Planning application number: 22/0902/FUL

Site address

The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET (View Site Plan)

View

Status:

In Progress. Appeal Lodged on 28/02/2024

Latest: Assessment stage

Decision due: 30/04/2023

Make a comment Contact us

Details

Proposal

Erection of a three-storey building to provide a new secondary school with sixth form; sports pitch with floodlighting, external MUGA and play space; and associated external works including landscaping, car and cycle parking, new access routes and other associated works

Type

Full Application

Ward

MORTLAKE AND BARNES COMMON WARD

Applicant

Show applicant details

Agent

Anna Gargan 72 Welbeck Street London W1G 0AY

Officer

Lucy Thatcher

Site plan

View Site Plan

Progress

The case officer will be assessing the entire case in detail as well as reviewing comments submitted.

View comments
  • Application Received: 17/03/2022
  • Validated: 11/04/2022
  • Neighbour notification started: 14/04/2022
  • Neighbour notification ended: 14/01/2023

Documents and images

Public comments

DescriptionReferenceDate Published
Statement of Case  02 Mar 2024
(1) APPLICATION B RED LINE SITE LOCATION PLAN  07 Mar 2024
(100a) Appendix F - SAP Be Green  07 Mar 2024
(101a) Appendix F - SAP Be Green  07 Mar 2024
(102a) Appendix F - SAP Be Green  07 Mar 2024
(103a) Appendix F - SAP Be Green  07 Mar 2024
(104a) Appendix F - SAP Be Green  07 Mar 2024
(105a) Appendix F - SAP Be Green  07 Mar 2024
(106a) Appendix F - SAP Be Green  07 Mar 2024
(107a) Appendix F - SAP Be Green  07 Mar 2024
(108a) Appendix F - SAP Be Green  07 Mar 2024
(109a) Appendix F - SAP Be Green  07 Mar 2024
(110a) Appendix F - SAP Be Green  07 Mar 2024
(111a) Appendix F - SAP Be Green  07 Mar 2024
(112a) Appendix F - SAP Be Green  07 Mar 2024
(113a) Appendix F - SAP Be Green  07 Mar 2024
(114a) Appendix F - SAP Be Green  07 Mar 2024
(115a) Appendix F - SAP Be Green  07 Mar 2024
(116a) Appendix F - SAP Be Lean  07 Mar 2024
(117a) Appendix F - SAP Be Lean  07 Mar 2024
(118a) Appendix F - SAP Be Lean  07 Mar 2024
(119a) Appendix F - SAP Be Lean  07 Mar 2024
(120a) Appendix F - SAP Be Lean  07 Mar 2024
(121a) Appendix F - SAP Be Lean  07 Mar 2024
(122a) Appendix F - SAP Be Lean  07 Mar 2024
(123a) Appendix F - SAP Be Lean  07 Mar 2024
(124a) Appendix F - SAP Be Lean  07 Mar 2024
(125a) Appendix F - SAP Be Lean  07 Mar 2024
(126a) Appendix F - SAP Be Lean  07 Mar 2024
(127a) Appendix F - SAP Be Lean  07 Mar 2024
(128a) Appendix F - SAP Be Lean  07 Mar 2024
(129a) Appendix F - SAP Be Lean  07 Mar 2024
(130a) Appendix F - SAP Be Lean  07 Mar 2024
(131a) Appendix F - SAP Be Lean  07 Mar 2024
(132) ES Letter of Conformity  07 Mar 2024
(132a) ES Letter of Conformity  07 Mar 2024
(146a) ES Chapter 13  07 Mar 2024
(149a) MASTERPLAN APPLICATIONS A & B- TREE PROTECTION PLAN  07 Mar 2024
