Planning application number: 18/0547/FUL

Site address

The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET (View Site Plan)

View

Status:

Refused Permission 18/08/2021

Latest: Decision Issued

Level: Other Council

Details

Proposal

APPLICATION A: Hybrid application to include 1. The demolition of existing buildings and structures, except The Maltings and the façade of the Bottling Plant and former Hotel; Site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site: 2. Detailed application for works to the east side of Ship Lane which comprise: a. Alterations and extensions to existing buildings; erection of buildings (3 to 8 storeys) plus basements to allow for 439 residential apartments; Flexible use floorspace for various commercial uses, community and leisure; and hotel, cinema, gym and office floorspace b. New pedestrian, vehicle and cycle accesses and associated highway works c. Provision of on-site cycle, vehicle and service parking at surface and basement level d. Provision of public open space, amenity and play space and landscaping e. Flood defence and towpath works f. Installation of plant and energy centres 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise: a) Single storey basement and buildings varying in height from 3 to 7 storeys b) Residential development of up to 224 units c) Nursing and care home (up to 80 ensuite rooms) with associated facilities d) Up to 150 units of flexible use living accommodation for either assisted living or residential use e) New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works f) Provision of on-site cycle, vehicle and service parking g) Provision of public open space, amenity and play space and landscaping. FOR FULL DESCRIPTION OF DEVELOPMENT, REFER TO ACCOMPANYING COVERING LETTER, WHICH CAN BE VIEWED ON THE APPLICATION FILE, ON OUR WEBSITE.

Type

Full Application

Ward

MORTLAKE, BARNES COMMON WARD - Historic From 06/05/2022

Applicant

Show applicant details

Agent

Mr Kevin Watson 72 Welbeck Street London W1G 0AY

Officer

Lucy Thatcher

Site plan

View Site Plan

Progress

A decision has been issued by the authority.

A copy of the decision notice will appear in the case file soon, and within a maximum of two weeks.
  • Application Received: 19/02/2018
  • Validated: 29/03/2018
  • Neighbour notification started: 09/04/2018
  • Neighbour notification ended: 09/05/2018
  • Decision Issued: 18/08/2021

