Planning application number: 18/0547/FUL

Site address

The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET (View Site Plan)

View

Status:

Refused Permission 18/08/2021

Latest: Decision Issued

Level: Other Council

Details

Proposal

APPLICATION A: Hybrid application to include 1. The demolition of existing buildings and structures, except The Maltings and the façade of the Bottling Plant and former Hotel; Site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site: 2. Detailed application for works to the east side of Ship Lane which comprise: a. Alterations and extensions to existing buildings; erection of buildings (3 to 8 storeys) plus basements to allow for 439 residential apartments; Flexible use floorspace for various commercial uses, community and leisure; and hotel, cinema, gym and office floorspace b. New pedestrian, vehicle and cycle accesses and associated highway works c. Provision of on-site cycle, vehicle and service parking at surface and basement level d. Provision of public open space, amenity and play space and landscaping e. Flood defence and towpath works f. Installation of plant and energy centres 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise: a) Single storey basement and buildings varying in height from 3 to 7 storeys b) Residential development of up to 224 units c) Nursing and care home (up to 80 ensuite rooms) with associated facilities d) Up to 150 units of flexible use living accommodation for either assisted living or residential use e) New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works f) Provision of on-site cycle, vehicle and service parking g) Provision of public open space, amenity and play space and landscaping. FOR FULL DESCRIPTION OF DEVELOPMENT, REFER TO ACCOMPANYING COVERING LETTER, WHICH CAN BE VIEWED ON THE APPLICATION FILE, ON OUR WEBSITE.

Type

Full Application

Ward

MORTLAKE, BARNES COMMON WARD - Historic From 06/05/2022

Applicant

Show applicant details

Agent

Mr Kevin Watson 72 Welbeck Street London W1G 0AY

Officer

Lucy Thatcher

Site plan

View Site Plan

Progress

A decision has been issued by the authority.

A copy of the decision notice will appear in the case file soon, and within a maximum of two weeks.
  • Application Received: 19/02/2018
  • Validated: 29/03/2018
  • Neighbour notification started: 09/04/2018
  • Neighbour notification ended: 09/05/2018
  • Decision Issued: 18/08/2021