(156a) Replacement ES Figures 13.1-13.10 Part 1&2  07 Mar 2024
(157a) Replacement ES Figures 13.1-13.10 Part 1&2  07 Mar 2024
(158a) ES Figures Part 3  07 Mar 2024
(205a) Appendix 12.5 Part 1&2  07 Mar 2024
(206a) Appendix 12.5 Part 1&2  07 Mar 2024
(207a) ES Appendix 13.1  07 Mar 2024
(208a) ES Appendix 13.2  07 Mar 2024
(209) ES Appendix 13.3 Supplementary Protected Species Report Part 1&2  07 Mar 2024
(209) ES Appendix 13.3 Supplementary Protected Species Report Part 1&2  07 Mar 2024
(209) ES Appendix 13.3 Supplementary Protected Species Report Part 1&2  07 Mar 2024
(210a) ES Appendix 13.4 WFD Screening  07 Mar 2024
(211a) ES Appendix 13.5 BNG  07 Mar 2024
(227a) Fire Statement  07 Mar 2024
(227b) Fire Statement  07 Mar 2024
(228a) FVA Addendum  07 Mar 2024
(232a) Gateway 1 Statement  07 Mar 2024
(232b) Gateway 1 Statement  07 Mar 2024
(233a) HIA Statement of Conformity  07 Mar 2024
(234a) Internal Daylight and Sunlight Addendum  07 Mar 2024
(237a) Landscape DAS Addendum  07 Mar 2024
(245a) OWMP  07 Mar 2024
(245b) Operational Waste Management Plan  07 Mar 2024
(245c) OWMP  07 Mar 2024
(250a) Outline Car Park Management Plan  07 Mar 2024
(251) Interim QDR Report  07 Mar 2024
(252a) Town Planning Statement Part 1  07 Mar 2024
(253a) Town Planning Statement Part 2  07 Mar 2024
(254) Facts and Figures  07 Mar 2024
(256) School Overheating Assessment  07 Mar 2024
(256a) School Overheating Assessment  07 Mar 2024
(260a) Sports Pitch Lighting Assessment  07 Mar 2024
(265a(i)) Appendix A- Sheen Lane Level Crossing Assessment  07 Mar 2024
(265a) Transport Assessment Addendum  07 Mar 2024
(272) Traffic Data Comparison  07 Mar 2024
(273a) Arboricultural Impact Assessment  07 Mar 2024
(274a) Arboricultural Impact Assessment  07 Mar 2024
(276a(i)) WLC  07 Mar 2024
(276a) Whole Life Carbon  07 Mar 2024
(279) Drainage Strategy Part 1-3  07 Mar 2024
(279a) Drainage Strategy Part 1-3  07 Mar 2024
(280) Drainage Strategy Part 1-3  07 Mar 2024
(280a) Drainage Strategy Part 1-3  07 Mar 2024
(281) Drainage Strategy Part 1-3  07 Mar 2024
(281a) Drainage Strategy Part 1-3  07 Mar 2024
(282) Drainage Strategy Appendix A-K  07 Mar 2024
(283) Drainage Strategy Appendix A-K  07 Mar 2024
(284) Drainage Strategy Appendix A-K  07 Mar 2024
(285) Drainage Strategy Appendix A-K  07 Mar 2024
(286) Drainage Strategy Appendix A-K  07 Mar 2024
(287) Drainage Strategy Appendix A-K  07 Mar 2024
(288) Drainage Strategy Appendix A-K  07 Mar 2024
(289) Drainage Strategy Appendix A-K  07 Mar 2024
(290) Drainage Strategy Appendix A-K  07 Mar 2024
(291) Drainage Strategy Appendix A-K  07 Mar 2024
(292) Drainage Strategy Appendix A-K  07 Mar 2024
(293) Sustainable Construction Checklist  07 Mar 2024
(302) RHP Letter  07 Mar 2024
(303) First Homes  07 Mar 2024
(326) Application B- Hoare Lea Response to Accelar  07 Mar 2024
(327) Applicant Consultation Response Tracker  07 Mar 2024
