Planning application number: 18/0548/FUL

Site address

The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET (View Site Plan)

View

Status:

Refused Permission 18/08/2021

Latest: Decision Issued

Level: Other Council

Details

Proposal

APPLICATION B: The erection of a three storey building to provide a new secondary school with sixth form; Sports pitch with floodlighting, external MUGA and play space; and associated external works including, landscaping, car and cycle parking, new access routes and associated works.

Type

Full Application

Ward

MORTLAKE, BARNES COMMON WARD - Historic From 06/05/2022

Applicant

Show applicant details

Agent

Mr Kevin Watson 72 Welbeck Street London W1G 0AY

Officer

Lucy Thatcher

Site plan

View Site Plan

Progress

A decision has been issued by the authority.

A copy of the decision notice will appear in the case file soon, and within a maximum of two weeks.
  • Application Received: 19/02/2018
  • Validated: 29/03/2018
  • Neighbour notification started: 09/04/2018
  • Neighbour notification ended: 09/05/2018
  • Decision Issued: 18/08/2021

Documents and images

DescriptionDate Published
Application Form Note 19 Feb 2018
CIL Appendix 1 19 Feb 2018
Air Quality EIA Report 05 Apr 2018
Appendix 10.1 Air Quality Modelling Study 05 Apr 2018
Appendix 10.2 Air Quality Neutral Assessment 05 Apr 2018
Appendix 10.3 Air Quality Modelling Results 05 Apr 2018
Appendix 10.4 Interim Junction Design Assessment 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 01 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 02 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 03 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 04 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 05 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 06 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 07 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 08 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 09 05 Apr 2018
Appendix 11.1 Preliminary Environmental Risk Assessment Part 10 05 Apr 2018
Appendix 11.2 Environmental Risk Assessment (The Stag Brewery East Site) Part 01 05 Apr 2018
Appendix 11.2 Environmental Risk Assessment (The Stag Brewery East Site) Part 02 05 Apr 2018
Appendix 11.2 Environmental Risk Assessment (The Stag Brewery East Site) Part 03 05 Apr 2018
Appendix 11.2 Environmental Risk Assessment (The Stag Brewery East Site) Part 04 05 Apr 2018
Appendix 12.1 Flood Risk Assessment 05 Apr 2018
Appendix 12.2 Drainage Strategy Part 01 05 Apr 2018
Appendix 12.2 Drainage Strategy Part 02 05 Apr 2018
Appendix 12.2 Drainage Strategy Part 03 05 Apr 2018
Appendix 12.3 Condition Survey of the River Wall 05 Apr 2018
Appendix 12.4 Maltings Building - Wall Assessment 05 Apr 2018
Appendix 12.5 Environmental Agency Meeting Minutes (26.09.2016) 05 Apr 2018
Appendix 13.1 Preliminary Ecological Appraisal 05 Apr 2018
Appendix 13.2 Protected Species Report 05 Apr 2018
Appendix 13.3 Water Framework Directive (WFD) Screening Request and Response 05 Apr 2018
Appendix 14.1 Archaeological Desk Based Assessment 05 Apr 2018
Appendix 14.2 Archaeological Evaluation Report 05 Apr 2018
Appendix 15.1 Built Heritage Statement 05 Apr 2018
Appendix 16.1 Townscape and Visual Consultation Correspondence 05 Apr 2018
Appendix 16.2 NIght-time Views 05 Apr 2018
Appendix 17.1 Pedestrian Level Wind Microclimate Assessment 05 Apr 2018
Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 01 05 Apr 2018
Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 02 05 Apr 2018
Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 03 05 Apr 2018
Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 04 05 Apr 2018
Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 05 05 Apr 2018
Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 06 05 Apr 2018
Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 07 05 Apr 2018
Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 08 05 Apr 2018
Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 09 05 Apr 2018
Appendix 18.2 Detailed Results of the Daylight (VSC), NSC and ADF) and Sunlight (APSH) Analysis 05 Apr 2018
Appendix 18.3 Results of the Overshadowing (Sunlight Amenity) Analysis 05 Apr 2018
Appendix 18.4 Transient Overshadowing Images 05 Apr 2018
Appendix 18.5 Light Pollution 05 Apr 2018