Documents and images

DescriptionDate Published
Application form Note 19 Feb 2018
CIL Additional Information Form Appedix 2 19 Feb 2018
CIL Additional Information Form Appendix 1 19 Feb 2018
Affordable Housing Statement Feb 2018 05 Apr 2018
Air Quality EIA Report Feb 2018 05 Apr 2018
Application A Document Checklist 05 Apr 2018
Archaeology (Buried Heritage) EIA Report Feb 2018 PT 01 05 Apr 2018
Archaeology (Buried Heritage) EIA Report Feb 2018 PT 02 05 Apr 2018
Assisted Living Demand Assessment Feb 2018 05 Apr 2018
Assisted Living Overview & Characteristics Report Feb 2018 05 Apr 2018
Built Heritage EIA Report Feb 2018 05 Apr 2018
Community Uses & Cultural Strategy Feb 2018 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 01 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 02 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 03 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 04 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 05 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 06 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 07 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 08 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 09 05 Apr 2018
Daylight, Sunlight, Overshadowing & Light Pollution EIA Report PT 10 05 Apr 2018
Drainage Strategy Feb 2018 PT 01 05 Apr 2018
Drainage Strategy Feb 2018 PT 02 05 Apr 2018
Drainage Strategy Feb 2018 PT 03 05 Apr 2018
Ecology EIA Report Feb 2018 PT 01 05 Apr 2018
Ecology EIA Report Feb 2018 PT 02 05 Apr 2018
Ecology EIA Report Feb 2018 PT 03 05 Apr 2018
Employment Assessment Feb 2018 05 Apr 2018
Energy Strategy Feb 2018 05 Apr 2018
Environmental Statement Volume 1: Main Text Feb 2018 05 Apr 2018
Environmental Statement Volume 2: Figures PT 01 05 Apr 2018
Environmental Statement Volume 2: Figures PT 02 05 Apr 2018
Environmental Statement Volume 2: Figures PT 03 05 Apr 2018
Environmental Statement Volume 2: Figures PT 04 05 Apr 2018
Environmental Statement Volume 2: Figures PT 05 05 Apr 2018
Environmental Statement Volume 2: Figures PT 06 05 Apr 2018
Environmental Statement Volume 2: Figures PT 07 05 Apr 2018
Environmental Statement Volume 2: Figures PT 08 05 Apr 2018
Environmental Statement Volume 2: Figures PT 09 05 Apr 2018
Environmental Statement Volume 2: Figures PT 10 05 Apr 2018
Environmental Statement Volume 2: Figures PT 11 05 Apr 2018
Environmental Statement Volume 2: Figures PT 12 05 Apr 2018
Environmental Statement Volume 2: Figures PT 13 05 Apr 2018
Environmental Statement Volume 2: Figures PT 14 05 Apr 2018
Environmental Statement Volume 2: Figures PT 15 05 Apr 2018
Environmental Statement: Non-Technical Summary Feb 2018 05 Apr 2018
FINANCIAL VIABILITY ASSESSMENT FEB 2018 05 Apr 2018
Foul Sewage & Utilities Assessment Feb 2018 05 Apr 2018
Framework Delivery & Servicing Management Plan Feb 2018 05 Apr 2018
Framework Estate Management Strategy Feb 2018 05 Apr 2018
Framework Travel Plan Feb 2018 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 01 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 02 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 03 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 04 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 05 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 06 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 07 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 08 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 09 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 10 05 Apr 2018
Ground Conditions & Contamination EIA Report Feb 2018 PT 11 05 Apr 2018
Health Impact Assessment Feb 2018 05 Apr 2018
Hotel Need Assessment Feb 2018 05 Apr 2018
Housing Assessment Matrix Feb 2018 05 Apr 2018