Documents and images

DescriptionReferenceDate Published
Application A Block Plan C645_Z0_P_00_00205 Apr 2018
Application A Red Line Site Location Plan C645_Z0_P_00_00505 Apr 2018
Development Area 1 & Development Area 2 Boundaires JA12_Z0_P_00_00805 Apr 2018
revised planning drawing list  20 Jun 2019
building 02 - proposed accessible unit apartment 2.5.9 C645_B02_P_05_003 REV A21 Jun 2019
building 02 - proposed accessible unit apartment 2.6.6 C645_B02_P_06_002 REV A21 Jun 2019
building 02 - proposed fifth floor plan C645_B02_P_05_001 REV A21 Jun 2019
building 02 - proposed sixth floor plan C645_B02_P_06_001 REV A21 Jun 2019
building 02 - proposed south elevation 2 C645_B02_E_S_001 REV A21 Jun 2019
building 02 - proposed typical floor plan C645_B02_P_TY_001 REV A21 Jun 2019
building 02 - proposed west elevation 1 C645_B02_E_W_001 REV A21 Jun 2019
building 02 - proposed west elevation 2 C645_B02_E_W_002 REV A21 Jun 2019
building 05 - proposed east and north elevations C645_B05_E_E_001 REV A21 Jun 2019
building 05 - proposed north and west elevations C645_B05_E_N_001 REV A21 Jun 2019
building 07 - proposed fifth floor plan C645_B07_P_05_001 REV A21 Jun 2019
building 07 - proposed sixth floor plan C645_B07_P_06_001 REV A21 Jun 2019
building 07 - proposed typical floor plan C645_B07_P_TY_001 REV A21 Jun 2019
building 08 - accessible unit apartment 8.TY.10 C645_B08_P_TY_002 REV A21 Jun 2019
building 08 - accessible unit apartment 8.TY.5 C645_B08_P_TY_00321 Jun 2019
building 08 - proposed fifth floor plan C645_B08_P_05_001 REV A21 Jun 2019
building 08 - proposed sixth floor plan C645_B08_P_06_001 REV A21 Jun 2019
building 08 - proposed typical floor plan C645_B08_P_TY_001 REV A21 Jun 2019
building 10 - proposed fourth floor plan C645_B10_P_04_001 REV A21 Jun 2019
buildings 18 and 19 indicative layouts - typical floor plan C645_Z2_P_TY_001 REV21 Jun 2019
development area 1 landscape GA plan P10736-00-001-103 REV D0421 Jun 2019
mansion typology bay study elevation - retail frontage C645_Z1_E_01_00421 Jun 2019
porposed site side landscape level plan P10736-00-001-105 REV D0221 Jun 2019
proposed development area 1 - seating plan P10736-00-001-104 REV D0221 Jun 2019
proposed site elevation RR C645_Z2_E_RR_00121 Jun 2019
propossed site section AA C645_Z1_S_AA_00121 Jun 2019
Z3 school - proposed elevations C645_Z3_E_AL_ 001 REV A21 Jun 2019
Z3 school - proposed ground floor plan C645_Z3_P_ 00_ 001 REV A21 Jun 2019
Z3 school - proposed roof plan C645_Z3_P_ RF_001 REV A21 Jun 2019
Z3 school - proposed site plan C645_Z3_P_ AL_001 REV A21 Jun 2019
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION - FIVE STOREYS 16019_C645_Z2_P_PR_003_A29 Jan 2020
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION - FOUR STOREYS 16019_C645_Z2_P_PR_002_A -29 Jan 2020
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION - ONE TO THREE STOREYS 16019_C645_Z2_P_PR_001_A -29 Jan 2020
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION - SEVEN STOREYS 16019_C645_Z2_P_PR_005_A29 Jan 2020
BLOCK FOOTPRINT AND HORIZONTAL LINES OF DEVIATION - SIX STOREYS 16019_C645_Z2_P_PR_004_A29 Jan 2020
Revised Highway Layout _ Possible Areas for Adoption 38262-5501-100 B29 Jan 2020
Revised Highways Layout 38262-5501-58 H29 Jan 2020
REVISED SITE ELEVATION / SECTION 16019_C645_Z1_E_BB_001_B29 Jan 2020
REVISED SITE ELEVATION / SECTION 16019_C645_Z1_E_DD_001_B29 Jan 2020
REVISED SITE ELEVATION / SECTION 16019_C645_Z1_E_EE_001_B29 Jan 2020