(328) Stantec TfL Response  07 Mar 2024
(329) PREVIOUS SCHEMES COMPARISON DEVELOPMENT AREA 2  07 Mar 2024
(32a) School Proposed Ground Floor Plan  07 Mar 2024
(337) Further Drawings (337) P10736-00-003-GIL-080007 Mar 2024
(338) Lighting Drawings (338) 547-500-CA-EX-MP07 Mar 2024
(338A) Lighting Drawings  07 Mar 2024
(339) Lighting Drawings (339) 547-(001)-DR-EX-MP07 Mar 2024
(339A) Lighting Drawings  07 Mar 2024
(340) Lighting Drawings (340) 547-(002)-DR-EX-MP07 Mar 2024
(340A) Lighting Drawings  07 Mar 2024
(341) Lighting Drawings (341) 547-(005)-DR-EX-MP07 Mar 2024
(341A) Lighting Drawings  07 Mar 2024
(36a) School-Proposed Roof Plan  07 Mar 2024
(38) School- Indicative Green Wall Location  07 Mar 2024
(39a) 18125_ C645 Planning Drawing List  07 Mar 2024
(39b) Drawing Schedule  07 Mar 2024
(5) RED LINE SITE LOCATION AND OWNERSHIP PLAN (1)  07 Mar 2024
(66) Transport Drawings (66) 38262_5520_09 B07 Mar 2024
(67) Transport Drawings (67) 38262_5520_23 B07 Mar 2024
(68) Transport Drawings (68) 38262_5520_29 B07 Mar 2024
(69) Application Form  07 Mar 2024
(69a) Application Form  07 Mar 2024
(69b) Application Form  07 Mar 2024
(70) Basement Screening Assessment  07 Mar 2024
(71) Basement Screening Assessment  07 Mar 2024
(72) Basement Screening Assessment  07 Mar 2024
(73) Basement Screening Assessment  07 Mar 2024
(74) Basement Screening Assessment  07 Mar 2024
(76a) Proposed GEA  07 Mar 2024
(77a) Proposed GIA  07 Mar 2024
(78a) GLA Carbon Emissions Reporting Sheet  07 Mar 2024
(79) CAVAT Value Note  07 Mar 2024
(82a(i)) GLA Circular Economy Statement Template  07 Mar 2024
(82a(ii)) Circular Economy Statement  07 Mar 2024
(82a(iii)) GLA Circular Economy Statement Template  07 Mar 2024
(82a) Circular Economy Statement  07 Mar 2024
(82a) Circular Economy Statementpendix A-K  07 Mar 2024
(84a) Cover Letter Addendum  07 Mar 2024
(84a) Cover Letter Addendum  07 Mar 2024
(84b) Cover Letter  07 Mar 2024
(84b) Cover Letter  07 Mar 2024
(84b) Cover Letter  07 Mar 2024
(97a) Be Seen Section (Substitution)  07 Mar 2024
(97b) Energy Strategy Addendum  07 Mar 2024
(98a) Appendix F - BRUKL Be Green  07 Mar 2024
(99a) Appendix F - BRUKL Be Lean  07 Mar 2024
245ci  07 Mar 2024
245cii  07 Mar 2024
5. Landscape Drawings (45) P10736-00-004-GIL-040007 Mar 2024
5. Landscape Drawings (46) P10736-00-004-GIL-040107 Mar 2024
Applicant Cover Letter  07 Mar 2024
Contents List - Application B - 05  07 Mar 2024
Contents List - Application B - 06  07 Mar 2024
Landscape Drawings (47) P10736-00-004-GIL-0100 P0107 Mar 2024
Landscape Drawings (48) P10736-00-004-GIL-0101 P0107 Mar 2024
Landscape Drawings (49) P10736-00-004-GIL-0102 P0107 Mar 2024
Landscape Drawings (50) P10736-00-004-GIL-0103 P0107 Mar 2024
Landscape Drawings (51) P10736-00-004-GIL-010407 Mar 2024
Landscape Drawings (52) P10736-00-004-GIL-0106 P0107 Mar 2024