Lighting Masterplan Feb 2018 05 Apr 2018
Noise & Vibration EIA Report Feb 2018 05 Apr 2018
Noise Impact Assessment Feb 2018 05 Apr 2018
Odour Assessment Report Feb 2018 05 Apr 2018
Operational Waste Management Strategy Feb 2018 05 Apr 2018
Outline Car Park Management Plan Feb 2018 05 Apr 2018
PT 01 Design & Access Statement : Volume 1 Masterplan Proposals Feb 2018 05 Apr 2018
PT 01 Design & Access Statement Volume 2: Detailed Design Statement Feb 2018 05 Apr 2018
PT 01 Framework Construction Management Statement Feb 2018 05 Apr 2018
PT 01 Landscape Design & Access Statement: Application A Feb 2018 05 Apr 2018
PT 01 Water Resources & Flood Risk EIA Report Feb 2018 05 Apr 2018
PT 02 Design & Access Statement : Volume 1 Masterplan Proposals Feb 2018 05 Apr 2018
PT 02 Design & Access Statement Volume 2: Detailed Design Statement Feb 2018 05 Apr 2018
PT 02 Framework Construction Management Statement Feb 2018 05 Apr 2018
PT 02 Water Resources & Flood Risk EIA Report Feb 2018 05 Apr 2018
PT 03 Design & Access Statement : Volume 1 Masterplan Proposals Feb 2018 05 Apr 2018
PT 03 Design & Access Statement Volume 2: Detailed Design Statement Feb 2018 05 Apr 2018
PT 03 Framework Construction Management Statement Feb 2018 05 Apr 2018
PT 03 Water Resources & Flood Risk EIA Report Feb 2018 05 Apr 2018
PT 04 Design & Access Statement : Volume 1 Masterplan Proposals Feb 2018 05 Apr 2018
PT 04 Framework Construction Management Statement Feb 2018 05 Apr 2018
PT 04 Water Resources & Flood Risk EIA Report Feb 2018 05 Apr 2018
PT 05 Framework Construction Management Statement Feb 2018 05 Apr 2018
PT 05 Water Resources & Flood Risk EIA Report Feb 2018 05 Apr 2018
Residential Travel Plan Feb 2018 05 Apr 2018
Retail & Leisure Statement Feb 2018 05 Apr 2018
Site Waste Management Plan Feb 2018 05 Apr 2018
Socio-Economics EIA Report Feb 2018 05 Apr 2018
Sports Pitch Lighting Assessment Feb 2018 05 Apr 2018
Statement of Community Involvement Feb 2018 05 Apr 2018
Structural Impact Assessment Feb 2018 05 Apr 2018
SUPERSEDED - ACCOMMODATION AND AREA SCHEDULES FEB 2018 05 Apr 2018
SUPERSEDED - INTERNAL DAYLIGHT & SUNLIGHT REPORT FEB 2018 05 Apr 2018
SUPERSEDED - OPEN SPACE & PLAYING PITCHES ASSESSMENT FEB 2018 05 Apr 2018
SUPERSEDED - PT 01 ABORICULTURAL SURVEY REPORT & IMPACT ASSESSMENT FEB 2018 05 Apr 2018
SUPERSEDED - PT 01 DESIGN & ACCESS STATEMENT VOLUME 3: DESIGN CODE FEB 2018 05 Apr 2018
SUPERSEDED - PT 02 ABORICULTURAL SURVEY REPORT & IMPACT ASSESSMENT FEB 2018 05 Apr 2018
SUPERSEDED - PT 02 DESIGN & ACCESS STATEMENT VOLUME 3: DESIGN CODE FEB 2018 05 Apr 2018
SUPERSEDED - PT 02 LANDSCAPE DESIGN & ACCESS STATEMENT: APPLICATION A FEB 2018 05 Apr 2018
SUPERSEDED - PT 03 DESIGN & ACCESS STATEMENT VOLUME 3: DESIGN CODE FEB 2018 05 Apr 2018
SUPERSEDED - PT 03 LANDSCAPE DESIGN & ACCESS STATEMENT: APPLICATION A FEB 2018 05 Apr 2018
SUPERSEDED - PT 04 LANDSCAPE DESIGN & ACCESS STATEMENT: APPLICATION A FEB 2018 05 Apr 2018
Sustainability Statement Feb 2018 05 Apr 2018
Town Planning Statement Feb 2018 05 Apr 2018
Transport & Access EIA Report Feb 2018 05 Apr 2018
Transport Assessment Feb 2018 PT 01 05 Apr 2018
Transport Assessment Feb 2018 PT 02 05 Apr 2018
Transport Assessment Feb 2018 PT 03 05 Apr 2018
Transport Assessment Feb 2018 PT 04 05 Apr 2018
Transport Assessment Feb 2018 PT 05 05 Apr 2018
Transport Assessment Feb 2018 PT 06 05 Apr 2018
Transport Assessment Feb 2018 PT 07 05 Apr 2018
Transport Assessment Feb 2018 PT 08 05 Apr 2018
Transport Assessment Feb 2018 PT 09 05 Apr 2018
Transport Assessment Feb 2018 PT 10 05 Apr 2018
Transport Assessment Feb 2018 PT 11 05 Apr 2018
Transport Assessment Feb 2018 PT 12 05 Apr 2018
Transport Assessment Feb 2018 PT 13 05 Apr 2018
Transport Assessment Feb 2018 PT 14 05 Apr 2018