REVISED SITE ELEVATION / SECTION 16019_C645_Z1_E_FF_001_B29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z1_E_GG_001_B29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z1_E_HH_001_B29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z1_S_AA_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z1_S_BB_001_B29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z1_S_CC_001_B29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_JJ_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_KK_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_LL_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_LL_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_MM_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_NN_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_OO_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_PP_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_QQ_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_E_RR_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_S_DD_001_B29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_S_EE_001_A29 Jan 2020
Revised Site Elevation / Section 16019_C645_Z2_S_FF_001_A29 Jan 2020
5TH FLOOR OBSCURE GLAZING EXERCISE SQP_ZZ_SK_02812 Aug 2020
6TH FLOOR OBSCURE GLAZING EXERCISE SQP_ZZ_SK_03012 Aug 2020
7TH FLOOR OBSCURE GLAZING EXERCISE SQP_ZZ_SK_03212 Aug 2020
8TH FLOOR OBSCURE GLAZING EXERCISE SQP_ZZ_SK_03412 Aug 2020
ALTERNATIVE PHASE 1 MASTERPLAN 16019-G100_P1_P_TY_001_A12 Aug 2020
BOTTLING AND FOMER HOTEL BUILDING BAY STUDY - EXISTING FACADE C645_Z1_E_01_007_C12 Aug 2020
BOTTLING AND HOTEL BUILDING BAY STUDY - EXISTING FACADE OFFICE C645_Z1_E_01_005C12 Aug 2020
BUILDING 02 - PROPOSED EAST ELEVATION C645_B02_E_E_001_C12 Aug 2020
BUILDING 02 - PROPOSED NORTH ELEVATION C645_B02_E_N_001_C12 Aug 2020
BUILDING 02 - PROPOSED NORTH ELEVATION 02 C645_B02_E_N_002_C12 Aug 2020
BUILDING 02 - PROPOSED SOUTH ELEVATION C645_B02_S_N_001_C12 Aug 2020
BUILDING 02 - PROPOSED WEST ELEVATION 01 C645_B02_W_N_001_C12 Aug 2020
BUILDING 02 - PROPOSED WEST ELEVATION 02 C645_B02_W_N_002_C12 Aug 2020
BUILDING 02 ACCESSIBLE UNIT APARTMENT 2.G.2 C645_B02_P_00_002 C12 Aug 2020
BUILDING 02 ACCESSIBLE UNIT APARTMENT 2.G.3 C645_B02_P_00_003 C12 Aug 2020
BUILDING 02 ACCESSIBLE UNIT APARTMENT 2.G.4 C645_B02_P_00_004 C12 Aug 2020
BUILDING 02 ACCESSIBLE UNIT APARTMENT 2.G.6 C645_B02_P_00_005 C12 Aug 2020
BUILDING 02 ACCESSIBLE UNIT APARTMENT 2.G.7 C645_B02_P_00_006 C12 Aug 2020
BUILDING 02 ACCESSIBLE UNIT APARTMENT 2.TY1.17 C645_B02_P_TY1_003 C12 Aug 2020
BUILDING 02 ACCESSIBLE UNIT APARTMENT 2.TY1.3 C645_B02_P_TY1_002 C12 Aug 2020
BUILDING 03 - GF LEVEL REFUSE STORE PLANS C645_B03_P_00_004_C12 Aug 2020
BUILDING 03 - PROPOSED EAST ELEVATION C645_B03_E_E_001_C12 Aug 2020
BUILDING 03 - PROPOSED NORTH ELEVATION C645_B03_E_N_001_C12 Aug 2020
BUILDING 03 - PROPOSED SOUTH ELEVATION C645_B03_E_S_001_C12 Aug 2020
BUILDING 03 - PROPOSED WEST ELEVATION C645_B03_E_W_001_C12 Aug 2020
BUILDING 03 ACCESSIBLE UNIT APARTMENT 3.5.4 C645_B03_P_05_002 C12 Aug 2020
BUILDING 03 ACCESSIBLE UNIT APARTMENT 3.G.1 C645_B03_P_00_002 C12 Aug 2020
BUILDING 03 ACCESSIBLE UNIT APARTMENT 3.G.3 C645_B03_P_00_003 C12 Aug 2020
BUILDING 03 ACCESSIBLE UNIT APARTMENT 3.G.3 C645_B03_P_00_003 C12 Aug 2020
BUILDING 03 ACCESSIBLE UNIT APARTMENT 3.TY.4 C645_B03_P_TY_002 C12 Aug 2020
BUILDING 04 - GF LEVEL REFUSE STORE PLANS C645_B04_P_00_002_C12 Aug 2020
BUILDING 04 - PROPOSED EAST ELEVATION C645_B04_E_E_001_C12 Aug 2020
BUILDING 04 - PROPOSED NORTH ELEVATION C645_B04_E_N_001_C12 Aug 2020
BUILDING 04 - PROPOSED SOUTH ELEVATION C645_B04_E_S_001_C12 Aug 2020
BUILDING 04 - PROPOSED WEST ELEVATION C645_B04_E_W_001_C12 Aug 2020
BUILDING 04 ACCESSIBLE UNIT APARTMENT 4.1.2 C645_B04_P_01_002 C12 Aug 2020