Landscape Drawings (53A) P10736-00-004-GIL-0107 P0207 Mar 2024
Landscape Drawings (54) P10736-00-004-GIL-0116 P0107 Mar 2024
Landscape Drawings (55) P10736-00-004-GIL-0120 P0107 Mar 2024
Landscape Drawings (56) P10736-00-004-GIL-0122 P0107 Mar 2024
Landscape Drawings (57) P10736-00-004-GIL-0123 P0107 Mar 2024
Landscape Drawings (58) P10736-00-004-GIL-0140 P0107 Mar 2024
Landscape Drawings (59) P10736-00-004-GIL-0150 P0107 Mar 2024
Landscape Drawings (60) P10736-00-004-GIL-0205 P0107 Mar 2024
Landscape Drawings (61) P10736-00-004-GIL-0208 P0107 Mar 2024
MASTER LIST OF ALL APPEAL B MATERIAL  07 Mar 2024
(294) Combined Response Document  08 Mar 2024
(295) School Land Valuation Letter  08 Mar 2024
(296) Response to Council's FVA Queries  08 Mar 2024
(297) Additional Scenarios Note  08 Mar 2024
(298) School Land Briefing Note  08 Mar 2024
(299) Building 18 Layout Note  08 Mar 2024
(300) Noise Conditions  08 Mar 2024
(301) Additional Grant Scenarios  08 Mar 2024
(304) HSE Response  08 Mar 2024
(305) Design Code Response  08 Mar 2024
(306) Townscape Briefing Note  08 Mar 2024
(307) LBRuT Consultation Responses Tracker  08 Mar 2024
(308) GLA Stage 1 Responses  08 Mar 2024
(310) Accelar Response to Application 2  08 Mar 2024
(311) Accelar Appendix (2019 Energy Responses)  08 Mar 2024
(312) Arboriculture Response  08 Mar 2024
(313) Affordable Housing Response  08 Mar 2024
(314) Air Quality Response  08 Mar 2024
(315) Flood Risk and Drainage Response  08 Mar 2024
(199a) FRA Addendum  09 Mar 2024
(245d) Operational Waste Management Plan  09 Mar 2024
(260aii) Sports Pitch Lighting Assessment (Section 02)  09 Mar 2024
(273b(i)) 18671-102-WIE-ZZ-XX-DR-L-7705  09 Mar 2024
(330) Play Space Noise Note  09 Mar 2024
(332) ES Chapter 18_Daylight, Sunlight, Overshadowing  09 Mar 2024
(1) Application & Ownership Boundary 161  11 Mar 2024
(10) FO  11 Mar 2024
(100) Be Green Calculations 1  11 Mar 2024
(101) Be Green Calculations 2  11 Mar 2024
(102) Be Green Calculations 3  11 Mar 2024
(103) Be Green Calculations 4  11 Mar 2024
(104) Be Green Calculations 5  11 Mar 2024
(105) Be Green Calculations 6  11 Mar 2024
(106) Be Green Calculations 7  11 Mar 2024
(107) Be Green Calculations 8  11 Mar 2024
(108) Be Green Calculations 9  11 Mar 2024
(109) Be Green Calculations 10  11 Mar 2024
(11) FO  11 Mar 2024
(110) Be Green Calculations 11  11 Mar 2024
(111) Be Green Calculations 12  11 Mar 2024
(112) Be Green Calculations 13  11 Mar 2024
(113) Be Green Calculations 14  11 Mar 2024
(114) Be Green Calculations 15  11 Mar 2024
(115) Be Green Calculations 16  11 Mar 2024
(116) Be Lean Calculations 1  11 Mar 2024
(117) Be Lean Calculations 2  11 Mar 2024
(118) Be Lean Calculations 3  11 Mar 2024
(119) Be Lean Calculations 4  11 Mar 2024
(12) FO  11 Mar 2024
(120) Be Lean Calculations 5  11 Mar 2024
(121) Be Lean Calculations 6  11 Mar 2024
