30 HG_P 212
| PROPOSED SIDE ELEVATION | 19 Dec 2024 |
EXISTING FRONT ELEVATION
| 30 HG_E 011 | 19 Dec 2024 |
EXISTING GROUND FLOOR PLAN
| 30 HG_E 001 | 19 Dec 2024 |
EXISTING GROUND FLOOR PLAN
| 30 HG_E 002 | 19 Dec 2024 |
EXISTING LOCATION AND SITE PLAN
| 30 HG_E 000 | 19 Dec 2024 |
EXISTING REAR ELEVATION
| 30 HG_E 013 | 19 Dec 2024 |
EXISTING SECTION AA
| 30 HG_E 021 | 19 Dec 2024 |
EXISTING SECTION CC
| 30 HG_E 022 | 19 Dec 2024 |
EXISTING SIDE ELEVATION
| 30 HG_E 012 | 19 Dec 2024 |
PROPOSED FRONT ELEVATION
| 30 HG_P 211 | 19 Dec 2024 |
PROPOSED GROUND FLOOR PLAN
| 30 HG_P 201 | 19 Dec 2024 |
PROPOSED GROUND FLOOR PLAN
| 30 HG_P 202 | 19 Dec 2024 |
Proposed Location and Site Plan
| 30 HG_P 200 | 19 Dec 2024 |
PROPOSED REAR ELEVATION
| 30 HG_P 213 | 19 Dec 2024 |
PROPOSED SECTION AA
| 30 HG_P 221 | 19 Dec 2024 |
PROPOSED SECTION BB
| 30 HG_P 222 | 19 Dec 2024 |
PROPOSED SECTION CC
| 30HG_P 223 | 19 Dec 2024 |
PROPOSED SECTION DD
| 30 HG_P 224 | 19 Dec 2024 |