Transport Assessment Feb 2018 PT 15 05 Apr 2018
Unit & Room Sizes - Building 10 Compliance 05 Apr 2018
Unit & Room Sizes - Building 11 Compliance 05 Apr 2018
Unit & Room Sizes - Building 12 Compliance 05 Apr 2018
Unit & Room Sizes - Building 2 Compliance 05 Apr 2018
Unit & Room Sizes - Building 3 Compliance 05 Apr 2018
Unit & Room Sizes - Building 4 Compliance 05 Apr 2018
Unit & Room Sizes - Building 6 Compliance 05 Apr 2018
Unit & Room Sizes - Building 7 Compliance 05 Apr 2018
Unit & Room Sizes - Building 8 Compliance 05 Apr 2018
Unit & Room Sizes - Building 9 Compliance 05 Apr 2018
Unit & Room Sizes - Compliance Summary 05 Apr 2018
Environmental Statement Volume 3: Appendix 10.1 Air Quality Modelling Study 12 Apr 2018
Environmental Statement Volume 3: Appendix 10.2 Air Quality Neutral Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 10.3 Air Quality Modelling Results 12 Apr 2018
Environmental Statement Volume 3: Appendix 10.4 Interim Junction Design Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 01 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 02 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 03 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 04 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 05 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 06 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 07 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 08 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 09 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.1 Preliminary Environmental Risk Assessment Part 10 of 10 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.2 Environmental Risk Assessment (The Stag Brewary Site) Part 01 of 04 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.2 Environmental Risk Assessment (The Stag Brewary Site) Part 02 of 04 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.2 Environmental Risk Assessment (The Stag Brewary Site) Part 03 of 04 12 Apr 2018
Environmental Statement Volume 3: Appendix 11.2 Environmental Risk Assessment (The Stag Brewary Site) Part 04 of 04 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.1 Flood Risk Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.2 Drainage Strategy Part 01 of 03 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.2 Drainage Strategy Part 02 of 03 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.2 Drainage Strategy Part 03 of 03 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.3 CS Thames River Wall 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.4 Maltings Building Wall Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 12.5 EA Meeting Minutes 12 Apr 2018
ENVIRONMENTAL STATEMENT VOLUME 3: APPENDIX 13.1 PEA 12 Apr 2018
Environmental Statement Volume 3: Appendix 13.2 Protected Species Report 12 Apr 2018
Environmental Statement Volume 3: Appendix 13.3 WFD Screening Request & Response 12 Apr 2018
Environmental Statement Volume 3: Appendix 14.1 Archaeological Desk Based Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 14.2 Archaeological Evaulation Report 12 Apr 2018
Environmental Statement Volume 3: Appendix 15.1 Built Heritage Statement 12 Apr 2018
Environmental Statement Volume 3: Appendix 16.1 Consultation Correspondence 12 Apr 2018
Environmental Statement Volume 3: Appendix 16.2 Night-time Views 12 Apr 2018
