Planning application number: 18/3310/FUL

Site address

Kew Biothane Plant Melliss Avenue Kew (View Site Plan)

View

Status:

Granted Permission 16/09/2020

Latest: Decision Issued

Level: Committee Decision

Details

Proposal

Demolition of existing buildings and structures, and redevelopment of the site to provide a 4-6 storey specialist extra care facility for the elderly with existing health conditions, comprising of 88 units, communal healthcare, therapy, leisure and social facilities (including a Restaurant/bar/cafe and swimming pool). Provision of car and cycle parking, associated landscaping and publicly accessible amenity space including a childrens play area.

Type

Full Application

Ward

KEW WARD - Historic From 06/05/2022

Applicant

Show applicant details

Agent

Mr Marlon Deam 100 Pall Mall London SW1Y 5NQ

Officer

Nicki Dale

Site plan

View Site Plan

Progress

A decision has been issued by the authority.

A copy of the decision notice will appear in the case file soon, and within a maximum of two weeks.
  • Application Received: 08/10/2018
  • Validated: 08/10/2018
  • Neighbour notification started: 15/07/2019
  • Neighbour notification ended: 27/03/2019
  • Decision Issued: 16/09/2020

Documents and images

DescriptionReferenceDate Published
PA1-04 - EXISTING SITE PLAN_FLOOD DEFENCE PA1-04 .218 Dec 2018
PROPOSED SITE PLAN_FLOOD DEFENCE PA02.01 REV 218 Dec 2018
WASTE COLLECTION SK06 REV 118 Dec 2018
LANDSCAPE SECTION LANDSCAPE SECTION03 Jan 2019
SOILING PLAN SOILING PLAN03 Jan 2019
General Arrangement Plan - Level 1 North PA2.12 106 Mar 2019
General Arrangement Plan - Level 1-3 South PA2.14 106 Mar 2019
General Arrangement Plan - Level 2-3 North PA2.13 106 Mar 2019
General Arrangement Plan - Level Ground North PA2.10 106 Mar 2019
General Arrangement Plan - Level Ground South PA2.11 106 Mar 2019
Proposed Ground Floor Plan PA2.02 206 Mar 2019
Proposed Level 1 Plan PA2.03 206 Mar 2019
Proposed Level 2 Plan PA2.04 206 Mar 2019
Proposed Level 3 Plan PA2.05 206 Mar 2019
ARBORICULTURAL IMPLICATIONS PLAN 1579-MA-WA-DT-GF-DR-L-005 REV B07 Mar 2019
Biodiversity Strategy 1579-MA-WA-DT-GF-DR-L-004 REV B07 Mar 2019
Hardworks Plan 1579-MA-WA-DT-GF-DR-L-003 REV B07 Mar 2019
LANDSCAPE SECTIONS 1579-MA-WA-DT-GF-DR-L-007 REV B07 Mar 2019
Landscape Sections 1579-MA-WA-DT-GF-DR-L-008 REV B07 Mar 2019
MASTERPLAN 1579-MA-WA-DT-GF-DR-L-001 REV B07 Mar 2019
SOFTWORKS PLAN 1579-MA-WA-DT-GF-DR-L-002 REV B07 Mar 2019
SOILING PLAN 1579-MA-WA-DT-GF-DR-L-006 REV B07 Mar 2019
TREE PIT DETAILS 1579-MA-WA-DT-GF-DR-L-00907 Mar 2019
Development Data PA0.03 217 Apr 2019
Drawing Cover Sheet  17 Apr 2019
Drawing List PA0.02 317 Apr 2019
End Cover Sheet  17 Apr 2019
General Arrangement Plan-Level 4 North PA2.15 217 Apr 2019
General Arrangement Plan-Level 4 South PA2.16 217 Apr 2019
General Arrangement Plan-Level 5 North PA2.17 217 Apr 2019
General Arrangement Plan-Level 5 South PA2.18 217 Apr 2019
Proposed East Elevation PA3.04 317 Apr 2019
Proposed Level 4 Plan PA2.06 317 Apr 2019
Proposed Level 46Plan PA2.07 317 Apr 2019
Proposed Level Roof PA2.08 317 Apr 2019
Proposed North Elevation PA3.05 317 Apr 2019
Proposed Section D+E PA4.03 317 Apr 2019
Proposed Section F+G PA4.04 317 Apr 2019
Proposed Section H+J PA4.05 317 Apr 2019
Proposed Site Plan PA2.01 317 Apr 2019
Proposed South Elevation PA3.06 317 Apr 2019
Arboricultural Implications Plan 005 C08 May 2019
Biodiversity Strategy 004 B08 May 2019
Hardworks 003 B08 May 2019
Marterplan 001 C08 May 2019
Softworks Plan 002 C08 May 2019
Soiling Plan 006 C08 May 2019