(122) Be Lean Calculations 7  11 Mar 2024
(123) Be Lean Calculations 8  11 Mar 2024
(124) Be Lean Calculations 9  11 Mar 2024
(125) Be Lean Calculations 10  11 Mar 2024
(126) Be Lean Calculations 11  11 Mar 2024
(127) Be Lean Calculations 12  11 Mar 2024
(128) Be Lean Calculations 13  11 Mar 2024
(129) Be Lean Calculations 14  11 Mar 2024
(13) FO  11 Mar 2024
(130) Be Lean Calculations 15  11 Mar 2024
(131) Be Lean Calculations 16  11 Mar 2024
(132b) ES Statement of Conformity  11 Mar 2024
(132c) ES Statement of Conformity  11 Mar 2024
(133) ES Non Technical Summary  11 Mar 2024
(134) ES Chapter 1  11 Mar 2024
(135) ES Chapter 2  11 Mar 2024
(136) ES Chapter 3  11 Mar 2024
(137) ES Chapter 4  11 Mar 2024
(138) ES Chapter 5  11 Mar 2024
(139) ES Chapter 6  11 Mar 2024
(14) FO  11 Mar 2024
(140) ES Chapter 7  11 Mar 2024
(141) ES Chapter 8  11 Mar 2024
(142) ES Chapter 9  11 Mar 2024
(143) ES Chapter 10  11 Mar 2024
(144) ES Chapter 11  11 Mar 2024
(145) ES Chapter 12  11 Mar 2024
(146) ES Chapter 13  11 Mar 2024
(147) ES Chapter 14  11 Mar 2024
(148) ES Chapter 15  11 Mar 2024
(149) ES Chapter 16  11 Mar 2024
(15) FO  11 Mar 2024
(150) ES Chapter 17  11 Mar 2024
(151) ES Chapter 18  11 Mar 2024
(151a) ES Chapter 18, ES Appendix 18.5 and ES SoC  11 Mar 2024
(152) ES Chapter 19  11 Mar 2024
(153) ES Chapter 20  11 Mar 2024
(154) ES Chapter 21  11 Mar 2024
(155) ES Volume 1 Contents  11 Mar 2024
(156) ES Figures Part-1  11 Mar 2024
(157) ES Figures Part-2  11 Mar 2024
(158) ES Figures Part-3  11 Mar 2024
(159) ES Figures Part-4  11 Mar 2024
(16) FO  11 Mar 2024
(160) ES Figures Part-5  11 Mar 2024
(161) ES Figures Part-6  11 Mar 2024
(162) ES Figures Part-7  11 Mar 2024
(163) ES Figures Part-8  11 Mar 2024
(164) ES Appendix 1.1 EIA Competent Experts  11 Mar 2024
(165) ES Appendix 2.1 EIA Scoping Report  11 Mar 2024
(166) ES Appendix 2.2 Draft EIA scoping opinon  11 Mar 2024
(167) E  11 Mar 2024
(168) ES Appendix 2.4 Formal EIA Scoping Opinion  11 Mar 2024
(169)E  11 Mar 2024
(17) FO  11 Mar 2024
(170)E  11 Mar 2024
(171)E  11 Mar 2024
(172) ES Appendix 6.1 Phasing Plans-Part-1  11 Mar 2024
(173) ES Appendix 6.1 Phasing Plans-Part-2  11 Mar 2024
(174) ES Appendix 6.1 Phasing Plans-Part-3  11 Mar 2024
(175) ES Appendix 7.1-7.3 Socio-economics  11 Mar 2024
(176) ES Appendix 8.1 Transport AssessmentPart-1  11 Mar 2024
(177) ES Appendix 8.1 Transport AssessmentPart-2  11 Mar 2024
(178) ES Appendix 8.1 Transport AssessmentPart-3  11 Mar 2024
(179) ES Appendix 8.1 Transport AssessmentPart-4  11 Mar 2024
(18) FO  11 Mar 2024
(180) ES Appendix 8.1 Transport AssessmentPart-5  11 Mar 2024
(181) ES Appendix 8.1 Transport AssessmentPart-6  11 Mar 2024
(182) ES Appendix 8.1 Transport AssessmentPart-7  11 Mar 2024
(183) ES Appendix 9.1 Acoustic Terminology  11 Mar 2024
(184) ES Appendix 9.2 Baseline Noise Monitoring  11 Mar 2024
(185) ES  11 Mar 2024