Environmental Statement Volume 3: Appendix 17.1 Pedestrian Level Wind Microclimate Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 01 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 02 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 03 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 04 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 05 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 06 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 07 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 08 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.1 Drawings of the Baseline Condition and Development Scenario Part 09 of 09 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.2 Detailed Results of the Daylight VSC NSC and ADF and Sunlight Analysis 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.3 results of the Overshadowing (Sunlight Amenity) Analysis 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.4 Transient Overshadowing Images 12 Apr 2018
Environmental Statement Volume 3: Appendix 18.5 Light Pollution 12 Apr 2018
Environmental Statement Volume 3: Appendix 6.1 Phasing Plans Part 1 of 2 12 Apr 2018
Environmental Statement Volume 3: Appendix 6.1 Phasing Plans Part 2 of 2 12 Apr 2018
ENVIRONMENTAL STATEMENT VOLUME 3: APPENDIX 7.1 TO 7.5 SOCIOECONOMICS 12 Apr 2018
Environmental Statement Volume 3: Appendix 8.1 Transport Assessment 12 Apr 2018
Environmental Statement Volume 3: Appendix 9.1 Acoustic Terminology 12 Apr 2018
Environmental Statement Volume 3: Appendix 9.2 Baseline Noise Monitoring 12 Apr 2018
Environmental Statement Volume 3: Appendix 9.3 Demolition and Construction Noise Assesment 12 Apr 2018
Environmental Statement Volume 3: Appendix 9.4 Road Traffic Noise Assessment Calculations 12 Apr 2018
Environmental Statement Volume 3: Appx 2.1 EIA Scoping Report 12 Apr 2018
Environmental Statement Volume 3: Appx 2.2 Draft EIA Scoping Opinion 12 Apr 2018
Environmental Statement Volume 3: Appx 2.3 EIA Scoping Clarification Responses 12 Apr 2018
Environmental Statement Volume 3: Appx 2.4 Formal EIA Scoping Opinion 12 Apr 2018
ENVIRONMENTAL STATEMENT VOLUME 3: APPX 2.5 APPLICANTS LEGAL RESPONSE TO FORMAL EIA SCOPING OPINION 12 Apr 2018
Environmental Statement Volume 3: Appx 2.6 Key Issues Raised During the EIA Scoping Process v2 12 Apr 2018
area schedule - GEA - final planning application 20 Jun 2019
area schedule - GIA - final planning application 20 Jun 2019
area schedule - NSA- final planning application 20 Jun 2019
building 02 - compliance schedule 20 Jun 2019
building 03 - compliance schedule 20 Jun 2019
building 04 - compliance schedule 20 Jun 2019
building 06 - compliance schedule 20 Jun 2019
building 07 - compliance schedule 20 Jun 2019
building 08 - compliance schedule 20 Jun 2019
building 09 - compliance schedule 20 Jun 2019
building 10 - compliance schedule 20 Jun 2019
building 11 - compliance schedule 20 Jun 2019
building 12 - compliance schedule 20 Jun 2019
financial vaibility addendum 20 Jun 2019
revised design code 20 Jun 2019
revised environmnetal statement non-technical summary 20 Jun 2019
revised internal daylight sunlight report 20 Jun 2019
revised open space and playing pitches assessment 20 Jun 2019
summary - compliance schedule 20 Jun 2019
town planning statement addendum 20 Jun 2019
transport assessment addendum - final 20 Jun 2019
Design and Access Statement Addendum part 1 25 Jun 2019
Design and Access Statement Addendum part 2 25 Jun 2019
Design and Access Statement Addendum part 3 25 Jun 2019
Revised Arboriculture Report part 1 25 Jun 2019
Revised Arboriculture Report part 2 25 Jun 2019
Revised Arboriculture Report part 3 25 Jun 2019
Revised Environmental Statement Addendum Part 1 25 Jun 2019
Revised Environmental Statement Addendum Part 2 25 Jun 2019
Revised Environmental Statement Addendum Part 3 25 Jun 2019
Revised Environmental Statement Addendum Part 4 25 Jun 2019
Revised Environmental Statement Addendum Part 5 25 Jun 2019
Revised Environmental Statement Addendum Part 6 25 Jun 2019
Revised Environmental Statement Addendum Part 7 25 Jun 2019
Revised Landscape, Design and Access Statement - part 1 25 Jun 2019