Appendix 2.1 EIA Scoping Report 05 Apr 2018
Appendix 2.2 Draft EIA Scoping Opinion 05 Apr 2018
Appendix 2.3 Scoping EIA Clarification Responses 05 Apr 2018
Appendix 2.4 Formal EIA Scoping Opinion 05 Apr 2018
Appendix 2.5 Applicant's Legal Response to Formal EIA Scoping Opinion 05 Apr 2018
Appendix 2.6 Key Issues Raised During the EIA Scoping Process 05 Apr 2018
Appendix 6.1 Phasing Plans Part 01 05 Apr 2018
Appendix 6.1 Phasing Plans Part 02 05 Apr 2018
Appendix 7.1-7.4 Socioeconomics 05 Apr 2018
Appendix 8.1 Transport Assessment 05 Apr 2018
Appendix 9.1 Acoustic Terminology 05 Apr 2018
Appendix 9.2 Baseline Noise Monitoring 05 Apr 2018
Appendix 9.3 Demolition and Construction Noise Assessment 05 Apr 2018
Appendix 9.4 Road Traffic Noise Assessment Calculations 05 Apr 2018
Application B Document Checklist 05 Apr 2018
Archaeology EIA Report Part 01 05 Apr 2018
Archaeology EIA Report Part 02 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 01 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 02 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 03 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 04 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 05 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 06 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 07 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 08 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 09 05 Apr 2018
DAYLIGHT, SUNLIGHT, OVERSHADOWING AND LIGHT POLLUTION EIA REPORT PART 10 05 Apr 2018
DESIGN 05 Apr 2018
DESIGN - (PARTIALLY SUPERSEDED) 05 Apr 2018
DESIGN - (PARTIALLY SUPERSEDED) 05 Apr 2018
DESIGN - SUPERSEDED 05 Apr 2018
DESIGN - SUPERSEDED 05 Apr 2018
DESIGN -(PARTIALLY SUPERSEDED) 05 Apr 2018
DRAINAGE STRATEGY PART 01 05 Apr 2018
DRAINAGE STRATEGY PART 02 05 Apr 2018
DRAINAGE STRATEGY PART 03 05 Apr 2018
Ecology EIA Report Part 01 05 Apr 2018
Ecology EIA Report Part 02 05 Apr 2018
Ecology EIA Report Part 03 05 Apr 2018
Energy Strategy 05 Apr 2018
Environmental Statement Volume 1: Main Text 05 Apr 2018
Environmental Statement Volume 2: Figures Part 01 05 Apr 2018
Environmental Statement Volume 2: Figures Part 02 05 Apr 2018
Environmental Statement Volume 2: Figures Part 03 05 Apr 2018
Environmental Statement Volume 2: Figures Part 04 05 Apr 2018
Environmental Statement Volume 2: Figures Part 05 05 Apr 2018
Environmental Statement Volume 2: Figures Part 06 05 Apr 2018
Environmental Statement Volume 2: Figures Part 07 05 Apr 2018
Environmental Statement Volume 2: Figures Part 08 05 Apr 2018
Environmental Statement Volume 2: Figures Part 09 05 Apr 2018
Environmental Statement Volume 2: Figures Part 10 05 Apr 2018
Environmental Statement Volume 2: Figures Part 11 05 Apr 2018
Environmental Statement Volume 2: Figures Part 12 05 Apr 2018
Environmental Statement Volume 2: Figures Part 13 05 Apr 2018
Environmental Statement Volume 2: Figures Part 14 05 Apr 2018
Environmental Statement Volume 2: Figures Part 15 05 Apr 2018
Foul Sewage and Utilities Assessment 05 Apr 2018
Framework Construction MAnagement Statement Part 01 05 Apr 2018
Framework Construction MAnagement Statement Part 02 05 Apr 2018
Framework Construction MAnagement Statement Part 03 05 Apr 2018
Framework Construction MAnagement Statement Part 04 05 Apr 2018
Framework Construction MAnagement Statement Part 05 05 Apr 2018
Framework Delivery and Servicing Management Plan 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 01 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 02 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 03 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 04 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 05 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 06 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 07 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 08 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 09 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 10 05 Apr 2018
Ground Conditions and Contamination EIA Report Part 11 05 Apr 2018
Health Impact Assessment 05 Apr 2018
Noise and Vibration EIA Report 05 Apr 2018
Noise Impact Assessment 05 Apr 2018
Non-Technical Summary 05 Apr 2018
Odour Assessment Report 05 Apr 2018
School Travel Plan 05 Apr 2018
Statement of Community Involvement 05 Apr 2018
SUPERSEDED - ABORICULTURAL REPORT PART 01 05 Apr 2018