(186) ES  11 Mar 2024
(187) ES Appendix 10.1 Air Quality Modelling  11 Mar 2024
(188) E  11 Mar 2024
(189) E  11 Mar 2024
(19) FO  11 Mar 2024
(190) ES Appendix 10.4 AQ Positive  11 Mar 2024
(190a) ES Appendix 10.4  11 Mar 2024
(191) ES Appendix 11.1-Part-1  11 Mar 2024
(192) ES Appendix 11.1-Part-2  11 Mar 2024
(193) ES Appendix 11.1-Part-3  11 Mar 2024
(194) ES Appendix 11.1 Part 4  11 Mar 2024
(195) ES Appendix 11.1 Part-5  11 Mar 2024
(196) ES Appendix 11.1 Part-6  11 Mar 2024
(197) ES Appendix 11.2 -Part-1  11 Mar 2024
(198) ES Appendix 11.2 -Part-2  11 Mar 2024
(199) ES Appendix 12.1 Flood Risk Assessment  11 Mar 2024
(199b) FRA Addendum  11 Mar 2024
(199bi) FRA Addendum- Response Document  11 Mar 2024
(2) Application & Ownership Boundary 181  11 Mar 2024
(20) FO  11 Mar 2024
(203)E  11 Mar 2024
(204) ES Appendix 12.4 Maltings Wall Assessment  11 Mar 2024
(205) ES Appendix 12.5-Part-1  11 Mar 2024
(206) ES Appendix 12.5-Part-2  11 Mar 2024
(207)E  11 Mar 2024
(208) ES Appendix 13.2 Protected Species Report  11 Mar 2024
(21) FO  11 Mar 2024
(210) ES Appendix 13.3 WFD Screening  11 Mar 2024
(211) ES Appendix 13.4 BNG  11 Mar 2024
(211ai) BNG Design Stage Assessment (Application B)  11 Mar 2024
(212) ES Appendix 14.1 Archaeological DBA  11 Mar 2024
(213)E  11 Mar 2024
(214) ES Appendix 15.1 Built Heritage Statement  11 Mar 2024
(215)E  11 Mar 2024
(216) ES Appendix 16.2 Night Time Views  11 Mar 2024
(217)E  11 Mar 2024
(218) ES Appendix 18.1-18.5 Part-1  11 Mar 2024
(219)ES Appendix 18.1-18.5-Part-2  11 Mar 2024
(22) EXISTING SITE PLAN  11 Mar 2024
(220) ES Appendix 18.1-18.5 Part-3  11 Mar 2024
(221) ES Appendix 18.1-18.5Part-4  11 Mar 2024
(222) ES Appendix 18.1-18.5Part-5  11 Mar 2024
(223) ES Appendix 18.1-18.5-Part-6  11 Mar 2024
(224) ES Appendix 18.1-18.5 -Part-7  11 Mar 2024
(225) ES Appendix 19.1-19.2 GHG Policy  11 Mar 2024
(226) #ES Volume 3 Appendices Contents  11 Mar 2024
(227) Fire Statement  11 Mar 2024
(228) Financial Viability Assessment  11 Mar 2024
(229) Foul Sewage and Utilities  11 Mar 2024
(23) DEMOLITION PLAN - ENTIRE SITE  11 Mar 2024
(230) Framework Construction Management Plan  11 Mar 2024
(231) Framework Estate Management Strategy  11 Mar 2024
(232) Gateway 1 Form  11 Mar 2024
(233) Health Impact Assessment  11 Mar 2024
(234) Internal Daylight Report  11 Mar 2024
(235) Internal Daylight Report  11 Mar 2024
(236) Internal Daylight Report  11 Mar 2024
(237) School Landscape DAS_Part1  11 Mar 2024
(238) School Landscape DAS_Part2  11 Mar 2024
(239) School Landscape DAS_Part3  11 Mar 2024
(24) EXISTING SITE ELEVATION AA  11 Mar 2024
(240) School Landscape DAS_Part4  11 Mar 2024
(241) School Landscape DAS_Part5  11 Mar 2024
(242) Lighting Masterplan  11 Mar 2024
(243) Noise Impact Assessment  11 Mar 2024
(244) Odour Assessment Report  11 Mar 2024
(245) Operational Waste Management Plan  11 Mar 2024