BUILDING 04 ACCESSIBLE UNIT APARTMENT 4.1.3 C645_B04_P_01_003 C12 Aug 2020
BUILDING 04 ACCESSIBLE UNIT APARTMENT 4.2.2 C645_B04_P_02_002 C12 Aug 2020
BUILDING 04 ACCESSIBLE UNIT APARTMENT 4.5.3 C645_B04_P_05_003 C12 Aug 2020
BUILDING 05 - PROPOSED BOTTLEWORKS ELEVATION C645_B05_E_H_001_C12 Aug 2020
BUILDING 05 - PROPOSED EAST AND NORTH ELEVATION C645_B05_E_Z_001_C12 Aug 2020
BUILDING 05 - PROPOSED NORTH AND WEST ELEVATION C645_B05_E_Z_002_C12 Aug 2020
BUILDING 05 - PROPOSED SOUTH ELEVATION C645_B05_E_S_001_C12 Aug 2020
BUILDING 06 - GF LEVEL REFUSE STORE PLANS C645_B06_P_00_002_C12 Aug 2020
BUILDING 06 - PROPOSED EAST ELEVATION C645_B06_E_E_001_C12 Aug 2020
BUILDING 06 - PROPOSED NORTH ELEVATION C645_B06_E_N_001_C12 Aug 2020
BUILDING 06 - PROPOSED SOUTH ELEVATION C645_B06_E_S_001_C12 Aug 2020
BUILDING 06 - PROPOSED SOUTH ELEVATION 02 C645_B06_E_S_002_C12 Aug 2020
BUILDING 06 - PROPOSED WEST ELEVATION C645_B06_E_W_001_C12 Aug 2020
BUILDING 06 ACCESSIBLE UNIT APARTMENT 6.TY.5 C645_B06_P_TY_002 C12 Aug 2020
BUILDING 07 - PROPOSED EAST ELEVATION C645_B07_E_E_001_C12 Aug 2020
BUILDING 07 - PROPOSED NORTH ELEVATION C645_B07_E_N_001_C12 Aug 2020
BUILDING 07 - PROPOSED SOUTH ELEVATION C645_B07_E_S_001_C12 Aug 2020
BUILDING 07 - PROPOSED WEST ELEVATION C645_B07_E_W_001_C12 Aug 2020
BUILDING 07 ACCESSIBLE UNIT APARTMENT 7.G.1 C645_B07_P_00_002 C12 Aug 2020
BUILDING 08 - GF LEVEL REFUSE STORE PLANS C645_B08_P_00_002_C12 Aug 2020
BUILDING 08 - PROPOSED EAST ELEVATION C645_B08_E_E_001_C12 Aug 2020
BUILDING 08 - PROPOSED NORTH ELEVATION C645_B08_E_N_001_C12 Aug 2020
BUILDING 08 - PROPOSED SOUTH ELEVATION C645_B08_E_S_001_C12 Aug 2020
BUILDING 08 - PROPOSED WEST ELEVATION 01 C645_B08_E_W_001_C12 Aug 2020
BUILDING 08 - PROPOSED WEST ELEVATION 02 C645_B08_E_W_002_C12 Aug 2020
BUILDING 08 ACCESSIBLE UNIT APARTMENT 8.G.3 C645_B08_P_00_003 C12 Aug 2020
BUILDING 08 ACCESSIBLE UNIT APARTMENT 8.G.5 C645_B08_P_00_002 C12 Aug 2020
BUILDING 08 ACCESSIBLE UNIT APARTMENT 8.TY1.4 C645_B08_P_TY1_002 C12 Aug 2020
BUILDING 08 ACCESSIBLE UNIT APARTMENT 8.TY1.5 C645_B08_P_TY1_003 C12 Aug 2020
BUILDING 09 - GF LEVEL REFUSE STORE PLANS C645_B09_P_00_002_C12 Aug 2020
BUILDING 09 - PROPOSED EAST ELEVATION C645_B09_E_E_001_C12 Aug 2020
BUILDING 09 - PROPOSED NORTH ELEVATION C645_B09_E_N_001_C12 Aug 2020
BUILDING 09 - PROPOSED SOUTH ELEVATION C645_B09_E_S_001_C12 Aug 2020
BUILDING 09 - PROPOSED WEST ELEVATION C645_B09_E_W_001_C12 Aug 2020
BUILDING 09 ACCESSIBLE UNIT APARTMENT 9.TY.1 C645_B09_P_TY_002 C12 Aug 2020
BUILDING 10 - GF LEVEL REFUSE STORE PLANS C645_B10_P_00_002_C12 Aug 2020
BUILDING 10 - PROPOSED EAST ELEVATION C645_B10_E_E_001_C12 Aug 2020
BUILDING 10 - PROPOSED NORTH ELEVATION C645_B10_E_N_001_C12 Aug 2020
BUILDING 10 - PROPOSED SOUTH ELEVATION C645_B10_E_S_001_C12 Aug 2020
BUILDING 10 - PROPOSED WEST ELEVATION C645_B10_E_W_001_C12 Aug 2020
BUILDING 10 ACCESSIBLE UNIT APARTMENT 10.TY.7 C645_B10_P_TY_002 C12 Aug 2020
BUILDING 11 - PROPOSED EAST ELEVATION C645_B11_E_E_001_C12 Aug 2020
BUILDING 11 - PROPOSED NORTH ELEVATION C645_B11_E_N_001_C12 Aug 2020
BUILDING 11 - PROPOSED SOUTH ELEVATION C645_B11_E_S_001_C12 Aug 2020
BUILDING 11 - PROPOSED WEST ELEVATION C645_B11_E_W_001_C12 Aug 2020
BUILDING 11 ACCESSIBLE UNIT APARTMENT 11.G.1 C645_B11_P_00_002 C12 Aug 2020
BUILDING 11 ACCESSIBLE UNIT APARTMENT 11.G.2 C645_B11_P_00_003 C12 Aug 2020
BUILDING 12 - GF LEVEL REFUSE STORE PLANS C645_B12_P_00_002_C12 Aug 2020
BUILDING 12 - PROPOSED EAST ELEVATION C645_B12_E_E_001_C12 Aug 2020
BUILDING 12 - PROPOSED NORTH ELEVATION 01 C645_B12_E_N_001_C12 Aug 2020