SUPERSEDED - ABORICULTURAL REPORT PART 02 05 Apr 2018
SUPERSEDED - OPEN SPACE AND PLAYING PITCHES ASSESSMENT 05 Apr 2018
Sustainability Statement 05 Apr 2018
Town Planning Statement 05 Apr 2018
Transport and Access EIA Report 05 Apr 2018
Transport Assessment Part 01 05 Apr 2018
Transport Assessment Part 02 05 Apr 2018
Transport Assessment Part 03 05 Apr 2018
Transport Assessment Part 04 05 Apr 2018
Transport Assessment Part 05 05 Apr 2018
Transport Assessment Part 06 05 Apr 2018
Transport Assessment Part 07 05 Apr 2018
Transport Assessment Part 08 05 Apr 2018
Transport Assessment Part 09 05 Apr 2018
Transport Assessment Part 10 05 Apr 2018
Transport Assessment Part 11 05 Apr 2018
Transport Assessment Part 12 05 Apr 2018
Transport Assessment Part 13 05 Apr 2018
Transport Assessment Part 14 05 Apr 2018
Transport Assessment Part 15 05 Apr 2018
Water Resources and Flood Risk EIA Report Part 01 05 Apr 2018
Water Resources and Flood Risk EIA Report Part 02 05 Apr 2018
Water Resources and Flood Risk EIA Report Part 03 05 Apr 2018
Water Resources and Flood Risk EIA Report Part 04 05 Apr 2018
Water Resources and Flood Risk EIA Report Part 05 05 Apr 2018
Environmental Statement Volume 3: Appendix 10.1 Air Quality Modelling_15.02.18 12 Apr 2018
Environmental Statement Volume 3: Appendix 10.2 Air Quality Neutral Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 10.3 Air Quality Modelling Results 12 Apr 2018
Environmental Statement Volume 3: Appendix 10.4 Interim Junction Design Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 01 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 02 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 03 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 04 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 05 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 06 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 07 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 08 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 09 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 10 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.2 Environmental Risk Assessment (The Stag Brewary Site) Part 01 of 04 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.2 Environmental Risk Assessment (The Stag Brewary Site) Part 02 of 04 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.2 Environmental Risk Assessment (The Stag Brewary Site) Part 03 of 04 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.2 Environmental Risk Assessment (The Stag Brewary Site) Part 04 of 04 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.1 Flood Risk Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.2 Drainage Strategy Part 01 of 03 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.2 Drainage Strategy Part 02 of 03 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.2 Drainage Strategy Part 03 of 03 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.3 CS Thames River Wall 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.4 Maltings Building Wall Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.5 EA Meeting Minutes 12 Apr 2018
ENVIRONMENTAL STATEMENT VOLUME 3: APPENDIX 13.1 PEA 12 Apr 2018
Environmental Statement Volume 3: Appendix 13.2 Protected Species Report 12 Apr 2018
Environmental Statement Volume 3: Appendix 13.3 WFD Screening Request & Response 12 Apr 2018
Environmental Statement Volume 3: Appendix 14.1 Archaeological Desk Based Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 14.2 Archaeological Evaulation Report 12 Apr 2018
Environmental Statement Volume 3: Appendix 15.1 Built Heritage Statement 12 Apr 2018
Environmental Statement Volume 3: Appendix 16.1 Consultation Correspondence 12 Apr 2018
Environmental Statement Volume 3: Appendix 16.2 Night-time Views 12 Apr 2018
Environmental Statement Volume 3: Appendix 17.1 Pedestrian Level Wind Microclimate Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 01 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 02 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 03 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 04 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 05 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 06 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 07 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 09 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.2 Detailed Results of the Daylight VSC NSC and ADF and Sunlight Analysis 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.3 results of the Overshadowing (Sunlight Amenity) Analysis 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.4 Transient Overshadowing Images 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.5 Light Pollution 12 Apr 2018