Revised Landscape, Design and Access Statement - part 2 25 Jun 2019
Revised Landscape, Design and Access Statement - part 3 25 Jun 2019
Revised Landscape, Design and Access Statement - part 4 25 Jun 2019
Revised Landscape, Design and Access Statement - part 5 25 Jun 2019
Response to GLA Air Quality queries 03 Sep 2019
INDEPENDENT LIGHT REVIEW 24 Jan 2020
Independent Daylight and Sunlight Review 27 Jan 2020
3G Pitch Noise Report 29 Jan 2020
Air Quality Note to GLA 29 Jan 2020
Applicant Response to Environment Agency 29 Jan 2020
Energy Strategy Addendum 29 Jan 2020
Independent Review of Daylight and Sunlight 29 Jan 2020
Independent Review of Floodlighting Scheme 29 Jan 2020
REVISED Design Code rev I 29 Jan 2020
REVISED Landscape Design and Access Statement Part 1 29 Jan 2020
REVISED Landscape Design and Access Statement Part 2 29 Jan 2020
REVISED Landscape Design and Access Statement Part 3 29 Jan 2020
REVISED Landscape Design and Access Statement Part 4 29 Jan 2020
REVISED Landscape Design and Access Statement Part 5 29 Jan 2020
REVISED Retail and Leisure Statement 29 Jan 2020
GLA's Stage 2 referral cover letter 05 May 2020
GLA's Stage 2 referral report 05 May 2020
ACCOMODATION AND ARE SCHEDULES - REVISED ENLARGED SCHEME 12 Aug 2020
ACCOMODATION AND ARE SCHEDULES - REVISED ENLARGED SCHEME GEA 12 Aug 2020
ACCOMODATION AND ARE SCHEDULES - REVISED ENLARGED SCHEME GIA 12 Aug 2020
ACCOMODATION AND ARE SCHEDULES - REVISED ENLARGED SCHEME MIX SUMMARY 12 Aug 2020
ACCOMODATION AND ARE SCHEDULES - REVISED ENLARGED SCHEME NSA 12 Aug 2020
AFFORDABLE HOUSING STATEMENT ADDENDUM 12 Aug 2020
AFFORDABLE HOUSING STATEMENT FEBRUARY 2018 12 Aug 2020
COMMUNITY USES AND CULTURAL STRATEGY ASSESSMENT JULY 2020 12 Aug 2020
DESIGN AND ACCESS STATEMENT MASTERPLAN VOLUME 1 - PART 1 OF 4 12 Aug 2020
DESIGN AND ACCESS STATEMENT MASTERPLAN VOLUME 1 - PART 2 OF 4 12 Aug 2020
DESIGN AND ACCESS STATEMENT MASTERPLAN VOLUME 1 - PART 3 OF 4 12 Aug 2020
DESIGN AND ACCESS STATEMENT MASTERPLAN VOLUME 1 - PART 4 OF 4 12 Aug 2020
DESIGN AND ACCESS STATEMENT VOLUME 2 DETAILED DESIGN- PART 1 OF 3 12 Aug 2020
DESIGN AND ACCESS STATEMENT VOLUME 2 DETAILED DESIGN- PART 2 OF 3 12 Aug 2020
DESIGN AND ACCESS STATEMENT VOLUME 2 DETAILED DESIGN- PART 3 OF 3 12 Aug 2020
EMPLOYMENT ASSESSMENT 2018 12 Aug 2020
EMPLOYMENT ASSESSMENT ADDENDUM 2020 12 Aug 2020
ENERGY STRATEGY 12 Aug 2020
FINANCIAL VIABILITY ASSESSMENT ADDENDUM JUNE 2019 12 Aug 2020
FINANCIAL VIABILITY ASSESSMENT ADDENDUM MARCH 2019 12 Aug 2020
FINANCIAL VIABILITY ASSESSMENT ADDENDUM MAY 2020 12 Aug 2020
FINANCIAL VIABILITY ASSESSMENT FEBRUARY 2018 12 Aug 2020
FIRE STATEMENT 12 Aug 2020
FOUL SEWAGE AND UTILITIES ASSESSMENT 12 Aug 2020
FRAMEWORK ESTATE MANAGEMENT STRATEGY 12 Aug 2020
FRAMEWORK TRAVEL PLAN 12 Aug 2020
HEALTH IMPACT ASSESSMENT - JULY 2020 12 Aug 2020
HOTEL NEEDS ASSESSMENT 12 Aug 2020
INTERNAL DAYLIGHT AND SUNLIGHT ASSESSMENT 12 Aug 2020
LIGHTING MASTERPLAN 12 Aug 2020
NOISE IMPACT ASSESSMENT 12 Aug 2020
ODOUR ASSESSMENT REPORT 12 Aug 2020
OPEN SPACE AND PLAYING PITCHES ASSESSMENT 12 Aug 2020
OPERATIONAL WASTE STRATEGY 12 Aug 2020
OUTLINE CAR PARK MANAGEMENT PLAN 12 Aug 2020
RESIDENTIAL TRAVEL PLAN 12 Aug 2020
RETAIL AND LEISURE STATEMENT ADDENDUM JULY 2020 12 Aug 2020
RETAIL AND LEISURE STATEMENT REVISED SEPTEMBER 2019 12 Aug 2020
SITE WASTE MANAGEMENT PLAN FEBRUARY 2018 12 Aug 2020
SPORTS PITCH LIGHTING ASSESSMENT 12 Aug 2020
STATEMENT OF COMMUNITY INVOLVEMENT 12 Aug 2020
STRUCTURAL IMPACT ASSESSMENT 12 Aug 2020
SUSTAINABILITY STATEMENT 12 Aug 2020
TOWN PLANNING STATEMENT ADDENDUM JULY 2020 12 Aug 2020
TOWN PLANNING STATEMENT ADDENDUM MAY 2019 12 Aug 2020
TOWN PLANNING STATEMENT FEBRUARY 2018 12 Aug 2020
TRANSPORT ASSESSMENT - ADDENDUM MAY 2019 12 Aug 2020