BUILDING 12 - PROPOSED NORTH ELEVATION 02 C645_B12_E_N_002_C12 Aug 2020
BUILDING 12 - PROPOSED SOUTH ELEVATION 02 C645_B12_E_S_001_C12 Aug 2020
BUILDING 12 - PROPOSED WEST ELEVATION 02 C645_B12_E_W_001_C12 Aug 2020
BUILDING 12 ACCESSIBLE UNIT APARTMENT 12.G.1 C645_B12_P_00_002 C12 Aug 2020
BUILDING 12 ACCESSIBLE UNIT APARTMENT 12.G.2 C645_B12_P_00_003 C12 Aug 2020
LOCATION OF ELEVATIONS WITH ELEVATIONAL RESTRICTIONS SQP-ZZ-SK-04312 Aug 2020
OTTLING BUILDING BAY STUDY- NEW FACADE C645_Z1_E_01_006C12 Aug 2020
POSSIBLE SHEEN LANE AND LEVEL CROSSING IMPROVEMENTS 38262-5501-95 F12 Aug 2020
PROPOSED DEVELOPMENT AREA 01 - BASEMENT PLAN C645_Z1_P_B1_001_C12 Aug 2020
PROPOSED DEVELOPMENT AREA 01 - BASEMENT SECTION AA C645_Z1_S_B1_001_A12 Aug 2020
PROPOSED DEVELOPMENT AREA 01 - BASEMENT SECTION BB C645_Z1_S_B1_002_A12 Aug 2020
PROPOSED DEVELOPMENT AREA 01 GROUND LEVEL PLAN C645_Z1_P_00_001_C12 Aug 2020
PROPOSED DEVELOPMENT AREA 01 TYPICAL LEVEL PLAN C645_Z1_P_TY_001_C12 Aug 2020
PROPOSED DEVELOPMENT AREA 02 - BASEMENT PLAN C645_Z2_P_B1_001_C12 Aug 2020
PROPOSED DEVELOPMENT AREA 02 - BASEMENT SECTION CC C645_Z2_S_B1_001_A12 Aug 2020
PROPOSED DEVELOPMENT AREA 02 GROUND LEVEL PLAN C645_Z2_P_00_001_C12 Aug 2020
PROPOSED DEVELOPMENT AREA 02 GROUND LEVEL PLAN C645_Z2_P_00_002_C12 Aug 2020
PROPOSED DEVELOPMENT AREA 02 TYPICAL LEVEL PLAN C645_Z2_P_TY_001_C12 Aug 2020
PROPOSED DEVELOPMENT AREA 02 TYPICAL LEVEL PLAN C645_Z2_P_TY_002_C12 Aug 2020
PROPOSED HIGHWAY LAYOUT CLIFFORD AVE/LOWER RICHMOND RD (CHALKERS CORNER) 38262-5501-001 A12 Aug 2020
PROPOSED HIGHWAY LAYOUT LOWER RICHMOND RD/MORTLAKE HIGH ST 38262-5501-00212 Aug 2020
PROPOSED MANSION TYPOLOGY BAY STUDY ELEVATION DOUBLE GABLE C645_Z1_E_01_001_C12 Aug 2020
PROPOSED MANSION TYPOLOGY BAY STUDY ELEVATION SINGLE GABLE C645_Z1_E_01_002_C12 Aug 2020
PROPOSED MANSION TYPOLOGY BAY STUDY ELEVATION SINGLE GABLE C645_Z1_E_01_003C12 Aug 2020
PROPOSED MASTERPLAN TYPICAL FLOOR LEVEL C645_MP_P_TY_001_C12 Aug 2020
PROPOSED SITE ELEVATION CC C645_Z1_E_CC_001_C12 Aug 2020
PROPOSED SITE ELEVATION DD C645_Z1_E_DD_001_C12 Aug 2020
PROPOSED SITE ELEVATION EE C645_Z1_E_EE_001_C12 Aug 2020
PROPOSED SITE ELEVATION FF C645_Z1_E_FF_001_C12 Aug 2020
PROPOSED SITE ELEVATION GG C645_Z1_E_GG_001_C12 Aug 2020
PROPOSED SITE ELEVATION JJ C645_Z2_E_JJ_001_C12 Aug 2020
PROPOSED SITE ELEVATION KK C645_Z2_E_KK_001_C12 Aug 2020
PROPOSED SITE ELEVATION LL C645_Z2_E_LL_001_C12 Aug 2020
PROPOSED SITE ELEVATION MM C645_Z2_E_MM_001_C12 Aug 2020
PROPOSED SITE ELEVATION NN C645_Z2_E__001_C12 Aug 2020
PROPOSED SITE ELEVATION NN C645_Z2_E_NN_001_C12 Aug 2020
PROPOSED SITE ELEVATION OO C645_Z2_E_OO_001_C12 Aug 2020
PROPOSED SITE ELEVATION PP C645_Z2_E_PP_001_C12 Aug 2020
PROPOSED SITE ELEVATION QQ C645_Z2_E_QQ_001_C12 Aug 2020
PROPOSED SITE SECTION BB C645_Z1_S_BB_001_C12 Aug 2020
PROPOSED SITE SECTION CC C645_Z1_S_CC_001_C12 Aug 2020
PROPOSED SITE SECTION DD C645_Z2_S_DD_001_C12 Aug 2020
PROPOSED SITE SECTION DD - HEIGHTS AND LEVELS SQP_ZZ_SK_03612 Aug 2020
PROPOSED SITE SECTION FF C645_Z2_S_FF_001_C12 Aug 2020
PROPOSED SITE SECTION FF - HEIGHTS AND LEVELS SQP_ZZ_SK_03712 Aug 2020
PROPOSED SITE SECTION JJ - HEIGHTS AND LEVELS SQP_ZZ_SK_03912 Aug 2020
PROPOSED SITE SECTION KK - HEIGHTS AND LEVELS SQP_ZZ_SK_04012 Aug 2020
PROPOSED SITE SECTION LL - HEIGHTS AND LEVELS SQP_ZZ_SK_03812 Aug 2020
PROPOSED SITE SECTION OO - HEIGHTS AND LEVELS SQP_ZZ_SK_04112 Aug 2020
PROPOSED SITE SECTION QQ - HEIGHTS AND LEVELS SQP_ZZ_SK_04212 Aug 2020
PROPOSED WAREHOUSE TYPOLOGY BAY STUDY C645_Z1_E_01_009_C12 Aug 2020
PROPSOED MASTERPLAN GF LEVEL C645_MP_P_00_001_C12 Aug 2020