(245e) Operational Waste Management Plan  11 Mar 2024
(246) OSSPA_Part1  11 Mar 2024
(247) OSSPA_Part2  11 Mar 2024
(248) OSSPA_Part3  11 Mar 2024
(249) OSSPA_Part4  11 Mar 2024
(25) EXISTING SITE ELEVATION FF  11 Mar 2024
(250) Outline Car Park Management Plan  11 Mar 2024
(252) Town Planning Statement_Part1  11 Mar 2024
(253) Town Planning Statement_Part2  11 Mar 2024
(255) Residential Travel Plan  11 Mar 2024
(255) Residential Travel Plan  11 Mar 2024
(258) Site Wide Travel Plan  11 Mar 2024
(259) School Travel Plan  11 Mar 2024
(26) DEMOLITION PLAN - DEVELOPMENT AREA 1  11 Mar 2024
(260) Sports Pitch Lighting Assessment  11 Mar 2024
(260) Sports Pitch Lighting Assessment  11 Mar 2024
(260ai) Sports Pitch Lighting Assessment (Section 01)  11 Mar 2024
(260aiii) Sports Pitch Lighting Assessment Statement – Amendment Summary  11 Mar 2024
(261) Statement of Community Involvement  11 Mar 2024
(262) STATEMENT OF COMMUNITY INVOLVEMENT  11 Mar 2024
(263) Structural Impact Assessment  11 Mar 2024
(264)Sustainability Statement  11 Mar 2024
(265) Transport Assessment (Part 1)  11 Mar 2024
(265b) Transport Assessment Addendum  11 Mar 2024
(266) Transport Assessment (Part 2)  11 Mar 2024
(267) Transport Assessment (Part 3)  11 Mar 2024
(268) Transport Assessment (Part 4  11 Mar 2024
(269) Transport Assessment (Part54  11 Mar 2024
(27) EXISTING SITE ELEVATION NN  11 Mar 2024
(270) Transport Assessment (Part6)  11 Mar 2024
(271) Transport Assessment (Part7)  11 Mar 2024
(273) Arboricultural Impact Assessment  11 Mar 2024
(273b) Arboricultural Impact Assessment  11 Mar 2024
(274) Arboricultural Impact Assessment  11 Mar 2024
(275) Validation Checklist  11 Mar 2024
(278) Retail and Leisure Statement  11 Mar 2024
(279) ES Appendix 12.2 Part 1  11 Mar 2024
(279b) Drainage Strategy Part 1  11 Mar 2024
(280) ES Appendix 12.2 Part 2  11 Mar 2024
(280b) Drainage Strategy Part 2  11 Mar 2024
(281) ES Appendix 12.2 Part 3  11 Mar 2024
(281b) Drainage Strategy Part 3  11 Mar 2024
(282b) Drainage Strategy Part 4  11 Mar 2024
(3) Application & Ownership Boundary 181  11 Mar 2024
(30) School Application  11 Mar 2024
(306a) Townscape Briefing Note (incl. appendix 1)  11 Mar 2024
(31) School Application  11 Mar 2024
(310a) Accelar Response to Application 2  11 Mar 2024
(32) School Application  11 Mar 2024
(33) School Application  11 Mar 2024
(331) OWMP (highlighted)  11 Mar 2024
(333) A316 CLIFFORD AVENUE SHARED USE PATH CONSTRAINTS PLAN  11 Mar 2024
(334) Sheen Lane Level Crossing Plan  11 Mar 2024
(335) PROPOSED CLIFFORD AVENUE TOUCAN CROSSING - CONCEPT LAYOUT  11 Mar 2024
(336) Clean Water Capacity Report  11 Mar 2024
(34) School Application  11 Mar 2024
(35) School Application  11 Mar 2024
(36) School Application  11 Mar 2024
(37) School Application  11 Mar 2024
(39) Drawing Schedule- Squire's  11 Mar 2024
