
PROPOSED MASTERPLAN EIGHTH FLOOR LEVEL - OBSCURE GLAZING EXERCISE_COMPRESSED 18125_SQP-ZZ-SK-034_A -21 Mar 2022
PROPOSED SECOND FLOOR PLAN 18125_C645_B04_P_02_001_E - BUILDING 04 -21 Mar 2022
PROPOSED SITE ELEVATION CC 18125_C645_Z1_E_CC_001_D -21 Mar 2022
PROPOSED SITE ELEVATION JJ 18125_C645_Z2_E_JJ_001_D -21 Mar 2022
PROPOSED SITE ELEVATION KK 18125_C645_Z2_E_KK_001_D -21 Mar 2022
PROPOSED SITE ELEVATION LL 18125_C645_Z2_E_LL_001_D -21 Mar 2022
PROPOSED SITE ELEVATION MM 18125_C645_Z2_E_MM_001_D -21 Mar 2022
PROPOSED SITE ELEVATION NN 18125_C645_Z2_E_NN_001_D -21 Mar 2022
PROPOSED SITE ELEVATION OO 18125_C645_Z2_E_OO_001_D -21 Mar 2022
PROPOSED SITE ELEVATION PP 18125_C645_Z2_E_PP_001_D -21 Mar 2022
PROPOSED SITE ELEVATION QQ 18125_C645_Z2_E_QQ_001_D -21 Mar 2022
PROPOSED SITE SECTION CC 18125_C645_Z1_S_CC_001_D -21 Mar 2022
PROPOSED SITE SECTION DD 18125_C645_Z2_S_DD_001_D -21 Mar 2022
PROPOSED SITE SECTION FF 18125_C645_Z2_S_FF_001_D -21 Mar 2022
PROPOSED WAREHOUSE TYPOLOGY BAY STUDY 18125_C645_Z1_E_01_009_D -21 Mar 2022
RED LINE SITE LOCATION AND OWNERSHIP PLAN 18125_JA12_Z0_P_00_004_-21 Mar 2022
RED LINE SITE LOCATION PLAN_COMPRESSED (1) 18125_JA12_Z0_P_00_003_-21 Mar 2022
SITE APPLICATION BOUNDARIES APPLICATION A & B 18125_C645_Z0_P_00_001_B -21 Mar 2022
typical extensive brown roof detail P10736-00-004-GIL-040008 Apr 2022
typical extensive green roof detail P10736-00-004-GIL-040108 Apr 2022
proposed Ship Lane - section 1 P10736-00-004-GIL-020829 Apr 2022
Site Wide Soft Landscape GA Plan P107-00-004-GIL-0904 P0125 Jan 2024