SCHOOL ACCESS ROAD, TEMPORARY ACCESS ROAD AND TOWPATH WORKS 38262-5501-108 E12 Aug 2020
BOAT HOUSE ACCESS TO EXISTING PUBLIC DRAW DOCK PLAN P10736-00-001-310-0113 Aug 2020
CHALKERS CORNER ILLUSTRATIVE GENERAL ARRANGEMENT P10736-00-003-GIL-0111-0213 Aug 2020
CHALKERS CORNER ILLUSTRATIVE PROPOSED LANDSCAPE MASTERPLAN P10736-00-003-GIL-0110-0113 Aug 2020
CONDITIONS PLOT PLAN C645_MP_P_00_00513 Aug 2020
CONDITIONS PLOT PLAN(BASEMENT WORKS ONLY) C645_MP_P_00_00613 Aug 2020
CYCLE CIRCULATION PARAMETER PLAN P10736-00-001-125-0513 Aug 2020
DEVELOPMENT AREA 1 FLOOD DEFENCE PLAN P10736-00-001-116-0313 Aug 2020
DEVELOPMENT AREA 1 LANDSCAPE GA PLAN P10736-00-001-103-0513 Aug 2020
DEVELOPMENT AREA 1 LANDSCAPE RENDERED MASTERPLAN P10736-00-001-102-0313 Aug 2020
ENTRY PLAZA SECTION P10736-00-001-201-0313 Aug 2020
EXISTING SITE WIDE HARD LANDSCAPE PLAN P10736-00-001-141-0213 Aug 2020
GREEN LINK SECTION P10736-00-001-200-0513 Aug 2020
HARD AND SOFT LANDSCAPE PARAMETER PLAN P10736-00-001-120-0913 Aug 2020
INDICATIVE PROPOSED LANDSCAPE SITE WIDE GENERAL ARRANGEMENT P10736-00-001-101-1013 Aug 2020
INDICATIVE PROPOSED WATERSPORTS CENTRE P10736-00-001-150-0013 Aug 2020
LANDSCAPE PRINCIPLES PLAN P10736-00-001-122-0313 Aug 2020
LOWER RICHMOND ROAD SECTION P10736-00-001-210-0413 Aug 2020
OPEN AND PLAY SPACE PARAMETER PLAN P10736-00-001-123-0713 Aug 2020
OPEN SPACE PARAMETER PLAN P10736-00-001-121-0613 Aug 2020
PEDESTRIAN CIRCULATION PARAMETER PLAN P10736-00-001-126-0413 Aug 2020
PROPOSED BOTTLEWORKS SQUARE SECTION P10736-00-001-204-0313 Aug 2020
PROPOSED DETAILED APPLICATION TYPICAL COURTYARD SECTION P10736-00-001-211-0513 Aug 2020
PROPOSED DEVELOPMENT AREA 1 - SEATING PLAN P10736-00-001-104-0513 Aug 2020
PROPOSED MALTINGS PLAZA SECTION P10736-00-001-205-0413 Aug 2020
PROPOSED RIVER TERRACE BOUNDARY WALL TREATMENT PLAN P10736-00-001-106-1113 Aug 2020
PROPOSED RIVER TERRACE SECTION 1 P10736-00-001-206-0413 Aug 2020
PROPOSED RIVER TERRACE SECTION 2 P10736-00-001-207-0413 Aug 2020
PROPOSED SHIP LANE SECTION 1 P10736-00-001-208-0413 Aug 2020
PROPOSED SHIP LANE SECTION 2 P10736-00-001-209-0413 Aug 2020
PROPOSED SITE WIDE CIRCULATION PLAN - CYCLE P10736-00-001-108-0313 Aug 2020
PROPOSED SITE WIDE CIRCULATION PLAN - PEDESTRIAN P10736-00-001-109-0313 Aug 2020
PROPOSED SITE WIDE CIRCULATION PLAN - VEHICULAR P10736-00-001-107-0313 Aug 2020
PROPOSED SITE WIDE HARD LANDSCAPE PLAN P10736-00-001-140-0313 Aug 2020
PROPOSED SITE WIDE LANDSCAPE LEVEL PLAN P10736-00-001-105-0313 Aug 2020
PROPOSED SITE WIDE LANDSCAPE RENDERED MASTERPLAN P10736-00-001-100-0313 Aug 2020
RAIN GARDEN TYPICAL DETAIL P10736-00-001-300-0213 Aug 2020
RAIN GARDEN WITH TREE PIT TYPICAL DETAIL P10736-00-001-301-0313 Aug 2020
RESIDENTIAL STREET SECTION P10736-00-001-203-0313 Aug 2020
RIVERWALL ELEVATION FROM TOWPATH P10736-00-001-220-0213 Aug 2020
SCHOOL LANDSCAPE GA PLAN (FINAL) P10736-00-001-133-1113 Aug 2020
SCHOOL LANDSCAPE GA PLAN (INTERIM) P10736-00-001-132-1013 Aug 2020
SCHOOL RENDERED MASTERPLAN (FINAL) P10736-00-001-131-0913 Aug 2020
SCHOOL RENDERED MASTERPLAN (INTERIM) P10736-00-001-130-0913 Aug 2020
THAMES STREET SECTION P10736-00-001-202-0313 Aug 2020
TYPICAL EXTENSIVE BROWN ROOF DETAIL P10736-00-001-213-0013 Aug 2020
TYPICAL EXTENSIVE BROWN ROOF DETAIL P10736-00-001-400-0113 Aug 2020
TYPICAL EXTENSIVE GREEN ROOF DETAIL P10736-00-001-212-0013 Aug 2020
TYPICAL EXTENSIVE GREEN ROOF DETAIL P10736-00-001-401-0113 Aug 2020
TYPICAL RESIDENTAIL STREET PIT OVER BASEMENT CAR PARK DETAIL P10736-00-001-302-0413 Aug 2020
TYPICAL TREE AND PLANTING IN GREEN LINK DETAIL P10736-00-001-303-0313 Aug 2020