TRANSPORT ASSESSMENT - PART 1 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 10 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 11 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 12 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 13 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 14 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 15 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 3 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 4 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 5 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 6 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 7 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 8 OF 15 12 Aug 2020
TRANSPORT ASSESSMENT - PART 9 OF 15 12 Aug 2020
ARBORICULTURAL IMPACT REPORT - PART 1 13 Aug 2020
ARBORICULTURAL IMPACT REPORT - PART 2 13 Aug 2020
ARBORICULTURAL IMPACT REPORT - PART 3 13 Aug 2020
DESIGN AND ACCESS STATEMENT ADDENDUM - PART 1 13 Aug 2020
DESIGN AND ACCESS STATEMENT ADDENDUM - PART 2 13 Aug 2020
DRAINAGE STRATEGY - PART 1 13 Aug 2020
DRAINAGE STRATEGY - PART 2 13 Aug 2020
DRAINAGE STRATEGY - PART 3 13 Aug 2020
DRAINAGE STRATEGY - PART 4 13 Aug 2020
DRAINAGE STRATEGY - PART 5 13 Aug 2020
DRAINAGE STRATEGY - PART 6 13 Aug 2020
DRAINAGE STRATEGY - PART 7 13 Aug 2020
ENVIRONMENTAL STATEMENT - NOT TECHNICAL SUMMARY 13 Aug 2020
ENVIRONMENTAL STATEMENT ADDENDUM 13 Aug 2020
ES ADDENDUM APPENDIX A FIGURES - PART 1 13 Aug 2020
ES ADDENDUM APPENDIX A FIGURES - PART 2 13 Aug 2020
ES ADDENDUM APPENDIX A FIGURES - PART 3 13 Aug 2020
ES ADDENDUM APPENDIX A FIGURES - PART 4 13 Aug 2020
ES ADDENDUM APPENDIX A FIGURES - SELECTION PLANNING DRAWINGS - PART 1 13 Aug 2020
ES ADDENDUM APPENDIX A FIGURES - SELECTION PLANNING DRAWINGS - PART 2 13 Aug 2020
ES ADDENDUM APPENDIX A FIGURES - SELECTION PLANNING DRAWINGS - PART 3 13 Aug 2020
ES APPENDIX B REPLACEMENT ES APPENDIX 6.1 PHASING PLANS 13 Aug 2020
ES APPENDIX C REPALCMENT ES CHAPTER 7 SOCIO ECONOMICS 13 Aug 2020
ES APPENDIX D APPENDIX 7.1-7.4 - SOCIALECONOMIC APPENDICES 13 Aug 2020
ES APPENDIX F ES APPENDIX 9.1 ACOUSTIC TERMINOLOGY 13 Aug 2020
ES APPENDIX F ES APPENDIX 9.2 BASELINE NOISE MONITORING 13 Aug 2020
ES APPENDIX F ES APPENDIX 9.4 ROAD TRAFFIC NOISE ASSESSMENT CALCULATIONS MAY 2020 13 Aug 2020
ES APPENDIX G ES APPENDIX 9.5 HIGHWAY OPTIONS NOISE 13 Aug 2020
ES APPENDIX H REPEALCMENT ES CHAPTER 10 AIR QUALITY 13 Aug 2020
ES APPENDIX I ES APPENDIX 10.5 AIR QUALITY MONITORING REPORT 13 Aug 2020
ES APPENDIX I REPLACEMENT ES APPENDIX 10.1 AIR QUALITY MODELLING 13 Aug 2020
ES APPENDIX I REPLACEMENT ES APPENDIX 10.1 AIR QUALITY MODELLING 13 Aug 2020
ES APPENDIX I REPLACEMENT ES APPENDIX 10.2 AIR QUALITY NEUTRAL ASSESSMENT 13 Aug 2020
ES APPENDIX I REPLACEMENT ES APPENDIX 10.3 AIR QUALITY MODELLING RESULTS 13 Aug 2020
ES APPENDIX I REPLACEMENT ES APPENDIX 10.4 - JUNCTION ASSESSMENT 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 1 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 10 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 11 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 12 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 13 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 14 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 2 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 3 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 4 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 5 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 6 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 7 13 Aug 2020
ES APPENDIX J REPLACEMENT ES APPENDIX 11.1 - PART 8 13 Aug 2020
ES APPENDIX J REPLACMENT ES APPENDIX 11.1 - PART 9 13 Aug 2020
ES APPENDIX K REPLACEMENT ES APPENDIX 12.1 FLOOD RISK ASSESSMENT 13 Aug 2020