(39c) Planning Drawing List  11 Mar 2024
(39d) Planning Drawing List  11 Mar 2024
(39e) Planning Drawing List  11 Mar 2024
(4) Application & Ownership Boundary 181  11 Mar 2024
(5) Application & Ownership Boundary 181  11 Mar 2024
(64a) 38262-5520-01 A  11 Mar 2024
(64b) 38262-5520-36  11 Mar 2024
(69) Application Form  11 Mar 2024
(70a) Basement Screening Assessment Clarification Note  11 Mar 2024
(70i) BIA Part 1-9  11 Mar 2024
(70ii) BIA Part 1-9  11 Mar 2024
(70iii) BIA Part 1-9  11 Mar 2024
(70iv) BIA Part 1-9  11 Mar 2024
(70ix) BIA Part 1-9  11 Mar 2024
(70v) BIA Part 1-9  11 Mar 2024
(70vi) BIA Part 1-9  11 Mar 2024
(70vii) BIA Part 1-9  11 Mar 2024
(70viii) BIA Part 1-9  11 Mar 2024
(75) Existing Areas  11 Mar 2024
(76) Proposed GEA  11 Mar 2024
(76b) Proposed GEA 80-20 Split  11 Mar 2024
(77) Proposed GIA  11 Mar 2024
(77b) Proposed GIA 80-20 Split  11 Mar 2024
(78) GLA Carbon Emission Report  11 Mar 2024
(78) GLA Carbon Emission Report  11 Mar 2024
(80) CIL Form  11 Mar 2024
(81) CIL Appendix 1  11 Mar 2024
(82) Circular Economy Statement  11 Mar 2024
(82b) Circular Economy Statement  11 Mar 2024
(83) Community and Cultural Assessment  11 Mar 2024
(84) Cover Letter  11 Mar 2024
(85) School DAS Part-1  11 Mar 2024
(86) School DAS Part-2  11 Mar 2024
(87) School DAS Part-3  11 Mar 2024
(88) School DAS Part-4  11 Mar 2024
(89) School DAS Part-5  11 Mar 2024
(90) School DAS Part-6  11 Mar 2024
(91) School DAS Part-7  11 Mar 2024
(92) School DAS Part-8  11 Mar 2024
(93) Delivery and Servicing Plan  11 Mar 2024
(94) Delivery and Servicing Plan  11 Mar 2024
(95) Delivery and Servicing Plan  11 Mar 2024
(96) Employment Assessment  11 Mar 2024
(97) Energy Strategy  11 Mar 2024
(97c) Energy Strategy Addendum  11 Mar 2024
(98) School BRUKL Be Green  11 Mar 2024
(99) School_brukl- Lean  11 Mar 2024
276) Whole Life Carbon Report  11 Mar 2024
276) Whole Life Carbon Report  11 Mar 2024
277) Whole Life Carbon Report  11 Mar 2024
277) Whole Life Carbon Report  11 Mar 2024
Applicant Cover Letter  11 Mar 2024
Existing Site (28) DEMOLITION PLAN - DEVELOPMENT AREA 211 Mar 2024
Existing Site 29 EXISTING SITE SURVEY11 Mar 2024
Existing Site 611 Mar 2024
Existing Site 711 Mar 2024
Existing Site 811 Mar 2024
Existing Site 911 Mar 2024
Landscape Drawings (40)P111 Mar 2024
Landscape Drawings (41) P10736-00-004-GIL-013011 Mar 2024
Landscape Drawings (42) P10736-00-004-GIL-013111 Mar 2024
Landscape Drawings (43) P10736-00-004-GIL-013211 Mar 2024
Landscape Drawings (44) P10736-00-004-GIL-013311 Mar 2024
Landscape Drawings (53) P10736-00-004-GIL-0107-0111 Mar 2024
MASTER LIST OF ALL APPEAL B MATERIAL  11 Mar 2024
Transport Drawings (62) 38262-5501-100 H11 Mar 2024
Transport Drawings (63) 38262-5501-108 G11 Mar 2024
Transport Drawings (64) 38262-5520-0111 Mar 2024
Transport Drawings (65) 38262-5520-02 A11 Mar 2024
Filing Cover Letter  13 Mar 2024