VEHICULAR CIRCULATION PARAMETER PLAN P10736-00-001-124-0413 Aug 2020
building 01 - porposed west elevation C645_B01_E_W_001_D30 Sep 2020
building 01 - proposed basement 01 plan C645_B01_P_B1_001_C30 Sep 2020
building 01 - proposed basement 02 plan C645_B01_P_B2_001_C30 Sep 2020
building 01 - proposed east elevation C645_B01_E_E_001_D30 Sep 2020
building 01 - proposed first floor plan C645_B01_P_01_001_C30 Sep 2020
building 01 - proposed ground floor plan C645_B01_P_00_001_C30 Sep 2020
building 01 - proposed north elevation C645_B01_E_N_001_D30 Sep 2020
building 01 - proposed roof plan C645_B01_P_RF_001_D30 Sep 2020
building 01 - proposed second floor plan C645_B01_P_02_001_C30 Sep 2020
building 01 - proposed south elevation C645_B01_E_S_001_D30 Sep 2020
building 01 - proposed third floor plan C645_B01_P_03_001_D30 Sep 2020
building 02 - proposed eighth floor plan C645_B02_P_08_001_C30 Sep 2020
building 02 - proposed ninth floor plan C645_B02_P_09_001_C30 Sep 2020
building 02 - proposed roof plan C645_B02_P_RF_001_C30 Sep 2020
building 02 - proposed seventh floor plan C645_B02_P_07_001_C30 Sep 2020
building 02 - proposed typical floor plan 01 (second to fifth levels) C645_B02_P_TY1_001_C30 Sep 2020
building 02 - proposed typical floor plan 02 (first and sixth levels) C645_B02_P_TY2_001_C30 Sep 2020
building 02 -proposed ground floor plan C645_B02_P_00_001_C30 Sep 2020
building 03 - proposed fifth floor plan C645_B03_P_05_001_C30 Sep 2020
building 03 - proposed ground floor plan C645_B03_P_00_001_C30 Sep 2020
building 03 - proposed roof plan C645_B03_P_RF_001_C30 Sep 2020
building 03 - proposed sixth floor plan C645_B03_P_06_001_C30 Sep 2020
building 03 - proposed typical floor plan (first to fourth levels) C645_B03_P_TY_001_C30 Sep 2020
building 04 - proposed fifth floor plan C645_B04_P_05_001_C30 Sep 2020
building 04 - proposed first floor plan C645_B04_P_01_001_C30 Sep 2020
building 04 - proposed fourth floor plan C645_B04_P_04_001_C30 Sep 2020
building 04 - proposed ground floor plan C645_B04_P_00_001_C30 Sep 2020
building 04 - proposed roof plan C645_B04_P_RF_001_C30 Sep 2020
building 04 - proposed second floor plan C645_B04_P_02_001_C30 Sep 2020
building 04 - proposed seventh floor plan C645_B04_P_07_001_C30 Sep 2020
building 04 - proposed sixth floor plan C645_B04_P_06_001_C30 Sep 2020
building 04 - proposed third floor plan C645_B04_P_03_001_C30 Sep 2020
building 05 - proposed first floor plan C645_B05_P_01_001_C30 Sep 2020
building 05 - proposed ground floor plan C645_B05_P_00_001_C30 Sep 2020
building 05 - proposed lower ground floor plan C645_B05_P_LG_001_C30 Sep 2020
building 05 - proposed roof plan C645_B05_P_RF_001_C30 Sep 2020
building 05 - proposed second floor plan C645_B05_P_02_001_C30 Sep 2020
building 05 - proposed third floor plan C645_B05_P_03_001_C30 Sep 2020
building 06 - proposed fourth floor plan C645_B06_P_04_001_C30 Sep 2020
building 06 - proposed ground floor plan C645_B06_P_00_001_C30 Sep 2020
building 06 - proposed roof plan C645_B06_P_RF_001_C30 Sep 2020
building 06 - proposed typical floor plan (first to third levels) C645_B06_TY_RF_001_C30 Sep 2020
building 07 - proposed eighth floor plan C645_B07_P_08_001_C30 Sep 2020
building 07 - proposed ground floor plan C645_B07_P_00_001_C30 Sep 2020
building 07 - proposed ninth floor plan C645_B07_P_09_001_C30 Sep 2020
building 07 - proposed roof plan C645_B07_P_RF_001_C30 Sep 2020
building 07 - proposed seventh floor plan C645_B07_P_07_001_C30 Sep 2020
building 07 - proposed typical floor plan 01 (second to fifth levels) C645_B07_P_TY1_001_C30 Sep 2020
