Planning application number: 16/4553/FUL

Site address

63 - 71 High Street Hampton Hill (View Site Plan)

View

Status:

Granted Permission 31/05/2018

Latest: Decision Issued

Level: Committee Decision

Details

Proposal

Demolition of existing buildings on site and erection 2 buildings (two to four-storeys in height), set around outer and inner landscaped courtyards, comprising of 6 townhouses, 35 flats and two commercial units on the High Street frontage (110 sq.m GIA) and (118sq.m GIA) for use as A1(retail: non-food) and/or A1/A3 (coffee shop) and/or B1 (offices) and/or D1 (non-residential education and training centre) together with the formation of a basement to provide ancillary car parking (48 spaces), cycle storage, refuse storage rooms and plant rooms. 71 cycle spaces provided throughout the site.

Type

Full Application

Ward

FULWELL, HAMPTON HILL WARD - Historic From 06/05/2022

Applicant

Show applicant details

Agent

Mr Chris Francis 125 Metal Box Factory 30 Great Guildford Street London SE1 0HS

Officer

Brandan Wilkinson (Expired)

Site plan

View Site Plan

Progress

A decision has been issued by the authority.

A copy of the decision notice will appear in the case file soon, and within a maximum of two weeks.
  • Application Received: 30/11/2016
  • Validated: 20/12/2016
  • Neighbour notification started: 12/02/2018
  • Neighbour notification ended: 01/12/2017
  • Decision Issued: 31/05/2018

Documents and images

DescriptionReferenceDate Published
Proposed Basement Plan 07.11.2017 T20P-1 P130 Nov 2016
Proposed Wheelchair Adaptable Unit 102 07.11.2017 T70P00W30 Nov 2016
Green Roof Planting Plan 561.D.07 B08 Sep 2017
Masterplan 561.D.01 F08 Sep 2017
Planting Plan 561.D.03 F08 Sep 2017
Proposed Basement Floor Plan T(20) P-1 P108 Sep 2017
Proposed Elevation A High Street East Elevation T(20) E01 P108 Sep 2017
Proposed Elevation B South Side Elevation T(20) E02 P108 Sep 2017
Proposed Elevation C West Garden Elevation T(20) E03 P108 Sep 2017
Proposed Elevation D North Side Elevation T(20) E04 P108 Sep 2017
Proposed Elevation E Courtyard South Elevation T(20) E05 P108 Sep 2017
Proposed Elevation Section G Courtyard North Elevation T(20) E07 P108 Sep 2017
Proposed Elevation Section H Courtyard East Elevation T(20) E08 P108 Sep 2017
Proposed Elevation Section I Courtyard West Elevation T(20) E09 P108 Sep 2017
Proposed First Floor Plan T(20) P01 P108 Sep 2017
Proposed Ground Floor Plan T(20) P00 P108 Sep 2017
Proposed Roof Plan T(20) P04 P108 Sep 2017
Proposed Second Floor Plan T(20) P02 P108 Sep 2017
Proposed Section F T(20) E06 P108 Sep 2017
Proposed Third Floor Plan T(20) P03 P108 Sep 2017
Proposed Town House Elevations T(20) E10 P108 Sep 2017
Proposed Wheelchair Adaptable Unit 101 T(70) P01W08 Sep 2017
Proposed Wheelchair Adaptable Unit 102 T(70) P00W08 Sep 2017
Proposed Wheelchair Adaptable Unit 104 & 204 T(70) P02W08 Sep 2017
Roof Plan 561.D.02 C08 Sep 2017
Roof Terrace Planting Plan 561.D.06 C08 Sep 2017
Sections AA BB 561.D.04 C08 Sep 2017
Sections CC DD 561.D.05 C08 Sep 2017
Soiling Plan 561.D.08 D08 Sep 2017
561.D.05-SECTION CC DD 561.D.05-SECTION CC DD25 Oct 2017
HAMPTON HILL WITH INSERT OF INITIAL APPLICATION RESULTS HAMPTON HILL WITH INSERT OF INITIAL APPLICATION RESULTS25 Oct 2017
SUPPLEMENTAL DAYLIGHT & SUNLIGHT ASSESSMENT SUPPLEMENTAL DAYLIGHT & SUNLIGHT ASSESSMENT25 Oct 2017
Basment parking 29.11.2017 PB5253-SK02 REV 4 -21 Feb 2018
Green Roof Planting Plan 05.02.2018 561.D.07-21 Feb 2018
Masterplan 05.02.2018 561.D.01-21 Feb 2018
Planting Plan 05.02.2018 561.D.03-21 Feb 2018
Proposed Elevation B 31.01.2018 T20E02-[P3]21 Feb 2018
Proposed Elevation C 31.01.2018 T20E03-[P3]21 Feb 2018
Proposed Elevation D 31.01.2018 T20E04-[P2]21 Feb 2018
PRoposed Elevation E 31.01.2018 T20E05-[P2]21 Feb 2018
Proposed Elevation G T20E07-[P3]21 Feb 2018
Proposed Ground Floor Plan 05.02.2018 5903 T(20)P00 REV P421 Feb 2018
Proposed Roof Plan 31.01.2018 T20P04-[P6]21 Feb 2018
Proposed Second Floor Plan 31.01.2018 T20P02-[P5]21 Feb 2018
Proposed Section F 31.01.2018 T20E06-[P2]21 Feb 2018
Proposed Third Floor Plan 31.01.2018 T20P03-[P5]21 Feb 2018
Proposed Townhouse Elevations 31.01.2018 T20E10-[P2]21 Feb 2018
Proposed Wheelchair Adaptable Unit 101 07.11.2017 T70P01W21 Feb 2018
Proposed Wheelchair Adaptable Unit 104 07.11.2017 T70P02W21 Feb 2018
Roof Plan 05.02.2018 561.D.02-21 Feb 2018
Roof Terrace Planting Plan 05.02.2018 561.D.06-21 Feb 2018
Section AA BB 05.02.2018 561.D.04-21 Feb 2018
Section CC DD 05.02.2018 561.D.05-21 Feb 2018
Soiling Plan 05.02.2018 561.D.0821 Feb 2018
Swept Path Analysis - Access 30.11.2017 PB5253 SK03 REV P421 Feb 2018
Visibility Splays 30.11.2017 PB5253 SK02_A REV P421 Feb 2018