Environmental Statement Volume 3: Appendix 2.1 EIA Scoping Report 12 Apr 2018
Environmental Statement Volume 3: Appendix 2.2 Draft EIA scoping opinon 12 Apr 2018
Environmental Statement Volume 3: Appendix 2.3 EIA Scoping Clarification Responses 12 Apr 2018
Environmental Statement Volume 3: Appendix 2.4 Formal EIA Scoping Opinion 12 Apr 2018
ENVIRONMENTAL STATEMENT VOLUME 3: APPENDIX 2.5 APPLICANTS LEGAL RESPONSE TO FORMAL EIA SCOPING OPINION 12 Apr 2018
Environmental Statement Volume 3: Appendix 2.6 Key Issues Raised During the EIA Scoping Process v2 12 Apr 2018
Environmental Statement Volume 3: Appendix 6.1 Phasing Plans Part 01 of 02 12 Apr 2018
Environmental Statement Volume 3: Appendix 6.1 Phasing Plans Part 02 of 02 12 Apr 2018
ENVIRONMENTAL STATEMENT VOLUME 3: APPENDIX 7.1 TO 7.5 SOCIOECONOMICS 12 Apr 2018
Environmental Statement Volume 3: Appendix 8.1 Transport Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 9.1 Acoustic Terminology 12 Apr 2018
Environmental Statement Volume 3: Appendix 9.2 Baseline Noise Monitoring 12 Apr 2018
Environmental Statement Volume 3: Appendix 9.3 Demolition and Construction Noise Assesment 12 Apr 2018
Environmental Statement Volume 3: Appendix 9.4 Road Traffic Noise Assessment Calculations 12 Apr 2018
Environmental Statement Volume 3: Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 08 of 09 12 Apr 2018
area schedule - GEA - final planning application 20 Jun 2019
area schedule - GIA - final planning application 20 Jun 2019
area schedule - NSA - final planning application 20 Jun 2019
financial viability assessment addendum 20 Jun 2019
revised environmental statement non-technical summary 20 Jun 2019
revised open space and playing pitches assessment 20 Jun 2019
town planning statement addendum 20 Jun 2019
transport assessment addendum - final 20 Jun 2019
Design and Access Statement Addendum part 1 25 Jun 2019
Design and Access Statement Addendum part 2 25 Jun 2019
Design and Access Statement Addendum part 3 25 Jun 2019
Revised Arboriculture Report part 1 25 Jun 2019
Revised Arboriculture Report part 2 25 Jun 2019
Revised Arboriculture Report part 2 25 Jun 2019
Revised Arboriculture Report part 3 25 Jun 2019
Revised Environmental Statement Addendum Part 1 25 Jun 2019
Revised Environmental Statement Addendum Part 2 25 Jun 2019
Revised Environmental Statement Addendum Part 3 25 Jun 2019
Revised Environmental Statement Addendum Part 4 25 Jun 2019
Revised Environmental Statement Addendum Part 5 25 Jun 2019
Revised Environmental Statement Addendum Part 6 25 Jun 2019
Revised Environmental Statement Addendum Part 7 25 Jun 2019
Revised landscape, design and access statement 25 Jun 2019
Response to GLA Air Quality queries 03 Sep 2019
School Addendum Report 08 Jan 2020
GLA's Stage 2 referral cover letter 05 May 2020
GLA's Stage 2 referral report 05 May 2020
DESIGN AND ACCESS STATEMENT - SECONDARY SCHOOL - PART 1 OF 6 12 Aug 2020
DESIGN AND ACCESS STATEMENT - SECONDARY SCHOOL - PART 2 OF 6 12 Aug 2020
DESIGN AND ACCESS STATEMENT - SECONDARY SCHOOL - PART 3 OF 6 12 Aug 2020
DESIGN AND ACCESS STATEMENT - SECONDARY SCHOOL - PART 4 OF 6 12 Aug 2020
DESIGN AND ACCESS STATEMENT - SECONDARY SCHOOL - PART 5 OF 6 12 Aug 2020
DESIGN AND ACCESS STATEMENT - SECONDARY SCHOOL - PART 6 OF 6 12 Aug 2020
LANDSCAPE DESIGN AND ACCESS STATEMENT 12 Aug 2020
SCHOOL TRAVEL PLAN 12 Aug 2020
DESIGN ADDENDUM PART 1 13 Aug 2020
DESIGN ADDENDUM PART 10 13 Aug 2020
DESIGN ADDENDUM PART 11 13 Aug 2020
DESIGN ADDENDUM PART 12 13 Aug 2020
DESIGN ADDENDUM PART 13 13 Aug 2020
DESIGN ADDENDUM PART 14 13 Aug 2020
DESIGN ADDENDUM PART 15 13 Aug 2020
DESIGN ADDENDUM PART 16 13 Aug 2020
DESIGN ADDENDUM PART 2 13 Aug 2020
DESIGN ADDENDUM PART 3 13 Aug 2020
DESIGN ADDENDUM PART 4 13 Aug 2020
DESIGN ADDENDUM PART 5 13 Aug 2020
DESIGN ADDENDUM PART 6 13 Aug 2020
DESIGN ADDENDUM PART 7 13 Aug 2020
DESIGN ADDENDUM PART 8 13 Aug 2020
DESIGN ADDENDUM PART 9 13 Aug 2020