ES APPENDIX L REPLACEMENT ES APPENDIX 12.2 DRAINAGE STRATEGY - PART 1 13 Aug 2020
ES APPENDIX L REPLACEMENT ES APPENDIX 12.2 DRAINAGE STRATEGY - PART 2 13 Aug 2020
ES APPENDIX L REPLACEMENT ES APPENDIX 12.2 DRAINAGE STRATEGY - PART 3 13 Aug 2020
ES APPENDIX L REPLACEMENT ES APPENDIX 12.2 DRAINAGE STRATEGY - PART 4 13 Aug 2020
ES APPENDIX L REPLACEMENT ES APPENDIX 12.2 DRAINAGE STRATEGY - PART 5 13 Aug 2020
ES APPENDIX L REPLACEMENT ES APPENDIX 12.2 DRAINAGE STRATEGY - PART 6 13 Aug 2020
ES APPENDIX L REPLACEMENT ES APPENDIX 12.2 DRAINAGE STRATEGY - PART 7 13 Aug 2020
ES APPENDIX M RIVER WALL LIAISON SUMMARY NOTE 13 Aug 2020
ES APPENDIX N REPLACMENT ES APPENDIX 13.1 PRELIMINARY ECOLOGICAL APPRAISAL 13 Aug 2020
ES APPENDIX P REPLACEMENT S APPENDIX 14.1 ARCHAEOLOGICAL DESK BASED ASSESSMENT 13 Aug 2020
ES APPENDIX Q BUILT HERITAGE SUPPLEMENTARY PHOTOS 13 Aug 2020
ES APPENDIX R REPLACEMENT ES APPENDIX 17.1 PEDESTRIAN LEVEL WIND MICROCLIMATE ASSESSMENT - PART 1 13 Aug 2020
ES APPENDIX R REPLACEMENT ES APPENDIX 17.1 PEDESTRIAN LEVEL WIND MICROCLIMATE ASSESSMENT - PART 2 13 Aug 2020
ES APPENDIX S REPLACEMENT ES CHAPTER 18 DSO AND LIGHT POLLUTION 13 Aug 2020
ES APPENDIX T REPLACEMENT ES APPENDICES 18.1-18.5 DSO PART 1 13 Aug 2020
ES APPENDIX T REPLACEMENT ES APPENDICES 18.1-18.5 DSO PART 2 13 Aug 2020
ES APPENDIX T REPLACEMENT ES APPENDICES 18.1-18.5 DSO PART 3 13 Aug 2020
ES APPENDIX U REPLACEMENT CHAPTER 20 - SUMMARY OF MITIGATION MEASURES AND LIKELY RESIDUAL EFFECTS 13 Aug 2020
FRAMEWORK CONSTRUCTION MANAGEMENT STATEMENT - PART 1 13 Aug 2020
FRAMEWORK CONSTRUCTION MANAGEMENT STATEMENT - PART 2 13 Aug 2020
FRAMEWORK SERVICING AND DELIVERIES MANAGEMENT PLAN - PART 1 13 Aug 2020
FRAMEWORK SERVICING AND DELIVERIES MANAGEMENT PLAN - PART 2 13 Aug 2020
FRAMEWORK SERVICING AND DELIVERIES MANAGEMENT PLAN - PART 3 13 Aug 2020
LANDSCAPE DESIGN AND ACCESS STATEMENT - PART 1 13 Aug 2020
LANDSCAPE DESIGN AND ACCESS STATEMENT - PART 2 13 Aug 2020
LANDSCAPE DESIGN AND ACCESS STATEMENT - PART 3 13 Aug 2020
LANDSCAPE DESIGN AND ACCESS STATEMENT - PART 4 13 Aug 2020
LANDSCAPE DESIGN AND ACCESS STATEMENT - PART 5 13 Aug 2020
OPEN SPACES AND PLAY PITCHES ADDENDUM - PART 1 13 Aug 2020
OPEN SPACES AND PLAY PITCHES ADDENDUM - PART 2 13 Aug 2020
OPEN SPACES AND PLAY PITCHES ADDENDUM - PART 3 13 Aug 2020
OPEN SPACES AND PLAY PITCHES ADDENDUM - PART 4 13 Aug 2020
OPEN SPACES AND PLAY PITCHES ADDENDUM - PART 5 13 Aug 2020
OPEN SPACES AND PLAY PITCHES ADDENDUM - PART 6 13 Aug 2020
OPEN SPACES AND PLAY PITCHES ADDENDUM - PART 7 13 Aug 2020
SUPERSEDED - DESIGN CODE - PART 2 13 Aug 2020
SUPERSEDED -DESIGN CODE - PART 1 13 Aug 2020
TRANSPORT ASSESSMENT ADDENDUM - PART 1 13 Aug 2020
TRANSPORT ASSESSMENT ADDENDUM - PART 2 13 Aug 2020
TRANSPORT ASSESSMENT ADDENDUM - PART 3 13 Aug 2020
ENVIRONMENTAL STATEMENT ADDENDUM - PART 1 14 Aug 2020
ENVIRONMENTAL STATEMENT ADDENDUM - PART 2 14 Aug 2020
ENVIRONMENTAL STATEMENT ADDENDUM - PART 3 14 Aug 2020
ENVIRONMENTAL STATEMENT ADDENDUM - PART 4 14 Aug 2020
ENVIRONMENTAL STATEMENT ADDENDUM - PART 5 14 Aug 2020
ENVIRONMENTAL STATEMENT ADDENDUM - PART 6 14 Aug 2020
ENVIRONMENTAL STATEMENT ADDENDUM - PART 7 14 Aug 2020
ES APPENDIX O REPALCMENT ES APPENDIX 13.2 PROTECTED SPECIES REPORT - PART 1 14 Aug 2020
ES APPENDIX O REPLACEMENT ES APPENDIX 13.2 PROTECTED SPECIES REPORT - PART 2 14 Aug 2020
ES APPENDIX O REPLACEMENT ES APPENDIX 13.2 PROTECTED SPECIES REPORT - PART 3 14 Aug 2020
circular economy statement 30 Sep 2020
Design and Access Statement Addendum 30 Sep 2020
Design Code 30 Sep 2020
Energy Strategy addendum - Rev D 30 Sep 2020
ES Addendum (sept 2020) 30 Sep 2020
GLA WLC reporting tool DA1 (detailed) 30 Sep 2020
GLA WLC reporting tool DA2 (outline) 30 Sep 2020