building 07 - proposed typical floor plan 02 (first and sixth levels) C645_B07_P_TY2_001_C30 Sep 2020
building 08 - proposed eighth floor plan C645_B08_P_08_001_C30 Sep 2020
building 08 - proposed ground floor plan C645_B08_P_00_001_C30 Sep 2020
building 08 - proposed roof plan C645_B08_P_RF_001_C30 Sep 2020
building 08 - proposed seventh floor plan C645_B08_P_07_001_C30 Sep 2020
building 08 - proposed typical floor plan 01 (second to fifth levels) C645_B08_P_TY1_001_C30 Sep 2020
building 08 - proposed typical floor plan 02 (first and sixth levels) C645_B08_P_TY2_001_C30 Sep 2020
building 09 - proposed fourth floor plan C645_B09_P_04_001_C30 Sep 2020
building 09 - proposed ground floor plan C645_B09_P_00_001_C30 Sep 2020
building 09 - proposed roof plan C645_B09_P_RF_001_C30 Sep 2020
building 09 - proposed typical floor plan (first to third levels) C645_B09_P_TY_001_C30 Sep 2020
building 10 - proposed fifth floor plan C645_B10_P_05_001_C30 Sep 2020
building 10 - proposed ground floor plan C645_B10_P_00_001_C30 Sep 2020
building 10 - proposed roof plan C645_B10_P_RF_001_C30 Sep 2020
building 10 - proposedtypical floor plan (first to fourth levels) C645_B10_P_TY_001_C30 Sep 2020
building 11 - proposed eighth floor plan C645_B11_P_08_001_C30 Sep 2020
building 11 - proposed ground floor plan C645_B11_P_00_001_C30 Sep 2020
building 11 - proposed roof plan C645_B11_P_RF_001_C30 Sep 2020
building 11 - proposed seventh floor plan C645_B11_P_07_001_C30 Sep 2020
building 11 - proposed typical floor plan 01 (second to fifth levels) C645_B11_P_TY1_001_C30 Sep 2020
building 11 - proposed typical floor plan 02 (first and sixth levels) C645_B11_P_TY2_001_C30 Sep 2020
building 12 - proposed fifth floor plan C645_B12_P_05_001_C30 Sep 2020
building 12 - proposed ground floor plan C645_B12_P_00_001_C30 Sep 2020
building 12 - proposed roof plan C645_B12_P_RF_001_C30 Sep 2020
building 12 - proposed seventh floor plan C645_B12_P_07_001_C30 Sep 2020
building 12 - proposed sixth floor plan C645_B12_P_06_001_C30 Sep 2020
building 12 -proposed typical floor plan (first to fourth levels C645_B12_P_TY_001_C30 Sep 2020
cinema bay study elevation C645_Z1_E_01_008_D30 Sep 2020
demoliton plan - development area 1 JA12_Z1_P_00_001_B30 Sep 2020
demoliton plan - entire site JA12_Z0_P_00_00230 Sep 2020
former bottling and hotel buildings - existing north and east elevation (2) demolition JA12_B5_E_ZZ_004_A30 Sep 2020
former maltings building - existing east elevation demolition JA12_B4_E_E_002_A30 Sep 2020
former maltings building - existing north elevation demolition JA12_B4_E_N_002_A30 Sep 2020
former maltings building - existing south elevation demolition JA12_B4_E_S_002_B30 Sep 2020
former maltings building - existing west elevation demolition JA12_B4_E_W_002_A30 Sep 2020
proposed site elevation AA C645_Z1_E_AA_001_D30 Sep 2020
proposed site elevation BB C645_Z1_E_BB_001_D30 Sep 2020
proposed site elevation HH C645_Z1_E_HH_001_D30 Sep 2020
proposed site elevation II C645_Z1_E_II_001_D30 Sep 2020
proposed site elevation RR C645_Z2_E_RR_001_D30 Sep 2020
proposed site section AA C645_Z1_S_AA_001_D30 Sep 2020
proposed site section EE C645_Z2_S_EE_001_D30 Sep 2020
proposed site wide landscape level plan P10736-00-001-105- D0330 Sep 2020
proposed site wide landscape rendered masterplan P10736-00-001-100 D0330 Sep 2020
red line site location and ownership plan JA12_Z0_P_00_004_B30 Sep 2020
red line site location plan JA12_Z0_P_00_003_A30 Sep 2020
site application boundaries C645_Z0_P_00_001_A30 Sep 2020
proposed masterplan ninth floor level - obscure glazing exercise SQP-ZZ-SK-03501 Oct 2020